HomeMy WebLinkAbout19 Long Hill RoadApplication No. 4.9.9............... Pernik
TO THE BUILDING INSPVCTOIC '
of the
TOWN OF SOUTH WINDSOR, CONN.
hereby make application for a permit to (erect) (make alteration to) a building according
to the following detailed statement of the specifications and plans herewith submitted. (Draw a line through
word "erect" or words "make alteration to" as the case may require.)
All provisions of the Building By-Laws (Sections 2 to 32 inclusive) shall be complied with in the execu-
tion of this work whether specified herein or not.
South Windsor, Conn., .......................................................... 19..........
7...Signhere ..................... ...... ... ........... ......................................................
Address
Location? ..L...p...l.Y...6......f_I A:.4............... '1... ............................side of? .V..............................................................................................................
NBarest.dross-street? ........e 1 .s,, ....,1.f .r.. ......................Star No, ..................................,. ................. Lot No.,
Ownerof land is? ......r,/..`i'.......9..zY..&......k........Relt'rgl.V....Address ........................................................................................................................
Ownerof building is? ...................................................................................Address ..................................:.....................................................................................
Architectis? ............................................................................................................Address ........................................................................................................................
Builderis? ............................................
Dimensions of building? .............................. feet front? . ...................... Feet rear? ................................. Feet deep? ................................
Extreme height to highest point of roof? .................. ....... ... .................. ............. No. of stories in height? ................ .................
Purposeof building is? .................................................................................No. of stores? .........................................................................................................
Howmany families? .......................................................................................No. of rooms? ....................................................................................................
Distancefrom street line is? .................................................................from building line is? ..................................................................................
ADDITIONS AND ALTERATIONS
Give Brief Description)
c. .. ...1 ............ .,r ....T... ........ 6.A................1......N.......... a.11........... ..k.. '. r :.e4.............:..............
r ............. src.... . .................n' . Q...a..........., .; ". .....
C
Y... . 1. ..........................................................
MapNo. ...........................
c
If of steel frame, what is exterior construction.? ...............................................................................................................................................................
What kind of columns used? ............. .............. ...........................Size of columns used? ... .......................................................................
What length of columns used? ... .....................................................How protected? ..... ............ ......... ...............................................................
What kind of beams or girders? ........................................................Size of beams or girders? .........................................................................
Longest span of beams or girders? .....................................................These rest on? .............. .............................. .................................................
Roof construction is? .....................................................................................Roof covering is? ........ .............. ............................................................
The floors are of ...... construction and are calculated to carry a safe load of ..............................
lbs. per square foot.
See Section 14, Building By-Laws.)
BRICK CONSTRUCTION.
Of what material will walls be constructed? ..........................................................................................................................................................................
Compositionof mortar? .................................................................................................................................................................................................. ............... .
Height and Thickness of Walls
Height Stories Front Walls Side Walls Rear Walls Partition Walls
Basement,
1st Story,
I............................
2nd "
I.............. ... . ............................ ... .. ....... ........................................................................
3rd
4th 19
I..............................
5th Is
6th 'd
I............ ............ . ..................................................
7th 41
8th
9th 41
I. .........................
10th " I I I I
Materialof Front? ................. .............. ... .. ..........................................If stone, what kind? ...... ...... .................................................................
Thicknessof Ashlar? .......................................................................................Thickness of Backing? ...............................................................................
Backed up with what? ....................................................................................Arches or lintels over openings? ...... .................................................
i
WOOD CONSTRUCTION.
Clive Size, Longest Span and Distance Between Centres, of Joists, Girders and Columns
JOISTS GIRDERS COLUMNS
Floors Size Longest Span Centres Bridging Size Longest Span Centres Size Length Centres
1st Floor
I......... ................ .................................... ................... ............................................ ....................
2nd "
3rd "
4th..........
Size of outside studs? ...` ..x....` ................. Distance on centres? .........1.h.......0 yjl-.: Size of sill? ..........X....... k.......................
