Loading...
HomeMy WebLinkAbout18 Castlewood Drive (7)1 DEPARTMENT DECISION APPLICATION FOR HVAC PERMIT TOWN OF SOUTH WIl TDSOR PERMIT# Application is hereby: SUBUILDINGDEPARTMENT APPRO 1540 SULLIVAN AVENUE Bldg.Permit# uu-' 644-2511 ext. 230 g ate I Building Inspector j Application must be printed or typed FEE SCHEDULE Location of Job: 0-$1,000=$15.00 Street No. Street Lot No. Over$1,000= 15.00 per$1,000 I or any fraction thereof Tenant Designation Apt.No. i 9 I APPLICANT 2 C kckC C r APPLICANT ADDRESS APPLICANT PHONE# L J 0W N s F OWNER rq OWNER ADDRESS b i Qj OWNER PHONE rzklmayRUq C a ESTIMATED COST$ Sc IS THIS A CONTRACT COST? Yes No FEE ENCLOSED$ n TYPE OF JOB: SpR.CO New Installation Alteration/Addition/Repair Revised 4/01//2002 APPLICATION FOR HVAC PERMIT (Continued from reverse side) TYPE OF SYSTEM: TYPE OF UILDING: HEATING KRESIDENTIAL C tOMMERCIAL VENTILATION INDUSTRIAL HEATING STEAM LOW PRESSURE LIMIT LBS. HIGH PRESSURE LIMIT LBS. tlYDRONIC WARM AIR UNIT RADIANT HEATER STING RADIATION ADDITIONAL RADIATION TOTAL RADIATION DESIGN TEMP. OUTSIDE OF INSIDE OF DIFFERENCE OF TOTAL HEAT LOSS(BTUH) F(HEAT LOSS SHEET MUST ACCOMPANY APPLICATION) DESCRIBE ALL HEATING EQUIPMENT(INCLUDING MAKE&MODEL NO.) x-9 f`cD< \Nt,.r (-) GROSS HEATING CAPACITY(INPUT—BTUH) NET RATING(OUTPUT—BTUH) TYPE OF FUEL OIL—GPM OIL TANK LOCATION:INSIDE OUTSIDE CAPACITY GAS—INPUT LPG TANK CAPACITY ELECTRIC—KW AIR CONDITIONING DESIGN TEMP.OUTSIDE OF INSIDE OF DIFFERENCE OF TOTAL HEAT GAIN(BTUH) HEAT GAIN SHEET MUST ACCOMPANY APPLICATION) DESCRIBE ALL COOLING EQUIPMENT(INCLUDING MAKE&MODEL NO.) TONNAGE COOLING CAPACITY(BTUH) VENTILATION DESCRIBE ALL AIR HANDLING EQUIPMENT(INCLUDING KITCHEN EXHAUST EQUIPMENT) TOTAL SIZE OF SYSTEM(CFM) FRESH AIR INTAKE(CFM) PLANS MUST ACCOMPANY APPLICATION) FURTHER DESCRIPTION OF WORK THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFORMANCE OF SUCH WORK. o 32--- S 3 - 3 CONTRACTORS LICENSE NO. TYPE STATE SIGNATURE OF APPLICANT o , e DATE `-1 2 Z.. APR—2 S—0 2 1 2 : 1 5 P M R L I M R T O N AND H I L-L S 8 6 0 2 4 S 2 M 0 6 R. 0 1 IGHT LOAD AND EQUIPMENT UMMARY Entire Hous IMPERIAL PLUMSING yI,'For- LJMOTHOMESLA% CQ-))fW;j Not"S. i Weather: Windsor Locks,Bradley Fld,CT, US j Winter Design ConditionsOR OF summer Design Conditions 70 °F 0%4gi dbb rOutsidedb Inside db 82 'F Design TO 13 OF Design TD p y rip R**'1= umidlty Moisture difference 22 gr/lb ui Heating Summary Sensible Cooling Equipment load [zing Building heat loss 91385 Btuh Stricture 0 Stuh tuhVentilationair0cfmVentiloWn0 Fr?` Ven#ilation air loss 0 gtoh Qesfpn temperature swing 3.0 O De ign heat load 91385 Stuh UM mt0p.dote n Rato/ovAng multiplier 0.93 Infiltration Total sens.equip. load 0 Stuh Methodaatnuction quality Average Latent Cooling Equipment Load Sizing Fireplaces 1 Internal gains 0 Btuh V Ietlon toh Heath Coolln Inlfltration tuh r 3 Total latent equip. toed O Btuh r4 V ume me) 288488 0 Air chonges/hour 0.9 0.5 Total equipment load 0 Stuh Equiv. AVF(cfm)404 O Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Efficiency 80.0 AFUE fficigncy 0.0 EER 0 BtuhHeatingnput0Btuhrisiblecooling H ati output 0 Btuh Latent cooling 0 Stuh R OW output baseboard 550 ggtuhMI Total cooli 0 Btuh Total low baseboard lee ft Actual opolift tan 0 elm Hioh oMut baseboard 800 Btuh/ft Clg air flow factor 0.000 efm/Btuh TOt al h o baNbrd 114 ft Space thermostat Load senslble heat ratio 0 % Printout certified by ACCA to meet all requirements of Manuel J 7th Ed. ww OQ"1:wwc3Pfft RIph1-Buft R081~0611"'5.0.38 RSRRL)02W 7 2002-Apr-26 11,0:03 C:W1y 0ocumsrr1x Ruud\BASE 1.r:r P"s I w f4' vO rm1 t'S i