Loading...
HomeMy WebLinkAbout20 Baker Lane (6)1\ Rd1% MATERIALS ESTING, INC. 0 i 200 ROWE AVENUE MILFORD, CONNECTICUT 06460 • (203)878-2765 IlIlIftWO" 871 STAFFORD ROAD EAGLEVILLE, CONNECTICUT 06268 (860)487-1972 NVLAP ACCREDITED DATE: 02-25-00 0320 REPORT NO: M-1002 CLIENT:Temple Beth Hillel AMBIENT TEMP: 40OF 101 Foster Street Ext. IV South Windsor, CT 06074 w 4 C`'O ;PIER: Light rain N a PROJECT: Temple Beth Hillel s r 20 Baker Lanet: 81 South Windsor, CT gti4'Q SUBJECT: CONCRETE PL ACFMENT INSPECTION 3 Concret Placement Locations: Continuous footing from 15-N to 7-C lines. Total Concrete Yardage This Date: 20 cubic yards @ 3000 PSI*. All reinforcing steel was properly placed in accordance with drawings: S-1, S-2 & S-3, dated 10-15-99. Cylind rs, slump and air content were performed and are as reported on Compression T st R sult Sheet. This report will follow when compression strength test results are known. Remarks: *Inspector could not stay for balance, arrived as scheduled for a 9:00 placement and was notified placement was changed to 11:00. Another inspection was scheduled in Farmington for 12:30-1:00. Site supervisor requested an inspection on placement of structural fill material in interior foundation areas. Material was placed in 8" lifts and was in the process of being compacted with a vibratory roller. A sample of material was taken for a sieve & proctor analysis. Materials Testing, Inc. Inspector, Richard Wright Frank A. Soucy 1 cc: Client 1 cc: Podojil Builders/R. Podojil 1 cc: Town of South Windsor 1 cc: Levin/Brown &Assoc., Inc. 1 cc: LPJ/Qodesh, Inc. 1 cc: Podojil Builders/W. Laramee kll Test reports may not be reproduced without the express permission of Materials Testing,Inc. Test reports must not be used toclaim product endorsement by M/LAP orany agencyof the U.S.Government. Results only relate to Items tested. A/'0M4%1 Rd - MATERIALS TESTING, INC 200 ROWE AVENUE a MILFORD, CONNECTICUT 06460 • (203)878-2765 871 STAFFORD ROAD EAGLEVILLE, CONNECTICUT 06268 a (860)487-1972 NVLAP ACCREDITED DATE: 04-17-00 0320 REPORT NO: M-1008 CLIENT:Temple Beth Hillel AMBIENT TEMP: 560F 101 Foster Street Ext. 00%C111fr1''11i1d South Windsor, CT 06074 p , M Ao,,,• '' Partly cloudy QL , E PROJECT: Temple Beth Hillel qr 20 Baker Lane South Windsor, CT SUBJECT: CONCRETE PLACEMENT INSPECTION ssr"` 1111r t Concr to Placement Locations: A to R line, 1 to 19 line, slab on grade. Line J.1 & 5.1 columns; J.1 & 5.2 columns; J.1 & 5.3 columns. Total Concrete Yardage This Date: 230 cubic yards @ 3500 PSI All reinforcing steel was properly placed in accordance with drawings: S-1, dated 10-15-99. Cylinders, slump and air content were performed and are as reported on Compression Test Re ult Sheet. This report will follow when compression strength test results are known. R marks: None Materials Testing, Inc. Inspector, Bi I Pinheiro 14 Frank A. Soucy 1 cc Client 1 cc Podojil Builders/R. Podojil 1 cc Town of South Windsor 1 cc Levin/Brown &Associates, Inc. 1 cc LPJ/Qodesh, Inc. 1 cc Podojil Builders/W. Laramee Igb Test reports may not be reproduced without the express permission of Materials Testing,Inc Test reports must not be used to claim product endorsement by NVLAP or any agency of the U S Government. Results only relate to items tested