Size of rafters? - x Distance on centres?6 Size of plate? ........
Size;of ledgers or gins? .................................................................................Size of deck rafters? ...........................I....................... ...............................
Distance on centres? ................................................................................. Size of studs in bearing partitions. ...................:...............................
MISCELLANEOUS
Style of roof, flat, pitch, Mansard, or hipped? ................................................................... Fireplaces? ............................................................
Material of Cornice?Material of roof covering? ........................................................................ 1.................................
Howis building heated? ..............................................................................Lining of flues? .................................... , .................... .... ............................
Thickness of shell of flues? .....................................................................Any elevators or lifts? .................................................................................
Whatkind? .........................................................How many? ........................................................ Any hoistways? .........................................................
How protected? ...................................................................................................How much will building cost? 2-......... ... ..`......v'o.........
Whenwill work be commenced? .........................................................................................................................................................................................................
EAST HARTFORD GAZETTZ NO. 140
2239
BUILDING APPLICATION
Application No. 249.9........................................................
on the ... . .......... W.e..,9.t......... .... . ........ . .. . .. side of
qr w.......l.........Roa d........................ .il Street.
StreetNo. . . ............................... .. ........... .........
Owner .. FrPx-, k L. Burton
Applicant .. Sarte.......... ..................
CLASSIFICATION
al-t-er.&U..ons, -ax--d—demo.lish...she d
Permit issued on above Application.
Date, ..... ........AP-rl.1... ......
TOWN OF SOUTH WINDSOR
BUILDING PERMIT
Date Apri 1 28 19 58
Fee Paid $......12.:.00 ,t\ Est. Value y$ 2.x 500
Permit N 9 2239
on the We s t side of
Long Hill Road Street
Street No. /
C/
i
Owner Frank L.Bur to n
Applicant Same
CERTIFICATE OF OCCUPANCY ISSUED:
Date
No.
Fee Paid $
CLASSIFICATION
build bath room in place of veranda
put in new windows, put on new
siding &. demolish barn 16' x 161
BUILDING PERMIT
N 2239
OFFICE OF
THE BUILDING INSPECTOR
of the
Town of South Windsor, Conn.
South Windsor, Conn. April 28_ 1958
C14is to to Trrtif1j, That Frank r gu..*m
is hereby granted permission to ' hu l ld bath rnnm in p1&Cs Of Ver&nAlLs pUt—ice- e
window®, put on now Siding & dozoligh bawl 16' z 16
at estimated value of $ Q
on the We et side of LnM Hill_RAitd Street on land
owned by Fr ILIA L. Burton
Said Work to be as described in Application
No. 21L99 and to conform to specifications and plans filed with said Application, and Building By-
Laws of THE TOWN OF SOUTH WINDSOR-
Issued April 1958
Building Inspector.
Streets and sidewalks, obstructed by excavations or building materials, must be guarded by barriers dur-
ing the day and by both barriers and colored lights by night.
SECTION 1343, GENERAL STATUTES OF CONNECTICUT: "When any person shall place
or keep building materials, or any obstacle in any highway (or any sidewalk) either with or without a license
therefor from the city or borough in which such highway may be situated, he shall pay said city, town or
borough all costs and damages which it shall sustain, or be compelled to reason therefor."
PERMIT /
DEPARTMENT DECISION APPLICATION FOR ELECTRICAL PERMIT
Application is hereby:
f ' TOWN Off' SOUTH WINDSORAPPROVEDSBUILDINGINSPECTIONDEPT.
Nelk 644—2511 Ext. 230SFIN
Date Building Iuspect Applications must be printed or typed.
1. LOCATION OF JOB
FEE SCHEDULE No. Street
Floor Apt. No.
