Loading...
HomeMy WebLinkAbout210 Talcott Ridge RoadEectric 6, eL APPLICATION FOR BUILDING PERMIT Plumbing#210 TALCOTT RIDGE ROAD 30,tc(gIHVAC #l>. 1 M AC Date: fh- Sprinkler# No. 26036 FINAL APPROVALS Estimated Cost $ D o — Building a 1,A9 10M PC-S COMPLETE RED BOXED AREAS Permit Fee C Engineering 1, 10 , 117 TYPE OR PRINT ONLY Occupancy Fee $ S Affidavit 110 1 SIGN ON REVERSE SIDE Appr.for CO. i 199 CT Total Fee 2 a) 3 TO BUILDING DEPARTMENT,TOWN OF SOUTH Wt4DSOR,,CT Additional Cost) $ — The undersigned hereby applies to do work according to the following specifications.- KJobLocation1LotNo. 3 -2-- Side of Street Al Zone Applicant Ckv><, C c L C- Tel# L 1--C-DL n,x Oy )02 Address Owner :g,ry& Address Architect 77---Jp,vA-,Q- Address Sq.Ft.New Area: 1st Fl. 2nd Fl. >y S "-7 3rd FL Total New Area f{ S Rooms Lavatories 1 Bathrooms 3 Garages Purpose of this permit: lid ) 0 U- City Water Well Septic System Seweg-* Ins. H.O. S.P. Cert. V Area 290(0 Basement 140 Garage 31 Approved by 4 Date -7 c1 Use Group 1 "Construction Type R•vu.d 1/97 I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is to be logq1ted the proper distanpq from all street lines,side yard lines,and required distances from all other zones and is located in whichAhk building its allowed. Signed I hereby apply for a Certificate of Occ for d in this application for the permit. Signed DON RITE B OW THIS LINE INSPECTION COMMENTS Inspection / Approval Date By Appl Code Description Due Whom Code Comment 99-26036-B 184,000 B01 FOOTING 07/30/99 DCJ A B02 FOUNDATION 08/11/99 DCJ A E01 SERVICE 09/17/99 DCJ A RELEASED TO N.U. B03 FRAMING (ROUGH) 09/21/99 DCJ A ADD T-BRACE STIFFENERS AT END TRUSSES E03 ROUGH 09/21/99 DCJ A P03 ROUGH 09/21/99 DCJ A PO4 GAS TEST 09/21/99 DCJ A LEFT STICKER WITH JOSE (RAINING) B04 INSULATION 09/23/99 DCJ D REVERSE INSULATION IN GARAGE UNDER BONUS ROOM B10 FINAL 10/28/99 DCJ D NOT READY B10 FINAL 10/29/99 DCJ A APPROVED FOR CO (BLDG) 99-10581-H 9,000 99-10474-P 6,900 99-16459-E 6,000 Total Est Value 205,900 Dwelling 2,906 118,913.52 Basement 1,404 17,409.60 Garage 637 7,898.80 Smoke Det 7 525.00 BOCA Value 163,564.02 Difference 42,335.98) Location of Job: AFFIDAVIT Additional Fee S —0— State of Connecticut ss.South Windsor County of Hartford 1 j 5 Owner6C` c of Agent for the building erected QpnwaK under Permit No.26036 issued by the Building Department of the Town o South Windsor being duly sworn,make oath and say that the actual cost of the completed work authorized under said permit did not exceed the submitted estimated cost $205,900.00. Signed Subcribed and sworn to before me this day of A.D. 19 Estimated Costs 205,900.00 Difference: S —0— 1 Notary Publ'c Y(31 J-L6C) SITE COMPLIANCE CHECKLIST TOWN of SOUTH WINDSOR, CONNECTICUT 210 TALCOTT RIDGE ROAD LOT_# 3 , Reviewed By --%90NA En ineering) CHASE ORCHARDS LLC Date Reviewed a prove enied 2033 ELLINGTON ROAD,SOUTH WINDSOR,CT Reviewed By nning) BP #_26036 Ph # (860) 648-2006 Date Reviewed prove Denied Date Submitted 10/28/99 FOR C f As required in the Zoning and/or Subdivison Regulations, no Certificate of Occupancy shall be issued until grading plans have been complied with and approved by the Town Engineer. The minimum requirements shall include: Approved Denied N/A 1. Approved building permit plan 2. Finish grading per approved building permit plan 3. Site work; i.e. trees, shrubs, dumpsters, required parking 4. Utility location; a. sanitary sewer/septic system b. foundation drain C. electrical & telephone d. water e. other 5. Sewer connection charge paid tofu 6. Appropriate certification 7. Bonding B. Planning & Zoning/ Inland Wetlands Considerations07 Sewer Permit No. 0(pl Pavement Excavation No. COMMENTS: 2 3 N MEW OCT 2 8 1999 ENG.DEFT. , SITE COMPLIANCE CHECKLIST TOWN of SOUTH WINDSOR, CONNECTICUT 210 TALCOTT RIDGE ROAD LOT- # -3 °A. Reviewed By S• ZN/`neering) CHASE ORCHARDS LLC Date Reviewed A proved enied 2033 ELLINGTON ROAD,SOUTH WINDSOR,CT Reviewed By anning) BP # 26036 Ph_# (860) 648-2006 Date Reviewe i Approv /Denied Date Submitted 04/30/99 FOR BUILDtNG PER In accordance with the Zoning and/or Subdivision Regulations, prior to the building of any structure on a lot, a Topographic Plot Plan shall be submitted for approval. The minimum requirements shall include: Apprgved Denied N/A 1. Name, address & phone number of owner/applicant 2. Name, address & phone number of plan preparer 3. Zoning Information - i.e. zone, open space, floodway, etc. 4. Plot Plan at 1" = 4e6' scale a. Subdivision reference, abutting properties, etc b. Easements of record C. Lot description, bearings, building lines, distances, area, etc. d. Contours, existing & proposed, 1 or 2 ft. interval where appropriate e. Building location with dimensions. Elevations of proposed finish floor, garage floor & centerline of road at driveway f. Elevations of gravity drainage systems, sanitary foundation drain at the house and the street g. Tentative utility location (gas, water, electric, septic system, etc.) h. Title block with name and address of preparer, date, appropriate certification, live seal and live signature consistent with the Board of Registration requirements. (P.E. & L.S. ) 07 5. Sedimentation and erosion control 6. Special Planning & Zoning, Inland/Wetlands considerations (Plans on file w/Town Clerk) COMMENTS: 4 Q MAY 31999 r t 4 ll t I FDEARMENT DECISION APPLICATION FOR ELECTRICAL PERMIT PERMIT# tion is hereby:TOWN OF SOUTH WINDSOR 45 9 BUILDING DEPARTMENT PROVED 