Loading...
HomeMy WebLinkAbout230 Burnham Street (5)TOWN OF SOUTH WINDSOR, CONNECTICUT D PLANNING AND ZONING COMMISSION APPLICATION FORM APR 25 1%8 App. No. O p-9 -3-7 P D Cel d: IMPORTANT! South Winds C 1 on Planning and Engineering DepplM iF m"s Co mission e z J/ require 14 days to determine application Re O• completeness. To ensure receipt of a complete application by PZC, it is strongly recommended that the application be submitted 14 days prior to the Regular Meeting at which it will be received. APPLICANT: Albert Beyer ADDRESS: 230 Burnham Street TELEPHONE: 528-6526 OWNER OF RECORD ON LAND RECORDS:— 11eyer Gage Company ADDRESS: 230 Burnham Street COMPLETE LOCATION OF PROPERTY: To the rear of 230 Burnham. Street ZONE: I NAME, ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Christopher 0. Stone P.E. Fuss & O'Neill, Inc. 146 Hartford Road Blanchester,_ T TELEPHONE: C,46-246 THIS APPLICATION IS FOR: (Check one of the following) 1. Zone Change to public hearing required) 2. Subdivision 3. Open Space Subdivision (public hearing required) 4. Resubdivision (public hearing required) 5. Special Exception to Article public hearing required) g 6 . Site Plan of Development 7 . Earth Filling (Section 10 ) and/or Earth Removal (Section 9 ) public hearing required) 8 . General Plan of Development 9 . Regulation Amendment: Zoning Subdivision 10 . Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN TRIPLICATE WITH SIX SETS OF THE MAPS (7 if public hearing is required) AND OTHER DOCUMENTS (see page 2) Applicant n 1/14/87 see reverse side) CHECKLIST 0o ciS 0(— REQUIRED INFORMATION SITE PLANS L " fF E(?-.. This checklist must be signed by plan preparer (P . E. /L. S . ) declaring that all required information is provided . Items 1-7 are required for all applications ; items 8-11 required where appropriate . Check mark for each item supplies . 1 . On each sheet for plans or maps , title block with the following information: a. Name , address and telephone of applicant . b . Name , address and telephone number of Land Surveyor or Professional Engineer . C . Name of Development. d . Date when drawings were made . 2 . Key Map : An overall map drawn to a scale of 1 inch equals 200 feet , which can be used as an overlay on Metropolitan District Maps . This map will show the overall design of the Development and surrounding property within 500 feet . a. Data block which gives needed zoning information such as percentage of lot coverage , acreage of tract , number of apartment units , parking requirements , etc. b . Layout of buildings X_ C. Layout of streets and parking . X d . Lines indicating proposed drainage system with direction arrows . e. Lines indicating sanitary sewer system with direction arrows. f . Names of surrounding property owners . g . Proposed open spaces and recreation areas . h . Driveway cuts on surrounding properties . 3. Architectural Elevations : Plans of the proposed buildings drawn to a scale of 1/8" = 1 ' - 0" showing the elevations of all sides of the proposed buildings in sufficient detail to show architectural styling . Architect ' s seal on elevations for buildings in excess of 5000 square feet ( per CGS Chapter 390) . Page 2 (Site Plans) 4 . Plot Plan : A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: ( 1) 24" X 36" with a 3/4" ruled margin ; ( 2) 18" X 24" with a 1/2" ruled margin , containing the following data: a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map . b . Proposed streets and street lines with center line stations , curve data , and parking spaces . C . Building lines in accordance with zoning regulations. d . Proposed buildings and other structures , including signs , outside lighting , and dumpsters (on concrete pad and screened) bpi e. Easements , noting grantors , grantees , and purpose . X f . Names of abutting property owners . Xg . Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency . In areas accessible to Metropolitan District Commission points , or other coordinated points , the monumented points within proposed site shall be coordinated . These coordinates shall appear in tabular form on the plot plan . The accessibility of these MDC points shall be determined by the Town Engineer . h . All open space or other common or public land uses shall be indicated . i . A-2 certification ; P.E. /L. S . Seal. 5 . Topographic Map : A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches , including ruled margins shall in addition to the requirements of the plot plans show the following : a. All existing and proposed buildings . b . Curb lines and pavement width , sidewalks . C . Existing and proposed sanitary sewers . d . Existing and proposed water and gas main systems . e . Present wooded area indicated by foliage lines . Any individual trees to be saved should be shown . rage l Jl Le r lctl 5 f . Existing and proposed contours shall be shown in not less than two-foot intervals , but in cases of relatively level land , the contours shall be one-foot intervals and spot elevations . X g . Regulated wetlands and 100-year floodplain or note that none are present. h. Proposed storm drainage system, showing all catch basins , endwalls , manholes , lengths and sizes of pipes . (Minimum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches . ) i. Connections of all springs into proposed storm drainage system as needed . w j . Location and indications of existing brook channels , and 100-year flood limits. k . A-2 Certification ; P .E. /L. S , Seal . 1 6 . Landscaping plan . 7 . Drainage calculations - Zero Runoff Increase per attached guidelines . . 8 . Traffic report . 9 . Plans and Profiles: A plan and profile of the proposed st;reet-s drawn on plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches , including ruled margins and containing the following : a . Layout of streets in sections coordinated by stations with the profile . b . Street plan showing roadways and drainage. C . Sight line at driveway & street intersections . d . Profile of roadway showing existing and finished grades . Roadway profile will show all tangent grade and all vertical curve information . e . Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations. Drainage lines will be shown and described as to material . f . Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions . g . Metropolitan District Commission datum shall be used on all sites accessible to these controls . The Town Engineer shall , based on standard engineering practices , • determine the accessibility of these controls. Page 4 (Site Plans ) h. Profiles shall show all sanitary sewer lines and manholes , including elevations , sizes , lengths , and slopes of pipes . Top of foundation elevations for building shall be shown. 10. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces , a plan which contains data for site improvement may be required . This map shall be drawn to a scale of 1 inch equals 40 feet . 11 . Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer . The report shall demonstrate the feasibility of the proposed individual systems; the report should deal with the area as a whole , discussing the following points : a . General nature and development of surrounding area . b . Topography and natural drainage pattern . C . Subsurface conditions as shown by subsurface investigation , including soil absorption characteristics, ground water level conditions, ledge rock, and general nature of soil . d . General description of type of development contemplated. e . Detailed description of proposed sanitary sewage disposal facilities , indicating sizes for various ground conditions, materials to be used , and the general layout pattern to be used , etc . f . Special precautions that may be necessary to provide proper functioning of the proposed disposal systems. g . Map of general area with locations of all tests shown on proposed layout . h. Flood heights of any nearby streams , brooks , or ri v e r s . i . Test results and engineering evaluation per Section 4 . 13 . 5 . All information required above is included in this application at the time of submission . A PLW PRE ARER (P. E . /L.S . ) DATE November , 1987 SANITARY REPORT FOR ALBERT MEYER This proposal is for additional buildings to be built to the rear of the Meyer Gage facility at 230 Burnham Street in South Windsor. The project consists of four 60 by 80 foot buildings connected in a row for a total area of 19,200 square feet. All surrounding properties are industrially zoned and these units will also be for industrial usage. Existing drainage for this site is split with approximately half the drainage flowing toward the railroad right of way to the west and the other half flowing to properties to the east. The proposed project directs runoff toward the west where it will be intercepted by the drainage system in the railroad right of way. There are no streams, brooks or rivers located in the vicinity. There are also no wetlands on site or within 100 feet of the site. Subsurface conditions are indicated in the test pit logs shown on the plan. Soils in the area of the proposed leaching system are well drained sand with groundwater at approximately 10 feet and no ledge visible at a 12 foot depth. The percolation rate for the soil was less than 1 minute per inch. Both test pits and perc test were witnessed by the Town Sanitarian. Using Table 4 from Section IV of the State Technical Standards, a maximum office usage of one employee per 150 square feet generating 20 gallons per employee per day would yield a daily sewage flow of 2560 gallons per day. Although a 100 percent office usage in an industrial facility is unlikely, the system was designed to handle this "worst case" . The leaching system consists of four 72 foot trenches with 2 foot deep leaching galleries. A more detailed description of location, pipe sizes, inverts and effective area computation is located on the plan. The bottom of this system maintains an elevation greater than 18 inches above high seasonal groundwater and, as an area with a rapid perc rate, ,an elevation greater than 10 feet above ledge in accordance with the requirements of the State Health Code. Water needs will be served from the MDC main in Burnham Street, therefore there is no well proposed on the site. In conclusion, the site and soils seem well suited to the system proposed. There should be no detrimental impact involved with the proposed leaching system. 87-339 0406ACOS.2 PREPARED 8Y: DATE' 130 FtJSS&D,NaLL SH.NO. OF '69 Z P YANCNtfTER, C NNECTICUT CHECKED M. DATE'. PRa.No. 5 7_ 33 1 GUTTER FLOW ANALYSIS A LZ EZ-7 7 M TOWN Al Entering Catch Sasin I Al Bypassing Inlet s 0 6ypassing Inlet Width of Flow I i D pth of Flow Iatutter Cross Slope of Shoulder I I Grade of Gutter I JI a0toInlet Rainfall Intensity'- Total Al Sum of A Al Runoff Coefficient Area in Acres Time to Inlet v n 10 n I t Numb r `- a" `n I -q - 1jil PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM Date: ylz Y Mel. Stead, w O: gall Reichle Mike John Shemo Richard J. Sa='b=• Gary 'Tyler, Fire M: Marcia A. Banach, Director of Planning he Planning & Engineeringerin Departments have received plans for the ollowing project: subdivision Site Plan " Residential Com'Qercial Industrial A/- Location: Project Description: q proper involved? YES NO Future Town-owned Pro P a) new streets (_ existing frontage also) fib) new open space/recreation area active passive c) new detention area Planning Department comments: if you will have comments I se let me know by with your department when please this application so that I can follow up do a P Tanning Department report. C r aye S W&U140tC s 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 psot•co AREA CODE 203/644-2511 REGISTERED MAIL May 2, 1988 Town Clerk Town of East Hartford Town Hall 740 Main Street East Hartford, CT 06118 re: P. A. 87-307 Dear Sir/Madam: In accordance with the captioned 1987 legislation concerning notification to municipalities regarding Planning and Zoning Commission applications that could affect the abutting town, we hereby notify you of the application of Albert Meyer for a Site Plan of Development for Meyer Gage Co. , 230 Burnham Street, South Windsor, north side of Burnham St. , west of Long Hill Road. A date has not been established for the Planning and Zoning Commission to review this application. Interested persons are invited to keep apprised of this matter and to comment. If you have any questions, please feel free to contact the Planning Department at 644-2511. Thank you. Very truly yours, Marcia Banach Director of Planning cc: PZC File Planning File SENDER: Complete items 1 and 2 when additional services are desired, and complete Items 3 and 4. Put y ur address in the"RETURN TO" Space on the reverse side. Failure to do this will prevent this card fr m being returned to you. The return receipt fee will provide you the name of the person delivered to and the date f deliver . For additional fees the following services are available.Consult postmast r for fees and check box es)for additional service(s)requested. 1. O Show to whom delivered,date,and addressee's address. 2. O Restricted Delivery t(Extra charge)t t(Extra,charge)t 3. Aitcle Addresse t 4.Article Number J ouch 7Vz o r TyR of Service: G egister+ad Insured Certified COD T v f Express Mail Always obtain signature of addressee or agent and DATE DELIVERED. 5. Signature—Addressee S. Addressee's Address(ONL Y if x requested and fee paid) 6. Signature x 9 7. Date of Delivery PS F rm 3811, Mar.1987 11S.MR0.1887-176.268 DOMESTIC RETURN RECEIPT p. fir_+e'-w'---.-._. .+.w+...s.1r ._._..a...+nt - _-w._ .al..Yr._.-w.«..r._.y wl yy..r-.-. • SENDER: Complete Items 1 and 2 when additional services are desired, and complete Items 3 and 4. Put your address in the"RETURN TO" Space on the reverse side. Failure to do this will prevent this card fr m being returned to you. The return receipt fee will provide you the name of the person delivered to end the dote f dellyM. For additional fees the following services are available.Consult postmasw..jor fees and check box a for additional services)requested. 1. O Sh w..Lyrhom delivered,data,and addressee's address. 2. O Restricted Delivery t(Extra charge)t t(Extra charge)t 3. Article Addressed to: N 4. A le umber rd rRes.tered rvice: Insured MG 1 S Certified COD Express Mail z r Always obtain signature of addressee or agent and DATE DELIVERED. 5. Signature—Addressee 8. Addressee's Address(ONLY if x requested and fee paid) 6. Signature—Agent x 7. Date of Delivery PS F rm 3811, Mar.1987 U.S.G.P.O.1e87-178-268 DOMESTIC RETURN RECEIPT 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 psoR.co AREA CODE 203/644-2511 M E M O R A N D U M JUNE 13, 1988 TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works SUBJECT: Engineering Review Meyer Warehouse Attached please find the engineering review comments from SEA. Additionally, the following comments are noteworthy: 1. Access to the proposed buildings as shown is questionable. Location and grades should be rechecked. 2. Pavement widths and radius should be indicated for both the Proposed and existing driveway area. MJG/jsv cc: Project File PZC File SE A C nsultants Inc. Engin ers/Archit cts Principals Arnold B.Goldstein,RE. June 10, 1988 Frederick G.Aufiero,P.E. Robert M.Brandon,A.I.A. Stephen H.Geribo,P.E. David T.Goodemote,P.E. Bruce E.Soule,P.E. Kenneth M.Stewart,P.E. Mr. Michael J. Gantick, P.E. Anthony J.Zuena,PE. Director of Public Works Associates Town of South Windsor Steven L.Bernstein,P.E. 1540 Sullivan Avenue Paul F.Gabriel,PE.South Windsor, Connecticut 06074 Mark Gould,P.E. Michael S.Schultz,P.E. Arthur A.Spruch,P.E. Re: Meyer Warehouse Job No. 88126.29 Paul C.Ross,RE. Task Order No. 29 Dear Mr. Gantick: As requested, S E A Consultants Inc. has reviewed the following for the above referenced project: Sheet No. Title Prepared By Date 1 of 2 Site Plan Fuss & O'Neill April, 1988 2 of 2 Details It A-1 Floor Plan & Elev. Frazier, Lamson & Budlong 11 Sanitary Report Fuss & O'Neill April, 1988 This information was reviewed for compliance with the Town