HomeMy WebLinkAbout22 Sweet Meadow DriveSITE COMPLIANCE CHECKLIST
TOWN of SOUTH WINDSOR, CONNECTICUT
22 SWEET MEADOW DRIVE LOT_# 9 Reviewed By
pering)MANNARINO BUILDERS INC. Date Reviewed /o ADenied
1169 ELLINGTON ROAD,SOUTH WINDSOR,CT_ Reviewed By SF nning)
BP_#_28857_ Ph_#_(860)289-7055 Date Reviewed el uL Denied
Date Submitted 10/02/02 FOR C O
As required in the Zoning and/or Subdivison Regulations, no Certificate of
Occupancy shall be issued until grading plans have been complied with and
approved by the Town Engineer. The minimum requirements shall include:
Approved Denied'___--'"""N/A
1. Approved building permit plan
2. Finish grading per approved
building permit plan
3 . Site work; i.e. trees, shrubs,
dumpsters, required parking
4. Utility location;
y a. sanitary sewer/septic system
b. foundation drain
c. electrical & telephone
d. water
e. ot"r C,54.S gb -0
5. Sewer connection charge paid % 32y,'- `7
6. Appropriate certification
7. Bonding
8. Planning & Zoning/
Inland Wetlands Considerations
A. Lighting
B. Signage
Freestanding Wall
C. Fee in lieu of Open Space
Sewer Permit No. Pav Exc #
COMMENTS: Status: