HomeMy WebLinkAbout259 Benedict Driveq
r
PPAlication No. .3022 Permit No.2762.......
P
0.
TO THE BUILDING INSPECTOR,
of the
TOWN OF SOUTH WINDSOR, CONN.
4
hereby make application for a permit to (erect (make alteration to) a building according
to the following detailed statement of the specifications and plans herewith submitted. (Draw a line through
word "erect" or words "make alteration to" as the case may require.)
All provisions of the Building By-Laws (Sections 2 to 32 inclusive) shall be complied with in the execu-
anownw—tom,of this work whether specified herein or not.
South Windsor, Conn., . VJW................JU................. 1939..
Signhere..... ...... .. ....... ..A. .......................... .................
Address .. .. .... .... .... ......rtrord
Location? . ........... r.......... .......................................side of? ...............
Nearestcross street? ........ .......... .............................................2t..................Street No. ...............................__.....-...... Lot No._.210.................. .
dflOwnerof is ..! 'Addres ..... . ram....
Ownerof building is? .Of........ ..........01.................V.1..................Address ... .......R.i..... ...............s..*..............._.............. .......................
ass
Architectis? .. ... ll...
A.. .......................Address ...................................................................................................................
Builder is? .r a... .o...........................Address r ... l ...H
Dimensions of building? ..'Feet front?' Feet rear? !...... .......... Feet deep? .... . ..... ..
Extreme height to highest point of roof? ...... No. of stories in height? .............. .
Purposeof building is? ....... ' .:.. .......................................No. of stores? ...... .... .. ..........................................................................
Howmany families? ................................._.,.................................................No. of rooms? .... .. .............0........................................................................
Distance from street line is? . ............. .........................................from building line is? .......!0.................................................................
ADDITIONS AND ALTERATIONS
Give Brief Description)
MapNo. .............. ........
If of steel frame, what is exterior construction? ....... ...... . ........ ....................... . .. .............................................................................
What kind of columns used? ...............................................................Size of columns used? . ... .............. ..........
What length of columns used? .......... .. ............. ...... ..... I........How protected? . . .............. ............................................. ............. ...
What kind of beams or girders? ...................... .............................Size of beams or girders? .................... ...................................................
Longest span of beams or girders? ...................................... These rest on? . ............. .......................................................................
Roofconstruction is? ......................................................................................Roof covering is? .... . .... ....4...............................................................
The floors are of .................. ...................... ............ construction and are calculated to carry a safe load of...... ........................
lbs. per square foot.
See Section 14, Building By-Laws.)
BRICK CONSTRUCTION.
Ofwhat material will walls be constructed? .. ........ ......... ..................... ............................................................................................... .................
Compositionof mortar? . .......................................................................................................................................................................................................................
Height and Thickness of Walls
Height Stories Front Walls Side Walls Rear Walls Partition Walla
Basement,
I...................................................
1st Story
2nd
I...........................................-1............................................ ......................................................................................................
3rd
4th
5th id
6th
7th "
I..............................................................................................................................................................................................
Sth it
T.........................................................................................................................................................
9th do
loth.................; .....................
I. ........... I.. ........................I.............................................. .................................................... ...................................................
J
Material.of Front? ...................... ......... .. ........ ............................If stone, what kind?
Thickness of Ashlar? Thickness of Backing? .. ... ....... .. ......... ........ ........................
Backed up with what?Arches or lintels over openings?
WOOD CONSTRUCTION.
Give Size,, Longest Span and Distance Between Centres, of Joists, Girders and Columns
JOISTS GIRDERS COLUMNS
k'. Floors Size Longest Span Centres Bridging Size Lopgest Span Centres Size Length Centres
1st
1.
F1 121 U10 8" P
r ............................................................................................. . .. .........................................................