1540 SULLIVAN AVENUE Bldg.Permit# 644-2511 ext. 230BuildingInspector Application must be printed or typed Location of Job:FFEESCHEDULE CD lvc c 0-$1,000=$13.00 Street No. Street Lot No. Over$1,000= 13.00 per$1,000 or any fraction thereof Tenant Designation Apt.No.I APPLICANT y` APPLICANT ADDRESS c C c Y APPLICANT PHONE# (!9 60) 00011,11,11111111,11,1111111 N S OWNER — . s e 0,11 O W Fq OWNER ADDRESS; S iotCA aka 7 Y OOWNER PHONE I'OJU C ESTIMATED COST$ Q!2j-, oO IS THIS A CONTRACT COST? Wyes 0 No FEE ENCLOSED$ a TYPE OF JOB: SpR-CO M'I ew Installation t i 0 Alteration/Addition/Repair Revised 8/99 APPLICATION FOR ELECTRICAL PERMIT (Continued from reverse side) TYPE OF BUILDING IS THIS APPLICATION ASSOCIATED WITH A RESIDENTIAL I BUILDING PERMIT APPLICATION? 0"'YES NO BUSINESS CURRENT USE AND OCCUPANCY ASSEMBLY MERCANTILE FUTURE USE AND OCCUPANCY EDUCATIONAL INSTITUTIONAL ENGINEER'S NAME PHONE FACTORY STORAGE ADDRESS GARAGE MIXED USE CITY STATE ZIP Other please specify) TYPE OF INSTALLATION/WIRING METHOD r SIZE OF SERVICE SIZE OF MAIN CONDUCTORS C NUMBER OF METERS I NUMBER OF DISCONNECTS AND RATINGS GC) NUMBER OF PANELS REMOTE DISCONNECT REQUIRED? t9 YES ®NO NUMBER OF LIGHT CIRCUITS NUMBER OF POWER CIRCUITS /c;Z- NUMBER OF SWITCHES !!5 NUMBER OF OUTLETS NUMBER OF LIGHT FIXTURES 3 NUMBER OF HEAT CIRCUITS NUMBER OF A/C CIRCUITS SEPARATE HEAT LOSS AND A/C CALCULATIONS MUST BE SUBMITTED. DESCRIPTION OF WORK THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFORMANCE OF SUCH WORK. o CONTRACTORS LICENSE NO. STATE SIGNATURE OF APPLICANT DATE orto 7—al"v 94 Rck Facetwin screen Print for jourda, from "UNIX" 9/17/99 1:33:51 PM Query Next Previous Add update Remove Table Screen Current 2.02 AAAAAAAAAAAAAAAAAAAAAAA PERMIT MAINTENANCE / INSPECTIONS Permit Type BUILDING PERMI Permit No.99 - 26036 - B Master serial 1 413091 Status serial No 1 1431861 Inspection / Approval Date Date By Approval Code Description Due completed whom code Time JE011 SERVICE 1 1 109/17/991 JDCJJ IA I I I Comments (RELEASED TO N.U.I Comments I I There are no more rows in the direction you are going DEPARTMENT DECISION APPLICATION FOR PLUMBING PERMIT 1 ! Application is hereby:TOWN of SOUTH WINDSOR BUILDING DEPARTMENT Bldg Permit# APPROVE 1540 SULLIVAN AVENUE 6 O 3 644-2511 ext. 230 ate lding Inspector Application must be printed or typed Location ofjob 210 TALCOTT RIDGE ROAD LOT#32 Street No. Street Lot No. FEE SCHEDULE Floor Apt.No. 0 - $1,000 - $12.00 Over $1,000 12.00 per$1,000 OWNER CHASE ORCHARDS LLC or any fraction thereof ADDRESS 011 EL.L.TNGTON ROAD SOUTH WINDSOR, CT 06074 OWNERS PHONE# 860 648-2006 APPLICANT FRANK MAURT ADDRESS 29 BISSELL STREETpvrNSFq r EAST HARTFORD, CT 06108 ESTIMATED COST$ 6900.00 c g*. C ; IS THIS A CONTRACT COST?X o V YES NO r CJ FEE ENCLOSED $91.00 TYPE OF JOB:OR-CO X Original Installation Alteration/Addition/Repair Revised 10/96 APPLICATION FOR PLUMBING PERMIT(Continued from reverse side) TYPE OF BUILDING IS THIS APPLICATION ASSOCIATED WITH A BUILDING PERMIT APPLICATION YES / NO RESIDENTIAL BUSINESS CURRENT USE AND OCCUPANCYASSEMBLY MERCANTILE FUTURE USE AND OCCUPANCY SINGLE DWELLING EDUCATIONAL INSTITUTION FACTORY ENGINEER'S NAME PHONE STORAGE GARAGE ADDRESS MIXED USE CITY STATE ZIP Other please specify) TYPE OF INSTALLATION ORIGINAL, SIZE OF MAIN DRAIN 4" NO. OF TOILETS _STYLE SIEHON NO. OF URINALS STYLE NO. OF BATHTUBS 1 NO. OF SHOWERS 1 NO. OF LAVATORIES 4 NO. OF CONDUCTORS SIZE NO. OF STACKS 1 SIZE 3" AREA OF ROOF NO. OF CATCH BASINS NO. OF FLOOR DRAINS NO. OF OTHER FIXTURES 1 KIND WHIRLPOO ARE TOILET COMPARTMENTS VENTILATED TO OUTER AIR BY A WINDOW YES/I4X SIZE OF WINDOW 3 X 3 IF NONE C.F.M. OF VENTILATOR SIZE OF DUCTS SEWER OR SEPTIC TANK SEWER SIZE OF WATER MAIN 1" SIZE OF WATER PIPING&RISER 3./4 & 1/2 WATER HEATER TYPE GAS MANUFACTURE AMERICAN A TANKS SAFETY DEVICES TEMPERATURE CAPACITY GAS RELIEF VALVE 100 XL TEST PRESSURE 300 WORKING PRESSURE 150 PRESSURE RELIEF VALVE 100 XL TYPE MANUFACTURER DESCRIPTION OF WORK COMPLETE PLUMBING FOR NEW SINGLE DWELLING THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONN.BUILDING CODES IN THE PERFORMANCE OF SUCH WORK. 201334 P-1 lq NAME STATE LICENSE NO. TYPE SIGNATURE OF APPLICANT PHONE NO. 289-9511 DATE T( 1 I tr DEPARTMENT DECISION APPLICATION FOR HVAC PERMIT PE # Application is hereby:TOWN of SOUTH WINDSOR BUILDING DEPARTMENT Bld Permit# APPR 1540 SULLIVAN AVENUE b 644-2511 ext.230 Date Building Inspector Application must be printed or typed Location of job 7AA cor ttR D READ CZ 4 3Z. Str o. _Street Lot No. j FEE SCHEDULE Floor Apt.No. 0 - $1,000 - $12.00 Over $1,000 I 12.00 per$1,000 or any fraction thereof OWNER ADDRESS OWNERS PHONE# APPLICANT 6 ce .S o /+-1 4 s Y el f' / C 0W N S F ADDRESS Toxc c. 4 c--,.v4- C q< OG ESTMATED COST $ O O C) C IS THIS A CONTRACT COST? _ YES NO 1 C1 FEE ENCLOSED $ 41D' TYPE OF JOB:SCR CO Original Installation r Alteration/Addition/Repair Revised 11/95 APPLICATION FOR HVAC PERMIT(Continued from reverse side) TYPE OF SYSTEM TYPE OF BUILDING HEATING RESIDENTIAL A/C COMMERCIAL VENTILATION INDUSTRIAL HEATING STEAM LOW PRESSURE LIMIT LBS.HIGH PRESSURE LIMIT LBS. HYDRONIC WARM AIR-k UNIT RADIANT HEATER EXISTING RADIATION ADDITIONAL RADIATION TOTAL RADIATION DESIGN TEMP. OUTSIDE D F INSIDE DIFFERENCE?Z F TOTAL HEAT LOSS(BTUH) o HEAT LOSS SHEET MUST ACCOMPANY APPLICATION) DESCRIBE ALL HEATING EQUIPMENT (INCLUDING MAKE&MODEL NO.) 4 ti Ad —,- G — 102.lf—, GROSS HEATING CAPACITY (INPUT-BTUALIONET RATING (OUTPUT-BTUH) Oo