of South Windsor Subdivision and Zoning Regulations dated July 24, 1972 and standard engineering proctice. We note the following: Section 4.13.2.1 KEY MAP a. The data block has not been provided on the Key Map; however, it has been included on the Site Plan. d. Directional arrows have been shown, but have not been labeled. Section 4.13.2.3 PLOT PLAN 850 Silas Deane Highway Wethersfield,CT 06109-3412 203)721-7993 g. Monuments should be coordinated and listed in tabular 485 Massachusetts Avenue form. Cambridge,MA 02139-4018 617)497-7800 Section CONSERVATION PLAN Citicorp Park West 100 Fod n Road Soil types and boundaries should be delineated on the plan. South Portland,ME 04106-2319 207)775-2281 r Lim S E A Consultants Inc. Engin ers/Archit cts Mr. Michael J. Gantiek, P.E. June 10, 1988 Page Two GENERAL COMMENTS 1. A detail of the proposed precast drywell should be included,,-ba sad ov. soils, dzRr IV(fix 2. A handicap access ramp should be included on the plan. 3. A cross section detail for the proposed concrete sidewalk should be provided. 4. Based upon review of Chart 32 of the Soil Survey of Hartford County, much of the parcel is located within Ninigret fine sandy loam (NnA). The two test pits performed indicate the presence of this soil. 5. Four paved leak-off areas are proposed for the site. It is recommended that catch basins replace the leak-offs and be directed into the existing drainage system in Burnham Street. 6. A hydrological analysis indicating pre- and post- development discharge conditions has not been provided and is therefore not part of this review. If you have any questions, please do not hesitate to call me. Very truly yours, S E A CONSULTANTS INC. 6)a'mes R. Bancroft, P.E. JRB:mp D%V N s t, r Oles 0&uaotCV 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 R•co, AREA CODE 203/644-2511 June 14, 1988 Christopher 0. Stone, P.E. Fuss & O'Neill, Inc. 146 Hartford Road Manchester, CT 06074 Re: Application #88-037, Meyer Gage Company Site Plan Dear Chris: Attached is a copy of comments from the Planning and Engineering Departments regarding the above-referenced application. Please make the necessary revisions to the plans and submit 6 complete sets (including architectural elevations, landscaping plans, etc. ) to the Planning Department. If you have any questions regarding the comments or the procedure, please contact me. Very truly yours, Marcia A. Banach Director of Planning cc: Town Engineer MEYER GAGE - PLANNING DEPT. REVIEW COMMENTS KEY MAP Show curb cuts on surrounding properties PLOT PLAN/TOPOGRAPHIC MAP Where are the existing septic systems? How do vehicles access the overhead doors? Square footage of proposed buildings? Parkin formula does not take into account an officegY use? Is the existing building on the west side of the lot served by public water? What is the building coverage on the lot? Landscaping as shown is very inadequate. If the pavement really ends at a right angle with Burnham Street, how about some turning radii r"13 FVSS8c MBLL June 20, 1988 consulting engineers JUN 21 1988 Marcia Banach South Windsor Town of South Windsor 1540 Sullivan Ave Planning & toning Commission South Windsor, CT 06074 RE: Meyer Gage Application Dear Marcia: As agent for Al Meyer in the matter of the above referenced application, I am writing to you in response to your request for an extension of the sixty-five day time period allowed for consideration of this application. It is my understanding this time period expires on June 30 and that the Town will not be able to act on that application before that deadline. We therefore grant the extension requested in the hopes that this will allow a more thorough review of this application and lead to a more expedient approval. If you require any further information, please do not hesitate to call. Yours truly, Christopher 0. Stone, PE Pg cc: Al Meyer Lawrence Frazier 87-339 Corres. 