Loading...
HomeMy WebLinkAbout25 Blue Ridge Drive (13)NO• t Ems, arT: 7 gBLDC• i T 1540 SU A + SOUTR Wl"$01o ,CT 0074 FEES: 6 2511 - Ext. 230 0 $19000 - $10.00 1000 or fraction LOCATION OF BUILD thereof - $10.00h1G L IC..lel I t • H . Lr'v.*A10S64 6"90 OWNER ADDRESS TOWN PHONE NO. 4O 76"&*40 G-4aq- 5M--3/ HVAC CONTRACTOR ADDRESS TOWN PHONE NO. TYPE OF SYSTEM: HEATING TYPE OF BUILDING: RESIDENTIAL A/C COMMERCIAL VENTILATION BUSINESS INDUSTRIAL IF HEATING: STEAM OW PRESSURE LIMIT LBS. HIGH PRESSURE LIMIT LBS. HYDRONIC WARM AIR UNIT RADIANT HEATER (INCLUDING WOOD COAL BURNING STOVE) TYPE OF FUEL: OIL-GPM ,/O GAS IN-PUT ELECTRIC KW WOOD COAL / OIL TANK - SIZE & LOCATION INSIDE OUTSIDE CAPACITY 6.9 7d' LPG TANK - CAPACITY D fj-J Iv IONAL RADIATION 35-0b TOTAL RADIATION 1 T., DESIGN TEMP. OUTSID OF INSIDE OF DIFFERENCE OF TOTAL HEAT LOSS (BTUH) 461_1 11 HEAT LOSS SHEET MUST, ACCOMPANY APPLLCATION) DESCRIBE ALL HEATING EQUIPMENT (INCLUDING MAKE & MODEL NO.): OL A4CI*A) Mo 7t f-W 60- L{OJT Er/r L*r -ro S7je&c We-. GROSS HEATING CAPACITY (INPUT-BTUH) NET RATING (OUTPUT-BTUH) IF AIR CONDITIONING: DESIGN TEMP. OUTSIDE OF INSIDE F DIFFERENCE OF TOTAL HEAT GAIN (BTUH) HEAT GAIN SHEET MUST ACCOMPANY APPLICATION) DESCRIBE ALL COOLING EQUIPMENT (INCLUDING MAKE & MODEL NO.): TONNAGE COOLING CAPACITY (BTUH) IF VENTILATION: DESCRIBE ALL AIR-HANDLING EQUIPMENT (INCLUDING KITCHEN EXEIAUSE EQUIPMENT): TOTAL SIZE OF SYSTEM (CFM) FRESH AIR INTAKE (CFM) PLAN MUST ACCOMPANY APPLICATION) The undersigned hereby applies for a permit to perform the following work and is to comply with all local ordinances and State of Conn. Building Codes in the performance of such work. FURTHER DESCRIPTION OF WORK: rioto NO J.( STATE LICENSE - NAME b TYPE #1 bATE SIGNATUV OF APPLICANT S3 0 OVED DATE I = 8 = R CALCULATION SHEET 1503 (Modern Method)Copyright 1971 by The Hydr nits institute AGGRESS DESIGN TEMPERATURE DIFFERENCE F. DATE OWNER COL.A COL.B COL.C COL.D COL.E COL.f COL.G 1 ROOM---- S Design Water Tamp. O H L W H L W H L W H L W H L W BTUH per foot Of 2 ROOM DIMENSIONS, FT.U Radiation Selected 3 LENGTH EXPOSED WALLS,FT. 44 WINDOW AND OUTSIDE DOOR AREA IL BTUH BTUH BTUH STUH STUN ROOM LIN. FT.OF 9 WALL CONSTRUCTION TOTALS RADIATION Tabie 9, Line 3 x H) FROM LINE 12 SELECTED 6 TYPE OF GLASS Bottom f table used for Line sl C 7 CEILING CONSTRUCTION f Table 9.L it WI B FLOOR CONSTRUCTIONI E ITable 9,L x W r Lin. F t)f 9 COLD PARTITION CONSTRUCTION G Table 9, L x H) 10 C 1 Wall IW Ith Openinga) H c+ 2 wait*(With Openingal p-i 1 J 3 Wells IWrlh Openings) or Ent.Hall H J 11 TOTAL BTUH AT 70F TEMP DIFFERENCE' K 12 TOTAL BTUH AT DESIGN TEMP DIFFERENCE L COL.A COL.ill COL.H COL.1 COL`J - - COL. K COL.L TOTAL BTUH TOTAL Of BUILDING RADIATION AT SELECTED 1 ROOM L