Loading...
HomeMy WebLinkAbout22 Sweet Meadow DriveSITE COMPLIANCE CHECKLIST TOWN of SOUTH WINDSOR, CONNECTICUT 22 SWEET MEADOW DRIVE LOT_# 9 Reviewed By pering)MANNARINO BUILDERS INC. Date Reviewed /o ADenied 1169 ELLINGTON ROAD,SOUTH WINDSOR,CT_ Reviewed By SF nning) BP_#_28857_ Ph_#_(860)289-7055 Date Reviewed el uL Denied Date Submitted 10/02/02 FOR C O As required in the Zoning and/or Subdivison Regulations, no Certificate of Occupancy shall be issued until grading plans have been complied with and approved by the Town Engineer. The minimum requirements shall include: Approved Denied'___--'"""N/A 1. Approved building permit plan 2. Finish grading per approved building permit plan 3 . Site work; i.e. trees, shrubs, dumpsters, required parking 4. Utility location; y a. sanitary sewer/septic system b. foundation drain c. electrical & telephone d. water e. ot"r C,54.S gb -0 5. Sewer connection charge paid % 32y,'- `7 6. Appropriate certification 7. Bonding 8. Planning & Zoning/ Inland Wetlands Considerations A. Lighting B. Signage Freestanding Wall C. Fee in lieu of Open Space Sewer Permit No. Pav Exc # COMMENTS: Status: