HomeMy WebLinkAbout204 Newberry RoadSITE COMPLIANCE CHECKLIST
TOWN of SOUTH WINDSOR, CONNECTICUT
204 NEWBERRY ROAD LOT_# 2 Reviewed By r33D En ineering)
CONRAD R. NURGE JR Date Reviewed o3 ve
92 CRAIGEMORE CIRCLE,AVON,CT Reviewed By L Plannin )
BP_#_29574_ Ph_#_675-0002 Date Reviewed Approve
Date Submitted 05/12/03 FOR BUILD NG PEIU
In accordance with the Zoning and/or Subdivision Regulations, prior t t e
building of any structure on a lot, a Topographic Plot Plan shall be submitted
for approval. The minimum requirements shall include:
Appr ed Denied N/A
1. Name, address & phone number of owner/applicant
2. Name, address & phone number of plan preparer
41
3.i.e. zone, open space,
floodway, street address.
y
w
4. Plot Plan at 1" _ gyp' scale
t/ a. Subdivision reference, abutting properties, etc
b. Easements of record
C. Lot description, bearings, building lines,
distances, area, etc.
d. Contours, existing & proposed, 1 or 2 ft.
interval where appropriate
e. Building location with dimensions.
Elevations of proposed finish floor, garage
floor & ct-ntArl ine of road t dravewa r
T,
f. Elevations of systems, sanitary
foundat iQ d-ai n at the house and the street
g. Tentative utility location (gas, water
electric, septic system, etc. )III
r h. Title block with name and address of preparer,
date, appropriate certification, live seal and live
signature consistent with the Board of Registration
requirements. (P.E. & L.S. )
5. Sedimentation and erosion control
6. Special Planning & Zoning, Inland/Wetlands
consideratio Plans on file w/Town Clerk)
COMMENTS:f
lv C p.-6a
INA-Pl C
Jo-y:, .- s rW I e c a,-. a eP d4 sue,. ti••
Pr,oT- f-l" 5