W H L W H L W H L W H L W DESIGN TEMP. HO DIFFERENCE 2 ROOM DIMENSIONS. FT U 3 LENGTH EXPOSED WALLS, FT LL 4 WINDOW AND OUTSIDE DOOR AREA TUN BTUH BTUH BTUH BTUH INCREASE BATHROOM 5 WALL CONSTRUCTION TOTAL 20% Table 9,Line 3 x HI 8 TYPE OF GLASS GROUNOOR FILL ATBottom (table uNd for Line 51 t CONCRETE FLOOR ON GR 7 CEILING CONSTRUCTION GRADE LEVEL,USE LINEAR Table 9. L is W) FEET OF EXPOSED EDGE B FLOOR CONSTRUCTIONt I Table 9.L x W Or L In Ft 1 9 -E—OLD PARTITION CONSTRUCTION I Table 9. L x H) 10 c 1 Wall(With Openings) 0 eX2Wells(With Openings) J - 3 Wells(With Openings) r Ent Hall 1- 11 TOTAL BTUH AT 7OF TEMP DIFFERENCE' 12 TOTAL BTUH AT DESIGN TEMP DIFFERENCE FORM 1503 This form Is available from The Hydronlcs Institute 35 Russo Place,Berkeley Heights,N J 07922 oz-oz-uo 60601903. 15 SUMMARY REPORT Prepared For: Prepared Bv: Dr. Michael Martin D. J. Symolon25BlueridgeDriveKasdenFuel CompanvSouthWindsor , CT 06074 Job Name: Martin DESIGN CONDITIONS for South Windsor- OUTDOOR INDOOR SUMMER WINTER SUMMER WINTERDryBulb9557570WetBulb7562 Daily Range 21 Daily Swing 3. 0Latitude40Elevation700 Safetv Factor (%) 0 Latent Factor (%> 27 Room Sensible Name Heating Heating Cooling CoolingBTUHCFMBTUHCFM First floor Second Floor 25, 336 354 12 090 21 ,383 299 10415 611 526 46,719 653 22,505 1 . 137 HEATING DELTA T 65. 0 COOLING DELTA T 18. 0 NOTE: *** Calculated Airflow is based upon load requirements.Verify that airflow calculated is compatible with selected equipment requirements. *** 6k i 0 903. 15 DETAILED REPORT FOR ENTIRE HOUSE Preoared For: Prepared Bv: Dr . Michael Martin D. J. Symolon 25 Blueridqe Drive Kasden Fuel Company South Wzndsor . Cl 06074 Job Name: Martin EXPOSURE GLASS NORTH 9OUTH EAST WEST NE/NW SE/SW HORZ. TOTAL AREA 1 75 | 125 | 120 | COOLING 1 246 | 1 .830 | 5.800 | 5.568 | 0 | 0 | 0 | 13,444 | HEATING 51| 3 | 2 4565 | ,275 | 4, 104 | 0 | 11 ,457 | BELOW WALLS NORTH SOUTH EAST WEST NE/NW SE/SW GRADE TOTAL AREA 412 | 373 | 694 | 699 | 0 | COOLING ( 661 ,' 59911 1 , 114 | 1 , 122 | H E A T I N 9 541 | 3.566 0 | 11 . 11 '**" | DOOPS NORTH SOUTH EAST WEST NE/NW SE/SW TOTAL AREA 1 21 | 6-11 COOLING | 292 ( 0 | 292 | 292 | 0 | 0 |877 HEATING 9 0 | 929 .1 929 ( FLOOR AREA COOLING HEATING 1 ,733 CEILING AREA COOLING HEATING 2940 2.678 4.565 MISCELLANEOUS COOLING LOADS Peoole Sensible Load 0 Latent Load 6.076 Lights & Aopl . Load 0 Latent Safetv Btuh 0 Ventilation Loao 0 Duct Heat Gain 0 Infiltration Load 2.008 Sensible Safetv Btuh 0 TOTAL SENSIBLE LOAD 2.505 TOTAL LATENT LOAD 6,076 Summer ACH 0. 24 Temp. Swino Mult. 1 . 00 Total Cooling oad 2G,581 BTUH Or 2. 38 Tons *** MISCELLANEOUS HEATlNG LOADS Infiltration Load 15,063 Ventilation Load 0 Duct Heat Loss tuh 0 Winter ACH 0. 50 Total Heating Load 46,719 BTUH ***