Rd1% MATERIALS ESTING, INC.
0
i 200 ROWE AVENUE MILFORD, CONNECTICUT 06460 • (203)878-2765
IlIlIftWO" 871 STAFFORD ROAD EAGLEVILLE, CONNECTICUT 06268 (860)487-1972
NVLAP ACCREDITED DATE: 02-25-00
0320
REPORT NO: M-1002
CLIENT:Temple Beth Hillel AMBIENT TEMP: 40OF
101 Foster Street Ext. IV
South Windsor, CT 06074 w
4 C`'O ;PIER: Light rain
N
a
PROJECT: Temple Beth Hillel s r
20 Baker Lanet: 81
South Windsor, CT gti4'Q
SUBJECT: CONCRETE PL ACFMENT INSPECTION 3
Concret Placement Locations: Continuous footing from 15-N to 7-C lines.
Total Concrete Yardage This Date: 20 cubic yards @ 3000 PSI*.
All reinforcing steel was properly placed in accordance with drawings:
S-1, S-2 & S-3, dated 10-15-99.
Cylind rs, slump and air content were performed and are as reported on Compression T st
R sult Sheet. This report will follow when compression strength test results are known.
Remarks: *Inspector could not stay for balance, arrived as scheduled for a 9:00 placement and was
notified placement was changed to 11:00. Another inspection was scheduled in Farmington
for 12:30-1:00. Site supervisor requested an inspection on placement of structural fill
material in interior foundation areas. Material was placed in 8" lifts and was in the process
of being compacted with a vibratory roller. A sample of material was taken for a sieve &
proctor analysis.
Materials Testing, Inc. Inspector,
Richard Wright
Frank A. Soucy
1 cc: Client
1 cc: Podojil Builders/R. Podojil
1 cc: Town of South Windsor
1 cc: Levin/Brown &Assoc., Inc.
1 cc: LPJ/Qodesh, Inc.
1 cc: Podojil Builders/W. Laramee
kll
Test reports may not be reproduced without the express permission of Materials Testing,Inc. Test reports must not be used toclaim product endorsement by M/LAP orany agencyof the
U.S.Government. Results only relate to Items tested.
A/'0M4%1
Rd - MATERIALS TESTING, INC
200 ROWE AVENUE a MILFORD, CONNECTICUT 06460 • (203)878-2765
871 STAFFORD ROAD EAGLEVILLE, CONNECTICUT 06268 a (860)487-1972
NVLAP ACCREDITED DATE: 04-17-00
0320
REPORT NO: M-1008
CLIENT:Temple Beth Hillel AMBIENT TEMP: 560F
101 Foster Street Ext. 00%C111fr1''11i1d
South Windsor, CT 06074 p ,
M Ao,,,• ''
Partly cloudy
QL , E
PROJECT: Temple Beth Hillel qr
20 Baker Lane
South Windsor, CT
SUBJECT: CONCRETE PLACEMENT INSPECTION ssr"`
1111r t
Concr to Placement Locations: A to R line, 1 to 19 line, slab on grade. Line J.1 & 5.1 columns;
J.1 & 5.2 columns; J.1 & 5.3 columns.
Total Concrete Yardage This Date: 230 cubic yards @ 3500 PSI
All reinforcing steel was properly placed in accordance with drawings:
S-1, dated 10-15-99.
Cylinders, slump and air content were performed and are as reported on Compression Test
Re ult Sheet. This report will follow when compression strength test results are known.
R marks: None
Materials Testing, Inc. Inspector,
Bi I Pinheiro
14
Frank A. Soucy
1 cc Client
1 cc Podojil Builders/R. Podojil
1 cc Town of South Windsor
1 cc Levin/Brown &Associates, Inc.
1 cc LPJ/Qodesh, Inc.
1 cc Podojil Builders/W. Laramee
Igb
Test reports may not be reproduced without the express permission of Materials Testing,Inc Test reports must not be used to claim product endorsement by NVLAP or any agency of the
U S Government. Results only relate to items tested