Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
250 Abbe Road (10)
FOR OFFICE USE ONLY APPLICATION FOR HVAC PERMIT DATE: NO. TOWN OF SOUTH WINDSOR EST.COST: BLDG. FERMIT NO. U 1 1540 SULLIVAN AVENUE FEE —__ SOUTH WINDSOR, CT 06074 FEES: 644-2511 - Ext. 230 0 - $1,000 - $10.00 1000 or fraction LOCATION OF BUILDING thereof - $10.00 t e 7/&VV OWNER ADDRESS TOWN PHONE N0. HVAC CONTRACTOR ADDRESS TOWN PHONE NO. TYPE OF SYSTEM: HEATING TYPE OF BUILDING: RESIDENTIAL A/C COMMERCIAL VENTILATION BUSINESS INDUSTRIAL IF HEATING: STEAM LOW PRESSURE LIMIT LBS. HIGH PRESSURE LIMIT LBS. HYDRONIC_ , WARM AIR UNIT RADIANT HEATER (INCLUDING WOOD COAL BURNING STOVE) TYPE OF FUEL: OIL-GPM / 3 GAS IN-PUT ELECTRIC KW WOOD COAL OIL TANK - SIZE 6 LOCATION: INSIDE OUTSIDE CAPACITY c'76 LPG TANK - CAPACITY yEXISTINGRADIATION ,e o ADDITIONAL RADIATION iJ Y TOTAL RADIATION DESIGN TEMP. OUTSIDE OF INSIDE OF DIFFERENCE F TOTAL HEAT LOSS (BTUH) HEAT LOSS SHEET MUST ACCOMPANY APPLICATION) DES BE HEATING EQUIPMENT (INCLUDING MAKE & MODEL NO.): GROSS HEATING CAPACI (INPUT-BTUH) Chi OM - NET RATING (OUTPUT-BTUH) IF AIR CONDITIONING: DESIGN TEMP. OUTSIDE OF INSIDE OF DIFFERENCE OF TOTAL HEAT GAIN (BTUR) HEAT GAIN SHEET MUST ACCOMPANY APPLICATION) DESCRIBE ALL COOLING EQUIPMENT (INCLUDING MAKE 6 MODEL NO.): TONNAGE COOLING CAPACITY (BTUH) IF VENTILATION: DESCRIBE ALL AIR-HANDLING EQUIPMENT (INCLUDING KITCHEN EXHAUSE EQUIPMENT) : TOTAL SIZE OF SYSTEM (CFM) FRESH AIR INTAKE (CFM) PLAN MUST ACCOMPANY APPLICATION) The undersigned hereby applies for a permit to perform the following work and is to comply with all local ordinances and St4te of Conn. Building Codes in the performance of such w rk. FURTHER DESCRIPTION OF WORK:1 7`G l Ol C"_0 l ka_k__7 h(4g %1.:a k"ok 0 j -, t-L-74,,I f - STATE LICENSE -- NAME S TYPE $ DA SIGNATURE OF APPL CANT APPROVED E BD 4A 11/88 I - B - R CALCULATION SHEET 1503 (Mod rn Method)Copyright 1971 by The Hydronka institute OWNER ADDRESS DESIGN TEMPERATURE DIFFERENCE F. DATE COL. A COL.B COL.C COL.D COL.E COL. F COL.G 1 ROOM WOHLWHL M /L W N ,L Design Water Temp. J W H L W Desi 2 ROOM DIMENSIONS,FT.U 2- L STUN per FOOT of 3 LENGTH EXPOSED WALLS,FT.Radiation Selected WINDOW AND OUTSIDE DOOR AREA IL y kjgu), (4.5 01 STUN STUN STUN STUN STUN 5 WALL CONSTRUCTION ROOM LIN. FT.OF Table 9,Line 3 a HI TOTALS RADIATION 6 TYPE OF GLASS FROM LINE 12 SELECTED Bottom of table used for Line 51 7 CEILING CONSTRUCTION C ITable 9. L a W)J--) g FLOOR CONSTRUCTIONS