d TYPE OF FUEL OIL-GPM GAS-INPUT v d 0 ELECTRIC-KW OIL TANK SIZE&LOCATION INSIDE OUTSIDE CAPACITY LPG TANK CAPACITY AIR CONDITIONING DESIGN TEMP. OUTSIDE O F INSIDE F DIFFERENCEZ jF TOTAL HEAT GAIN(BTUH) yYQ-6 v HEAT GAIN SHEET MUST ACCOMPANY APPLICATION) DESCRIBE ALL COOLING EQUIPMENT (INCLUDING MAKE&MODEL NO.) a- O (fp TONNAGE_ COOLING CAPACITY(BTUH) 4 VENTILATION DESCRIBE ALL AIR HANDLING EQUIPMENT(INCLUDING KITCHEN EXHAUST EQUIPMENT) TOTAL SIZE OF SYSTEM(CFM) FRESH AIR INTAKE(CFM) PLANS MUST ACCOMPANY APPLICATION) FURTHER DESCRIPTION OF WORK T G l iz THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONN.BUILDING CODES IN THE PERFORMANCE OF SUCH WORK. 30 1'120 (124 STATE LICENSE-NO.NAME&TYPE SI kTcmt OF APPLICANT PHONE NO. (C),,S'_5,^/ t1, DATE awl a .' M Lennox objective Guide to Z nstal l ati on C ompari son LOGIC Software Group Lennox Industr•i eF IOC . Dallas , TX i - 800-527 -.?506 10/04/96 LOGIC 1000 RESIDENTIAL LOADS ANALYSIS PAGE 1 CHASE ASSOC , JOHN DORAN PREPARED FOR ; BL.D , DEPT . PREPARED BY ,. LARRIE MEYER / C .A. S . FILE TITLE GORAN2 r Cb tr+" ll"9 Fisr/ DESIGN TEMPERATURES (06GREES F ) WIN*1 ER • INSIDE 72 WINTER ouTsinE. 0 SUMMER ?N''TDF 75 SUMMER OUTSIDE RJR) DAILY TEMPERATURE RA(,,I(',f= ) 1,4r.'11•CAT0R h DESIGN GRAINS RELATIVE: HUMIDITY DEGREES NORTH LATITUDE 4 SUMMER AIR CHANGES PE•.R HOiJR 1 . 0 WINTER AIR CHANGES PER HOUR 0 . 7 AREA BT1JH BTUH \ \ SQ FT L 0 S GAIN , ROOM - 1 FAMILY ROOM IN ZONE 1 19 X 17 WALL 12J3 R- 19 + 1/2 bR 3/4• INCH EXTR POLY 107 385 100 WINDOW 3A DOUBLE PANE CLR GLASS WOOD FRM FACINia-N 45 1 ; 785 540- TINT-TINTED SHADING-DRAPES HALF DRAWN SHADING {'0EFF1CIENT = 1 WALL 12•J3 R- 19 + 1/2 OR 3/4 INCH EXTR POLY 136 490 126 f OVERHANG = 1 . 0 FLOOR 19A HARDWOOD OR VINYL FLOOR' + NO INS 289 :3 , 246 0 WINTER INFILTRATION 31 CFM 418 UMMER INFILTRATION 44 CFM SENSIBLE GAIN 720 dp LATENT GAIN 1 , 24(3 L. PEOPLE 6 SENSIBLE GAIN 1800 LATENT GAIN 1380 L DU{T LOSS MULT= , 1 0 GAIN MULT= . 10 832 329 TOTAL F lF; F;;M 1 2 584 CU FT r L•IY 1LL,.t y , I7U J"I'D-14 - a L.A T E N T 2 , 6 2 6 L. 10/04/96 LOGIC 1000 RESIDENTIAL LOADS ANALY5IS PAGE 2 CHASE ASSOC-. jOHN DRAWN AREA STIIH BTUH S FT L0 GAIN ROOM — .2- KITCHEN 1N ZONE 1 2.6 . X 13 WAI-1_ 12J3 R— 19 + 1/2 OR 3/4 INCH EXTR POLY 163 587 : 152 OVERHANG - 1 . 0 DOOR 80 31_DNG DR , 2 PN CLR GLASS METAL_ FAC-ING-N 36 1 , 879 396 TINT—TINTED SHADING—DRAPES OR BLINDS SHADING COEFFICIENT = 1 WINDOW 3A DOUBLE PANE CLR GLASS WOOD FRM FACING—N 9 357 108 TINT—TINTED SHADING—DRAPES HALF DRAWN SHADING COEFFICIENT = 1 REVEAL = 1 . 0 FLOOR 19A HARDWOOD OR VINYL FLOOR + NO .INS 338 31796 0 WINTER INFILTRATION 31 CFM 2 , 418 SUMMER INFILT•RA.TION 44 CFM SENSIBLE GAIN 720 LATENT GAIN 11246 L MECHANICAL VENTILATION 50 , 0 CFM 3 , 960 825 PEOPLE 6 SENSIBLE GAIN 1800 LATENT GAIN 1360 L APPLIANCES 1200 DUCT LOSS MULT= . 10 GAIN MULT= , 10 11300 520 TOTAL FOR ROOM 2 21704 CU FT 338 SENSIBLE 14 , 297 51720 LATENT, 41054 L + _. 1 ROOM - 3 DINING ROOM IN ZONE 1 13 X 15 WALL 1 2•J 3 R— 1 9• + 1/2 OR' 3/4 INCH EXTR POLY 86 3 1 0 80 i OVERHANG = 1 , 0 WINDOW 3A DOUBLE PANE CLR GLASS WOOD FRM FACING-N 18 714 216 TINT-TINTED SHADING-DRAPES HALF DRAWN SHADING COEFFICIENT = 1 WALL 12...13 R- 19 + 1/2 nR 3/4 INCH EXTR POLY 120 432 112 OVERHANG = 110 FLOOR 19A HARDWOOD OR VINYL FLOOR +• NO INS 195 21190 0 MINTER INFILTRATION 12 CFM 967 3IJMMER INFILTRATION 17 CFM SENSIBLE GAIN 288 LATENT GAIN 498 L PEOPLE 6 SENSIBLE GAIN 1800 a•.., ,...•, LATENT GAIN 1380 L It1M,e.OaWva'ir7Q!+a'{'.!;'S'3' •'''''?^r•...;_ O gig 4 t... _ DU( T: ; LOSS MULT= . 10 GAIN MULT= . 10 461 370 r , 1 10/04/96 LOGIC 1000 RESIDENTIAL LOADS ANALYSIS PAGE 3 CHASE ASSOC , JOHN DRRAN AREA BTUH BTUH SQ FT L'G t•S GAIN C}'f A L c.I? F;fyr1I, DI 6 0 ':'11 F T 1 00 M — 4 L.:l. N —'.1joi T ry I 1ALL 1 2•J3 R-. 19 R. W4 !NCH EXTR POLY r.:.VE RHANi; 1 IINDOW 3A c-k`) 6l..i"' 11. r _AS J Wc,i) FRS itJ. TINT:.. ., ; ;; r : SHADING—DR APE.:' HAI. F Dfit'.•h•.1•l!r.' SHADING; ALL 12J3 R— 19 + 1/2. OR 3/4 INCH EXTR POLY 120 4 OVERHANG = 1 . 0 LOOR 19A ' 'HARDWOOD OR VINYL FLOOR '+ NO INS 182 21044 0 INTER INFILTRATION 20 CFM 1 , 61 UMMER INFILTRATION 29 CFM SENSIBLE GAIN 480 LATENT GAIN 830 L E0PUE: 6 SENSIBLE GAIN 1800 LATENT GAIN 1380 L 1200 \PPLIANCES UCT LOSS MULT=- . 10 GAIN MULT= . 10 557 414 i OTAL FOR ROOM 4 11456 CLI FT 182 i SONS IB I_E E , 1 3 1 4 , S.5 ' LATENT 210 L OOM — 5 FOYER IN 1r?NE 1 8 X 20 ALL 12J3 R - 19 + 1/2 OR 3/4 INCH • EXTR POLY 32 115 0 OVERHANG = 110 1 INDOW 3A DOUBLE PANE CLR GLASS WOOD FRM FACING—S 14 555 238 TINT—TINTED SHADING—DRAPES HALF DRAWN SHADING COEFFICIENT - 1 OOR 10H PANEL & WOOD :NORM 18 467 121 INTER INFILTRATION 22 CFM 11719 UMMER INFILTRATION 31 CFM l SENSIBLE GAIN 12 LATENT GAIN 886 L EOPL•E 2 SENSIBLE GAIN 600 LATENT 'GAIN 460 L+ LOSS MUL.T= . 10 GAIN MULT= , 10 286. 270 10/04/96 LOGIC 1000 RESIDENTIAL LOADS ANALYSIS PAGE 4 CHASE ASSOC , JOHN DRRAN r AREA BTUH BTUH SQ FT LOSS GAIN TOTAL FOR ROOM 5 1 , 280 C U FT ENSIBLE 31142 21970 LATENT 1 , 346 L ROOM - 6 DEN IN ZONE 1 11 X 13 WALL 12J3 R- 19 + 1/2 OR 3/4 INCH EXTR POLY 58 209 54 OVERHANG = 110 WINDOW 3A DOUBLE PANE CLR GLASS WOOD FRM FACING-S 30 1,1190 475 TINT-TINTED SHADING-•DRAPES HALF ,DRAWN SHADING COEFFICIENT '= 1 FLOOR 19A HARDWOOD OR VINYL FLOOR + NO INS 143 1 , 6 0 WINTER INFILTRATION 20 CFM 1 + G12 SUMMER INFILTRATION 29 CFM SENSIBLE GAIN 480 LATENT GAIN 830 L. PEOPLE 4 SENSIBLE GAIN 1200 LATENT GAIN 0'?() L APPLIANCES 1I(!G OUCT LOSS `MULT= . 10 GAIN MUL•1'= . 