0 — $19000 — 10.00
Over $1,000 - 10.00
2. OWl ER C/ZS A y z
per $1,000 or
3. ADDRESSfractionthereof
4. APPtI CANT y/-_.'
5. ADDRESS f-,0 ,® ' AQ
ACTUAL COST $ FEE $ 6. ESTIMATED COST S ,S Al'-w _ ap
ESTIMATED COST $fd4Aa,.Q0 FEE S iy. 7. IS THIS A CONTRACT COST? q1 YES Q NO
FILE CO*P. BY BALANCE $ 8. FEE ENCLOSED $
9. RE OF BUILDING:
RESIDENTTAT. C1 COPMRCIAL
10. TYPE OF JOR:
OXIG INW, ALTERATIONC3INSTAI.T.ATTON MADDITION
REPAIR
APPLICATION FOR ELECTRICAL. REPA1T(Continued tcom cKeverse Side)
11. LOCAnom OZ JOB_ 9 G ti N G 1+ 1 L
NO. STREET FLOOR APT. N0.
12. TYPE 07 INSTALLATION_- y_
13. SIZE OF MAIN FEEDER 92A11 p
14. NO. OF LIGHT LOOPS 15. NO. OF HEAT LOOPS, 16. NO. OF POWER LOOPS
17. NO. OF LIGHT OUTLETS 18. NO. OF HEAT CIRCUITS 19. NO. OF POWER u'u"f XI'S
20. NO. OF CONVENIENCE OUTLETS 21. NO. OF HEAT CIRCUITS 22. NO. OF POWER CIRCUITS
23, NO. OF LIGHT CIRCUITS 24. SIZE OF HEAT CIRCUITS 25. NO. OF MAYORS
26. NO. OF PANELS 27. TOTAL WATTAGE 29. NO. Or POWER PAILS
29. NO. OF SWITCHES 30. A/C LOAD 31. SIZS OF PCF#MR FEEDERS
32. NO. OF FIXTURES 33. TOTAL HORSEPOWER
34, NAMES OF SUBCONTRACTORS AND THEIR TRADES
35, REMARKS AND FURTHER DETAILS:
b S 6 G f v o h
O O^ ^
LICENSE!NO. SIGNA!KE OY APPLICANT DATE
PHONE DER: 2 ---1`'
j3ectric# APPLICATION FOR BUILDING PERMIT
Plumbing#19 TOM HAIL ROPED
HVAC # Date:
Sprinkler# No. 26571
FINAL APPROVALS Estimated Cost
Building to 2 ,9g COMPLETE RED BOXED AREAS Permit Fee C to
Engineering TYPE OR PRINT ONLY Occupancy Fee
Affidavit SIGN ON REVERSE SIDE
Appr.for CO. G ftb2--&1904MEMCTotalFee31
TO BUILDING DEPARTMENT,TOWN OF SOUTH WINDSOR,CT Additional Cosh
The undersigned hereby applies to do work according to the following specifications:
fob Location917Lot No. Side of street Zone
r -,avloo TeL#Applicant
Address C Zip Lic
Owner q Address 1 G•a A
Architect Address
Sq. Ft.New Area: Ist FI. 2nd FI. 3rd FL Total New Area
Rooms Lavatories Bathrooms Garages
Pur ikposofthispermit: i IV>C S
Mud Q
City Water Well Septic System Sewer
Ins. H.O. S.P. Cert. Area Basement Garage
Approved 6y Jec- Date (()If#qlUse Group Construction Type
Revised 1/97
I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of
South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this
permit is asked,and agree that this building is to be located the proper distance from all street lines,side yard lines,and required
distances from all other zones and is located in whic is building and its is allowed.
Signed
I hereby apply for a Certificate of Occupancy for the work described in this application for the permit.
Signed
DO NOT WRITE BELOW THIS LINE
INSPECTION COMMENTS
Inspection / Approval Date By Appl
Code Description Due Whom Code Comment
99-26571-B 2,000
B05 FIREPLACE/CHIMNEY 10/19/99 DCJ A FLUE INSP., ROOF NOT PENETRATED YET
B10 FINAL 10/25/99 DCJ A APPROVED FOR C OF U & CLOSEOUT