ITable 9, L a W or Lin. F t 1 kCYO E 9 COLD PARTITION CONSTRUCTION F Table 9, L a HI G 10 -C 1 Well(With OPenlrpel a 2 Wells(With Openings) X 1 3 Wa1LslW.th Openings) or Ent.Hall L 11 TOTAL BTUH AT 70F TEMP DIFFERENCE' 1] TOTAL BTUH 4T DESIGN TEMP DIFFERENCE L 4 i j(.. l-,K COL.A _ -_ COLS COL.H COL.1 COL_J COL. K COL.L TOTAL BTUH TOTAL OF BUILDING RADIATION1ROOM11ATSELECTED O H L W THL W H L W H L W H L W DESIGN TEMP.* 2 ROOM DIMENSIONS.FT t' IERENCE U 3 LENGTH EXPOSED WALLS, FT. d WINDOW AND OUTSIDE DOOR AREA u STUN STUN STUN BTUH BTUH 5 WALL CONSTRUCTION INCREASE BATHROOM ITable 9, Llne 3 a HI TOTAL 20% S TYPE OF GLASS Bottom of table used for Line 51 7 CEILING CONSTRUCTION tFOR CONCRETE FLOOR ON I GROUND OR FILL AT Table P. L a WI GRADE LEVEL,USE LINEAR S FLOOR CONSTRUCTIONS FEET OF EXPOSED EDGE Table 9,L a W or Lin Ft 1 9 COLD PARTITION CONSTRUCTION ITablo 9,L a HI 10 c T Well(With Openings)0 0 2 Walls(With OPeningU G Xe-j3WNIs{With Openings) or Ent.Hall II TOTAL BTUH AT 70F TEMP DIFFERENCE' 12 TOTAL BTUH AT DESIGN TEMP DIFFERENCE FORM 1503This10imIsavailablefromTMMydrdnlceInnrtuN36RussoPiece.Dark slay Heights,N J 01922 HEAT LOSS CALCULATION O PAGE : 3 DESIGN TEMP DIFFERENCE: 80 BASEBOARD RATING: 580 1 DANIEL--FREEMAN - SUMMARY DANIEL FREEMAN 250 ABBE RD SOUTK W I ND SOR..C T s ROOM- TOTALS i ROOM # AND NAME------------ BTUH @ 70 BTUH @ DTD BASEBOARD 01 MASTER BED 0n* — -- - 4084. 22 4656. 01 BE;? Z 2062. 08 •----- -- - - 3490. 77- 6 1 03 BED 3 3021. 20 3444. 17 6 04 BED 4 3950. 24 4503. 27 8 71OS'itat.__QBATH— 1943. 42 2215. 5 4 TOTALS -FOR-BUILDiLNO- 16061. 16- 10309. 72 32- qo TUTAL FUTURE 8A5EBUARU-';-2Y0"5: y/r 0 PENOTES BTUH INCREASED 20 PERCENT ) MINIMUM BTUH BOILER REQUIREMENT WITH TANKLESS COIL ------ 22, 887. 15 i DETA LED;ME 'HQQ AI!t.':I BR .PUBi.i CAT I ON NUMBERii-2 i * I R y zr b ilkilium 41 wav- t 194ad- K l 1994 GUILS"" ©Win ERA RTMEN T WEST HARTFORD PROBATE TEL :-Apr 08 ,94 11 :30 No .004 P_02 JohhCollins BullBuildinging inspector Town of South Windsor APR 1 1 1994 South Windsor April 8, 1994 BUILDING DEPARTMENT Re: Heating ApplinAtinn for 250 Abbe Rd Dear Mr, Collins, Asp par our oonvorsation by telephone on 4/7/94, 1 am sending you this letter aneuring you that we, Daniel & Deborali Freumau, will be replacing our furnace shortly. Thank you for your time CU«3 cunsiderati,on. Your assistance was greatly apprdciated. ery truly yours, VL'f iLr ._-- ---- . Deborah M. Freeman 250 Abba Rd South- Windsor, Ct. 06074