0620ACOS.3 146 HARTFORD ROAD / MANCHESTER, CONN. 06040 / TEL. (203) 646-2469, FAX. EXT. 307 SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING HIGHWAYS and BRIDGES•SURVEYING•LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC• PUBLIC WORKS MANAGEMENT 9 HYDROGEOLOGY SE A C nsultents Inc. Engineers/Architects July 19, 1988 Principals Arnold B.Goldst in,P.E. Frederick G.Aufiero,RE. Mr. Michael J. Gantick P.E.Robert M.Brandon,A.I.A. I Stephen H.Genbo,P.E. Director of Public Works David T.Good mote,P.E. Town of South Windsor Bruce E.Soule,P.E. 1540 Sullivan AvenueKennethM.Stewart,P.E. Anthony J.Zuena,P.E. South Windsor, Connecticut 06074 Associates Steven L.Bernstein,PE. Re: Meyer Warehouse Paul F.Gabri 1,PE. Job No. 88126.37 Mark Gould,P.E. Task Order No. 37MichaelS.Schultz,P.E. Arthur A.Spruch,P.E. Dear Mr. Gantick: Paul C.Ross,P.E. As requested, S E A Consultants Inc. has reviewed the following for the above referenced project: Sheet No. Title Prepared By Date 1 of 2 Site Plan Fuss & O'Neill April, 1988 2 of 2 Details It April, 1988 This information was reviewed for compliance with S E A's comments dated June 10, 1988, Planning Department's comments, and your comments dated June 13, 1988. We note the following: GENERAL COMMENTS 1. The engineer has indicated that hydrological computations for pre- and post-development conditions were submitted. However, the only computations that we have received for review have been a gutter flow analysis. "6 P1-VVLdXW 2. Pavement radius for the existing driveway entrance at Burnham Street should be indicated on the plans. 3. #4 cce-aa 94e*h^ --e tj s- Q) If you have any questions, please do not hesitate to call me. Very truly yours, S E A Consultants Inc. 850 Silas Deane Highway Wethersfield,CT 06109-3412 203)721-7993 485 Massachusetts Avenue James R. Bancroft, P.E. Cambridg ,MA 02139-4018 617)497-7800 JR B:m p Citicorp Park West 100 Foden Road South Portland,ME 04106-2319 207)775-2281 032J10 FUSSUMBLL consulting engineers July 22, 1988 Marcia Banach Town of South Windsor Planning Department 1540 Sullivan Avenue South Windsor, CT 06074 RE: Meyer Gage Application Dear Marcia: As agent for the applicant, I hereby request with this letter, a 65 day extension for the consideration for the above-referenced application. I appreciate your consideration in this matter. If you have any questions, please do not hesitate to contact me. Very truly yours, Christopher O. Stone, PE PJ g 87-339 Corres. 0722A88COS1 JUL 2.5 1988 South Windsor Planning & Zoning Commission 146 HARTFORD ROAD / MANCHESTER, CONN. 06040 / TEL. (203) 646-2469, FAX. EXT. 307 SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING HIGHWAYS and BRIDGES•SURVEYING•LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC• PUBLIC WORKS MANAGEMENT•HYDROGEOLOGY ra FUSS&ONEILL'` PREPARED DATE CHECKED DATE PROJECT NO. consulting engineers BY BY 7-3 J 1 SHEET NO. ITI C>,j of i+a- Tr rapo Q j_(.f___ Yam_'`"•S _ i j _i . i't v t.aJ r _ le 1 __!^A'r I V i i. l_ j^ _- s-__, k y -$ r- - 11 .LJp I j-/y/-/-+- /I]( , u(. E y i i_ _ -} _^__. _I J -y -.iIJrL '- I F..~ _ .[.- Y.IC__,(4.L = _._p,. ». «_„-. y ..... t E do 0)p: C_r4 r South Winds-or Piawn & Zanin COMMIS on r T E 3 S ii t MM gf,t h F' V/ Saa O s 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 R•CO AREA CODE 203/644-2511 October 3, 1988 M E M O R A N D U M TO:Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works RE:Engineering Review Meyer Warehouse Please find attached the SEA review comments for the subject application. Construction schedule to be revised. 6-,s 4^ cLa-' r 2. , There appears to be a conflict in the MDC datum and plans O"k ek 5. 