I.............3
S
01
S j
2nd 120
3rd
Size of outside studs? "isP. ..................... Distance on centres? ...................UP, Size of sill? 2j* :-q*....2X6
Size of rafters? ...... 24.0.. ..... . Distance on centres?......... .-W.............. Size of plate? .2.--"--201*....................
Size of ledgers or girts? .. .................... .... .........................................Size of deck rafters? ............ ... .................................I ...............
Distance on centres? ............. ..................... ....... .........................................Size of studs in bearing partitions? ......... .....................................
MISCELLANEOUS
Style of roof, flat, pitch, Mansard, or hipped? Fireplaces? ............. .................................
4Materialofroof'covering? . .. Material of Cornice? ...
How is building heated? OU................Lining of flues? . . . . ........ ............... ................. .... . . I............
Thickness of shell of flues? ....... ...... ............................... ........... .....Any elevators or lifts?
What kind? . ............... ......... How many? Any hoistways? .. .... ... . .. ..
How protected? .. ........ ...................................................... ...............Total Value of Building 33-j,0W .... .................................
Whenwill work be commenced?
The applicant warrants that the lot for residential purposes, shown on a plot plan accompanying this appli-
cation, has 20,000 square feet, or more, and at least 100 foot frontage on a Town road shown on a map of
South Windsor showing Town Roads dated December 1949, or on any other roads officially accepted by the
Town of South Windsor since 1949.
Ayplicant
k:_A
2762
BUILDING APPLICATION
ApplicationNo. ..3.02.2.......................................................
North
onthe .................. .... .......... ........ ........... . ............ side of
Benedict Drive
Street.
Street No, 259 Lot #210
Owner . Avary-heights. C.o.,......
SameApplicant
CLASSIFICATION
Dwelling 261.xil,-.0-1...... ..... ... .. ...................
Permit issued on above Application.
Date, May.2. 01........... 19...
TOWN OF SOUTH WINDSOR
BUILDING PERMIT
Date May 2 0 1959
Fee Paid $52.00 'L Est. Value $ 13 s,000
Permit N0 2762
on the North side of
Benedict Drive Street
Street No. 59 hot #210
Owner Avery Heights Co,
Applicant S"P
CERTIFICATE OF OCCUPANCY ISSUED:
Date
No. 1721
Fee Paid $ 54 00 4
CLASSIFICATION
Dwe lling 26'X401
BUILDING PERMIT
N® 2762
OFFICE OF
THE BUILDING INSPECTOR
of the
Town of South Windsor, Conn.
South Windsor, Conn. 1jay 20V 19 59
94is to to Tertif1j, That Avery Height.® Co.
is hereby granted permission to 1, -26 O X401
at estimated value of
on the
Fart,
side of Benedict Drive Lot214 Street on land
owned by Avery Heights Co„
Said Fork to be as described in Application
No. 3022 — and to conform to specifications and plans filed with said Application, and Building By-
Laws of THE TOWN OF SOUTH WINDSOR.
Issued Ifty 24 j
B"ut g ns ector.
Streets and sidewalks, obstructed by excavations or building materials, must be guarded by barriers
during the day and by both barriers and colored lights by night.
SECTION 1343, GENERAL STATUTES OF CONNECT IC UT: "When any person shall place
or keep building materials, or any obstacle in any highway (or any sidewalk) either with or without a
license therefor from the city or borough in which such highway may be situated, he shall pay said city,
town or borough all costs and damages which it shall sustain, or be compelled to reason therefor."
Permit No.TOWN OF SOUTH WINDSOR
SOUTH WINDSOR, CONN.
Permit N?1721
Certificate of Occupancy
THIS IS PTO CERTIFY that the s
at No. Alp, t' -[(•. '' in the Town of South Windsor, Connecticut,
has been erected and completed in accordance with the Building Code and Zoning Regulations of
the Town of South Windsor, and is hereby approved for occupancy i,
000 "0.."1
G UII NC,. PRCTOR
OWNERj tUILDER
f
Fee Paid .Date 19