1 0 4-62 41 TOTAL FOR ROOM 6 11144 CU FT 143 SENSIBLE 5 , 079 3 , 750 LATENT 1 , 750 L ROOM - 7 BATH IN ZONE 1 7 X 8 FLOOR 19A HARDWOOD. OR VINYL FLOOR + NO INS 56 629 0 WINTER INFILTRAT'TON 0 C'FM 0 SUMMER INFILTRATION 0 C(M SENSIBLE GAIN 0 LATENT. GAIN 0 L. PEOPa E 1 SENSIBLE GAIN 300 LATENT GAIN 230 L DUCT LC,SS MULT,= . 10 GAIN I+L!1_T= . 10 63 0 TOTAL FOR Rn;.,M 7 448 CU FT 5E; SENSIBLE 692 330 LATENT 230 L.. ROOM - 8 M , F'• , R , IN ZONE 2 18 X 17 WALL,I ziJ K- 1 ;1 * 1/ Z UK J/ 4 1NCH tX I R NULY 99 356 92 .{ OVERHANG - 1 , 0 I w w'r- 10/04/96 LOGIC 1000 RESIDENTIAL LOADS 'ANALYSIS PAGE 5 CHASE ASSOC . JOHN DORAN AREA B•fUH BTUH SG? FT L.0S::GAIN WINDOW 3A DOUBLE PANE CLR GLASS WOOD FRM FACING-N ~ 45~- 1 ,785 540 TINT-TINTED SHADING-DRAPES HALF DRAWN SHADING COEFFICIENT = '. 1 r , WALL 12.•13 R- 19 * 1/2 OR 3/4 INCH EXTR POLY 136 490 126 C)VE RHANG - 1 . 0 CEILING 16G DARK R-•30 INSULATION 306 727 3'94 WINTER INFILTRATION 31 CFM 418 SUMMER INFILTRATION 44 CFM SENSIBLE GAIN , 120 LATENT GAIN 1 ; 24 6 I.. PEOPLE 2 SENSIBLE GAIN 600 LA T E N T G 7,I•N 4 (,0 l_ DUCT L0 S, MULT 10 GAMIN MULT 1,0 576 247 TOTAL FOR ROOM 8 21448 CU FT 306 i i SENSIBLE 6 ; 354 2 ; 719 LATENT 1 ROOM - 9 M . BATH IN BONE. 2 19 X 9 WALL 12•.13 R- 19 }• 1/2 0R 3/4 INCH EXTR POLY 136 490 126 \ UVERHANG ' - 110 WINDOW 3A DOUBLE BANE CLR GLASS WOOD FR1.1 FACIN(, -N 16 635 192f TINT-TINTED SHADING--DRAPES HALF DRAWN HAflING COEFFICIENT = 1 CEILING 16G DARK R-a0• INSULATION 171 406 220 WINTER INFILTRATION 11 CFM 860 SLIMMER INFIL.•fRATION 16 CFM SENSIBLE GAIN 256 LATENT GAIN 443 LI MECHANIr'AL VENTILATION 75 . 0 CFM 5 , 940 1 , 738 i PrOPLE 2 SENSIBLE GAIN 600 LATENT GAIN 460 L 0IJCT LOSS MULT= . 10 GAIN MULT= . 10 833 263 EN`z I B L E 9 . '1 t33, ;? ; 89 I..ATE:.NT 3 , 045 I_ Cj_ r i •i 'r 91 ::.i:J..k'. t,1•._ n1..L.L t.)V t,h d A i`l A. Y 1 1 10/U4 LOGIC 1000 RESIDENTIAL LOADS AANALY:=I PAc;E 6 AR(.A TIIH F 1" WINDOW 3A DOUBLE PANE CLR GLA!,: F R M FACING.:—N f i, E;c. LINT—'TINTED SHADING—DRAPE HALF DRAWN SHADING COEFFICIENT '1 A WALL 12•J3 R- 19 + 1/2 OR 3/4 INCH EXTTR POLY 96 346 89 OVERHANG = 1 . 0 CEILING 16G DAR14 R-30 INSULATION 240 570 309 WINTER INFILTRATION 20 CFM 1 , G12 SUMMER INFILTRATION 29 CFM SENSIBLE GAIN . 480 LATENT GAIN 830 l_ PEOPLE SENSIBLE GAIN 600 LATENT GAiN 460 1. DUCT l.0012 MIJI_T= , 10 GAIN MULT= . 1,U 4 19 196 TOTAL FOR ROOM 1.0. 1 , 920 CU FT 240 SENSIBLE 4 , 604 23f57 LATENT 1 1290 l_ ROOM - ' 1 1 B R . 3 IN ZONE 2 1 :3• X 12 WALL 12413 R - 1 9 + • 1/2 OR 3/4 INCH EX•Tf\ Poi-Y 74 266 69 ` OVE RH•,I.Nrl; - 1 . 0 WINDOW A DOUBLE PANE CLR GLASS WOOD FRM FACING-S 30 1 , -190 475 TINT—'TINTED SHADING—DRAPES HALF DRAWN SHADING COEFFICIENT = 1 CEILING 16G DARK R -30 • INSLILAT'ION 15Fi 1 01 WINTER INFILTRATION 20 CFh4 t '12 S11MMER INFILTRATION .29 CFM SENSIBLE r*,AIN 480 LATENT` GAIN 830 L PEOPLE 2 SENSIBLE GAIN 600 LATENT ' GAIN 460 L DUCT L0'_3 S M11LT= 10 GAIN MULT= . 10 344 , 182 TOTAL FOR ROOM 1 1 1 , 248 CU FT 1 Fa6 SE NS16LE; 3 , 783 2 , 007 LATENT i , 290 l_ RQO M - 12 6 . R . 4 IN ZONE 2 1 1 X 13 6'ALL. 12•J3 R-- 19 1 /2 OR 3/4 .INCH EXTR POLY 58 2CY9 54 W:I N DOW 3A DOUBLE PANE CLR GLASS WOOD FRM FACING-S 34 1 , 180 '" '' 4751, w; 1 TINT-TINTED SHADING-DRAPE, HALF DRAWN Sj• 9M f` ' .11'I.f 10/04/96 LOGIC 1000 RESIDENTIAL LOADS ANALYSIS PAGE 7 CHASE A'=SOC . JOHN .DRRAN AREA BTUH STUN SQ FT I_.C?SS GQ.IN SHADING COEFFICIENT — 1 WALL 12J3 R- 19 + 1/2 OR 3/4 INC.H EXTR 'POLY 40 173 45 OVERHANG 1 . 0 l CEILING 16G DARK R-30 INSULATION` ' 14 ; t+U 1 ''4 WINTER INFILTRATION 20 CFM i , I; 12 SUMMER INFILTRATION 29 CFM SENSIBLE GAIN 480 LATENT GAIN 830 L. PEOPLE 2 SENSIBLE GAIN 600 LATENT GAIN 460 L. DUCT L.001S MULT= . 10 GAIN MULT= , 10 35=' 184 TOTAL FOR ROIM 12 1 , 144 CU FT 143 SENSIBLE 31876 21021 LATENT ' 1 , tat) L ROOM — 13 BONUS ROOM IN ZONE 3 11 X 22 WALL 1 2.J 3 R-- 1 J . * 1/2 OR 3/4 INCH E'XTR POLY 73 263 6113 OVE E;HANG = 1 . 0 WINDOW 3A DOUBLE PANE CI_R GLASS WOOD FRfe1 FACING - 15 395 a0 TINT—TINTED SHADING--DRAPES HALF DRAWN HAD ING ,'.OF. F ICIENT - 1 WALL 1 2•- R 19 1 Al2 OR 3/4 I:NC'H EXTR POLY i 2L, 4 C 1 1 i cl O'VC HA.Ntl , 1 , 0 WAt.L. 12J R ' 19 + 1/2 OR 3/4 ' •INCH EXTR POLY 1 ?-3 461 9 OVERHANG - 1 . 0 CEILING 16G DARK R-30 INSULATION j+'? 75 1 1 FLOOR 19A HARDWOOD OR VINYL FLOOR + NO INS 242 ? , 7 18 0 WINTER INFILTRATION 10 CFM 806 SUMMER INFI:LTiiATION 15 CFM SENSALE GAIN 240 LATENT GAIN 415 L PEOPLE 4 SENSIBLE GAIN t200 LATENT GAIN 920 L DUCT L.M U L I = , 10 GAIN MULT= , 10 10TAL F )R, R 0M 1 ;3 1 , 93E CL, FT 4:' S E N Pi I._E 6 to 643 2 , 52t; LATENT ' 1 , :3:35 4— R';•yf+, I 10/04/96 LOGIC 1000 RESIDENTIAL LOADS 'ANALYSIS PAGE S ' CHASE ASSOC JOHN LORAN* STRUCTURE TOTALS 21 , 240 CU FT 21655 SENSIBLE L.AT ENT 4 x 0 c) !. MINIMUM Cooling Capacity needed is 63 , 379 btu at 90 degrees outside and 75 degrees inside Maximum Desired Cooling Capacity is 72 , 865 btu 115% of Total Load) r Version-;92 . 12 This Heating and Cooling Load Computation was produced using the prc?ceciLrr-e^ and tables of.. the Ai r Condi ti oni ng Contractors of Amwr•i caI a Ma11 u•:al J, , * Seventh Edition . T.fle accuracy of the calculated loads depends upon the accuracy of the data -used and the accuracy of th'A Manual J 1 ()A'd c•9 l Cul l at i on procedures for• the given conditions . . • No war•r•anty , either '?xpr•e. 5i: (a i mp1'i ed , is given by Lennox Industrli es Inc , with respect to the a::t::!r •_:.. i and/or suffi ci en6y of the information provided by this report . 4