35 feet. t 3. The site plan should show dimensions on buildings and off- set from property line. t, 4 . Septic system will require Town Sanitarian review. All 1111(1;t.4 4-t 5- MJG/jsv cc: Project File 1L y, r- -a (I 1 LAW- S E A Consultants Inc. Engineers/Architects Principals September 26, 1988 Arnold B.Goldstein,P.E. Fred rick G.Aufiero,P.E. Mr. Michael J. Gantick, P.E. Robert M.Brandon,A.I.A. Director of Public Works Stephen H.Geribo,P.E. Town of South WindsorDavidT.Goodemote,P.E. Bruc E.soul ,P.E. 1540 Sullivan Avenue Kenneth M.Stewart,P.E. South Windsor t CT 06074 Anthony J.Zuena,P.E. A moclates Re: Meyer Warehouse Steven t-.Bernstein,P.E.Job No. 88126.43 Paul F.Gabriel,P.E. Task Order No. 43 Mark Gould,P.E. Joseph A.Murphy,P.E. Dear Mr. Gantick: Michael S.Schultz,P.E. Paul C..Showstead,P.E. Arthur A.spruat,P.E.AS requested S E A Consultants Inc. has reviewed the following for the above referenced project: Paul C.Ross,P.E. Sheet No. Title Prepared By Date 1' 1 of 2 Site Plan Fuss & O'Neill April, 1988 r 2 of 2 Details It This information was reviewed for -compliance with the Town of South Windsor Subdivision and Zoning Regulations dated July 24, 1972 and standard engineering practice. We note the following: Section 4.13 .2. 1 ARCHITECTURAL ELEVATIONS Architectural elevations and plans of the proposed buildings have not been submitted and are, therefore, not s Part of this review. GENERAL COMMENTS The reserve area for the proposed on-site septic system has been located in the retention basin. The location of either the basin or reserve area should be revised to eliminate this conflict. 1) X 2 . An emergency spillway should be provided in the retention basin to direct run-off toward an acceptable location. If necessary,a direct outlet should be provided. Dr,,4, )C3 . Pavement radius for the existing driveway entrance at Burnham Street should be indicated on the plans. 850 Silas Deane Highway Wethersfield,CT 06109-3412 203)721-7993 485 Massachusetts Avenue Cambridge.MA 02139-4018 617)497-7800 1537 Main Street Springfield,MA 01103-1420 413)731-9662 Citicorp Park West 100 Foden Road South Portland,ME 04106-2319 207)775-2281 00 SEA Consultants Inc. Mr. Michael J. Gant ick, P.E. Engineers/Architects September 26, 1988 b0 Page Two O eal C C^( X 4. The area indicated on the plans for the propoosed be buildings, based on scaled dimensions, appears incorrect. sR5. A cross section of the retention basin slpuld be included. you have any questions, please do not hesitate to call me. Very truly yours, 1 S onsult t Inc. John T. Holland sd S wN SE,< 1 o 7_0 074e si d&u&0tCVi 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 0e•C13 AREA CODE 203/644-2511 October 8, 1988 OCT 12 1988 Christopher 0. Stone, P.E. FUSS & OWEILL, INC. Fuss & O'Neill, Inc. 146 Hartford Road Manchester, CT 06040 Re: Application #88-37, Meyer Gage Company Site Plan Dear Chris: Attached is a copy of comments from the Planning and Engineering Departments regarding the above-referenced application. Please make the necessary revisions to the plans and submit 6 complete sets (including architectural elevations, landscaping plans, etc . ) to the Planning Department. If you have any questions regarding the comments or the procedure, please contact me. Very truly yours, Marcia A. Banach 1 Director of Planning I cc: Town Engineer 4 . 1 f , a• 1 ll n'• l ,.,Z j kh.' 4 y- p fra.`(« ,,.},a.« `.+ +'a..,.i /+ MEYER GAGE - PLANNING DEPT. REVIEW COMMENTS, REVISED PLANS Rey Map show driveway cuts on surrounding properties Plot Plan no office use intended? (parking formula)N'W turning radius at Burnham St. looks small for trucks Y. - parking looks insufficient for new units LZper unit) NOTE; Since Planning and Engineering Comments letter dated June 14, 1988, required submission of 6 complete sets of revised plans, including architectural elevations, we simply replace old plans with new. Architectural elevations were not included with revised plans . Therefore, new architectural elevations are required. pow s f4 o 4 e wL)1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 OR-CO AREA CODE 203/644-2511 3 November 1988 Mr. Albert Meyer 230 Burnham Street East Hartford, CT 06108 re: Appl. #88-37P, Meyer Gage Site Plan Gentlemen: We are pleased to *advise that the Planning and Zoning Commission voted at its November 1, 1988 meeting to approve the captioned application for a Site Plan of Development in accordance with Drawings 1 and 2 of 2 dated April 1988, revised through 10-31-88, prepared by Fuss and O'Neill, Project No. 87-339A and with the following modifications: 1 . Prior to commencement of any site work, a meeting must be held with Town Staff. 2 . No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. 3 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13.10 of the Zoning Regulations . 5 . A landscape bond in the amount of $5000 is required and must be submitted prior to filing of mylars . 6 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7 . Approval of the Town Sanitarian is required prior to issuance of a building permit. 8 . Radius for entrance must be increased to 251 ; additional reserve parking area is required. 0,096 af,( Ca C t-ScU y 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONS!. 06074 SOR•Co AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, Nov. 5, 1988 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At its Nov. 11 1988 meeting, the Planning and Zoning Commission voted to take the following action: 1 . Approve, with modifications, Appl. #88-37P, Albert Meyer, Meyer Gage Company, for a Site Plan of Development for property at 230 (north side) Burnham Street, I Zone. Dated at South Windsor, Connecticut this 2nd day of November, 1988 . PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. , Chairman Marshall Montana, Secretary 0,41N O apU 1540 SULLIVAN AVENUE ° SOUTH WINDSOR, CONN. 06074 SOB-co AREA CODE 203/644-2511 March 23, 1989 Albert Meyer 230 Burnham Stsreet South Windsor, CT 06074 RE: Application #88-37P, Meyer-Gage Dear Mr. Meyer: At the March 20, 1989 meeting, the Inland Wetlands Agency/Conservation Commission approved with modifications Application #88-37P - Conservation approval for the construction of an industrial building located on the westerly side of Burnham Street, I zone. The approval was based on plans prepared by) Fuss & O'Neill, project #87-339A, dated April, 1988 and revised 1/6/89, Sheets 1-2 . The following modifications must be adhered to for this permit to be valid: 1 . Black and white transparent mylars of sheets # 1 & 2 with the above modifications and this letter reproduced thereon together with two blueprint copies of the entire set of plans, must be submitted to this Commission to be stamped and signed. This must be completed within 65 days of review prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of $2000 to be submitted to Planning and- Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures . 5 . The permit is valid for one year and shall expire on March 20, 1990 . TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: Site Name P&Z No. Owner Phone No Contractor Signature of Owner Date: Signature of Design Engr. Date: CHANGE: (Describe location and nature of change. Include plan/profile of Change) . t Q r Reason for Change: (Why is change required) C APPROVALS: (As Required) Dir.. 9, f Planning Date: r Town Engineer Date: /! f!S r9 Dir. of Public W k Date: Other: Date: STAFF COMMENTS: f cc: Deputy Town Engineer Zoning Enforcement Officer Chief Building Official r Tiawn a-Ps 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 olt-Coe AREA CODE 203/644-2511 E, f• February 2 7, 1990 Albert Meyer 230 Burnham Street South Windsor, CT 06074 Dear Mr. Meyer: r Re: Application 88-37P - Heyer Gage At the February 26, 1990 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one year extension of Application #88-37P with all original conditions. Application #88-3 7P becomes effective March 20, 1990 and expires on March 20, 1991. Very truly yours, u k Yl wimesA. Lombardi, Chairman Inland Wetlands Agency/ Conservation Commission JAL/pmm cc:John E. McCahill, Zoning/Wetlands Enforcement Officer Marcia A. Banach, Director of Planning John R. Collins, Chief Building Official Planning & Zoning Commission Jerry Iazzetta, Town Engineer Enclosure It At I 1 nA i EX S 0 34 F F 6 CES - t 0— N G 3 SPA GAT. r Be RELO SfRV R s' EX•' T• 1 GRAp NT C 4' p SRVOT a c0 SIDEW ALK c 0 24' T ROAD s jNG PARK CO ps O- TORpGE Ew J K F• t x+ sTls Q 70 1 i it Ir V 6zi - - DATA BLOCK ( I ZONE