HomeMy WebLinkAbout205 Debbie Drive (2)Bectrir# APPLICATION FOR BUILDING PERMIT
Plumbing# 205 Debbie Drive
HVAC # Date:
Sprinkler#28665
FINAL OV Estimated Cost $ 5, o 6 Oildirngry / COMPLETE RED BOXED AREAS Permit Fee 7 f,r4TYPEORPRINTONLYOccupancyFeeUAffidavitSIGNONREVERSESIDEAppr.for C / v Total Fee
TO BLA MBVT,TO OF SOUTH WMSOR,CT Additional Cost) $
The undersigned hereby applies to do work according to the following specifications:
Job Location D (0-5 Lot No. Side of Street Zone
Applicant e.a Tel# 7;-75-
Address / a o( Ew Zip Lic.#
Own r 4 L d Address SQ,.. La
Architect_ S_a Address
Sq. Ft.N w Area: 1st FI. 2nd FL 3rd FL Total New Area
Rooms
I#Lavatories Bathrooms Gara s
Purpose of this permit:e K a Trfta y ooL,1-1
City Water)K Well Septic System Sewer.a.
Ins. H.O. S.P. Cert. Area Basement Garage
Approved by Date Id Use Group U Construction Type
Rersed 1/97
I hereby agree to conform to all the requirements of the Laws of t State o ec`ticut and the Ordinances of the Town of
South Windsor and to notify the Building Inspector of any aft on in the or specifications of the Building for which this
permit is asked,and agree that this building is to be locat a prpper from all street lines,side yard lines,and required
distances from all other zones and is located in whic ild' g an se is allowed.
Signed
I hereby apply for a Certificate Zcupan&cye )det,,jiin s application for the permit.
Signe
DMINOT WRITE BELOW THIS LINE
INSPECTION COMMENTS
r
Inspection / Approval Date By Appl
Code Description Due Whom Code Comment
28665-B 5,000
B01 FOOTING 04/03/02 JFF A 7 PIERS WITH OWNER
B01 FOOTING 04/10/02 JFF A WITH CONTRACTOR 3 ADDITIONAL PIERS
B10 FINAL 04/23/02 JFF D ADJUST CLOSER GRIPPABLE RAIL SILLCOCK AN
DRYER VENT BLOCKED CALLED CONTRACTOR
B09 OTHER 05/02/02 JFF WITH OWNER WENT OVER CONDITIONS TO CORRECT
PRIOR TO ISSUANCE OF COFO
B10 FINAL 05/07/02 JFF D WITH OWNER GATES NOT SELF CLOSING OR LATCHING
GRIPPABLE RAILS RAIL NOTCHED CALLED CONTRACTO
B10 FINAL 05/14/02 JFF D WITH OWNER LAG LANDING ANGLE RAIL SO WINDOW
OPERABLE CALLED CONTRACTOR LEFT MESSAGE
B10 FINAL 05/28/02 JFF D ADD LAG GATE BINDING WINDOW TOP RAIL CALLED
LEFT MESSAGEWITH CONTRQACTOR
B09 OTHER 06/06/02 JFF CONTRACTOR FAILED TO APPEAR FOR APPOINTMENT
B10 FINAL 06/11/02 JFF A WITH OWNER NOTE PLEXIGLASS CRACKED RAIL BLOCK
ING CASEMENT WINDOW DOESNT VIOLATE VENTILATIO
B10 FINAL 06/11/02 JFF A CLOSED OUT.