HomeMy WebLinkAbout179 Trumble LaneElectric#I&a L 3 APPLICATION FOR BUILDING PERMIT
Plumbing# 6 3 94 9,179 TRUMBULL LANE
HVAC #D "l mi-E Date: A&I92
No. 25939
Sprinkl r#
FINAL APPR VALS Estimated Cost $ -ZA o"
Building rLZ lN n& COMPLETE RED BOXED AREAS Permit Fee
Engineering k TYPE OR PRINT ONLY Occupancy Fee $ S
Affidavit 2 3 ? SIGN ON REVERSE SIDE
Appr.for CO. Z 3 4 N S Total Fee
TO BUILDW,I)PARTMBvf,TOWN OF SOUTH WINDSOR,Cr Additional Cost) $ —a—
The undersigned hereby applies to do work according to the following specifications:
Jo6 Location n iZ It Lo, ' Lot No. ! Side of Street Zone
Applicant rj s L- L Tel# gtO 2 0z)-(
Address 2-0 3 3 C-1 Zip 6-C 6 ZY Lic.#
Own r Address
Architect !Z Address
Sq.Ft.N w Area: 1st Fl. 2nd FL `I(o 3rd FL Total New Area '-c5Go>
Rooms Lavatories Bathrooms Garages S—
Purpose of this permit: AL0 L6t%A
City Water pL ell Septic System Sewer
Ins. H.O. S.P. Cert. Area :3&5 9 Basement 1 Garage 8-38
Approved by cS U—Date LfRf 5cl Use Group Construction Type 5-LS
Revised 1197
I h reby agree to conform to all the requirements ofthe Laws of the State of Connecticut and the Ordinances of the Town of
South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this
permit is asked,and agree that this building is to be I ted t proper ' tan m all street lines,side yard lines,and required
distances from all other zones and is located in whic t s b I ing and lowed.
Signed
I hereby apply for a Certificate of O nc for th rk i this application for the permit.
Signed
DON RITE BEL W THIS LINE
INSPECTION COMMENTS
Location of job AFFIDAVIT Additional Fee —0—
State of Connecticut
SS.
County of Hartford
of s2}S'C IG t4S actor for building eeccted under
Permit Na 25939 issued by the Dept of Building of the 7bwn of South Windsor being duly sworn,make oath
and say that the actual cost of the completed work authorized under said permit was$240 r 000.
00Si
vSubscribedandsworntobeforemethis . ... . .. ............. day of A.D.19
EsGmate Cost:t 240 r 000.00
0Difference: t otary Public
v
Inspection / Approval Date By Appl
Code Description Due Whom Code Comment
99-25939-B 218,000
B01 FOOTING 04/09/99 JFF A WITH CONTRACTOR
B02 FOUNDATION 04/19/99 DCJ A
B03 FRAMING (ROUGH) 05/17/99 DCJ A
E03 ROUGH 05/17/99 DCJ A
E01 SERVICE 05/17/99 DCJ A RELEASED TO N.U.
P03 ROUGH 05/17/99 DCJ A
H03 ROUGH 05/17/99 DCJ A
B04 INSULATION 05/19/99 DCJ A HEAT DUCT TO BE DRAFT STOPPED
PO4 GAS TEST 05/20/99 DCJ A LEFT STICKER
PO4 GAS TEST 05/21/99 DCJ A LEFT STICKER
99-10478-H 9,000
99-10384-P 8,000
99-16263-E 5,000
Total Est Value 240,000
Dwelling 3,659 149,726.28
Basement 1,574 19,517.60
Garage 838 10,391.20
Smoke Det 7 525.00
BOCA Value 203,580.89
Difference 36,419.11)
SITE COMPLIANCE CHECKLIST
TOWN of SOUTH WINDSOR, CONNEC.TICUT
179 TRUMBULL LANE LOT_#26 Reviewed By J. Fe A eering)
CHASE ORCHARDS LLC Date Reviewed of Apprftft-oved enied
2033 ELLINGTON ROAD,SOUTH WINDSOR,CT_ Reviewed By anning)
BP_#_25939_ Ph_#_(860) 648-2006 Date Reviewe -7 pproveDenied
Date Submitted 04/06/99 FO C of O **
As required in the Zoning and/or Subdivison Regulations, no Certificate of
Occupancy shall be issued until grading plans have been complied with and
approved by the Town Engineer. The minimum requirements shall include:
Approved Denied N/A
1. Approved building permit plan
2. Finish grading per approved
building permit plan
3. Site work; i.e. trees, shrubs,
dumpsters, required parking
4. Utility location;
a. sanitary sewer/septic system
b. foundation drain
C. electrical & telephone
d. water
y e. other Cc'As
UZ 5. Sewer connection charge paid Ljjkpjl1
6. Appropriate certification
7. Bonding
8. Planning & Zoning/
Inland Wetlands Considerations
Sewer Permit No. 0 I
Pavement Excavation No.
COMMENTS:
C,(y -OU-C Or - IA STAW> 'V- - SSW. UA-T.
Gt,s Zo 7/ 9r*Gk .oN APE, A•.x> s-•I T R.ci +
d'
l!= - r (on c.QwtiG(Z Q tvl (fsC t D v4 PA fL RECCE'
FRosi a outs . rJUL 2 11999
mmwam v
ENG.DEPT.
SITE COMPLIANCE CHECKLIST
TOWN of SOUTH WINDSOR, CONNECTICUT
179 TRUMBULL LANE LOT_#26 Reviewed By -:5• ?SgQA En ineering)
CHASE ORCHARDS LLC Date Reviewed Approved enied
2033 ELLINGTON ROAD,SOUTH WINDSOR,CT_ Reviewed By anning)
BP_#_25939 Ph_##_(860) 648-2006 Date Review Approv /Denied
Date Submitted 04/06/99 FOR BUI ING PE
In accordance with the Zoning and/or Subdivision Regulations, prior to the
building of any structure on a lot, a Topographic Plot Plan shall be submitted
for approval. The minimum requirements shall include:
r
Approved Denied N/A
1. Name, address & phone number of owner/applicant
2. Name, address & phone number of plan preparer
3. Zoning Information - i.e. zone, open space,
floodway, etc.
4. Plot Plan at 1" = X' scale
tz a. Subdivision reference, abutting properties, etc
b. Easements of record
c. Lot description, bearings, building lines,
distances, area, etc.
d. Contours, existing & proposed, 1 or 2 ft.
interval where appropriate
e. Building location with dimensions.
Elevations of proposed finish floor, garage
floor & centerline of road at driveway
f. Elevations of gravity drainage systems, sanitary
foundation drain at the house and the street
g. Tentative utility location (gas, water,
electric, septic system, etc.)
h. Title block with name and address of preparer,
date, appropriate certification, live seal and live
signature consistent with the Board of Registration
requirements. (P.E. & L.S.)
5. Sedimentation and erosion control
6. Special Planning & Zoning, Inland/Wetlands
considerations (Plans on file w/Town Clerk)
COMMENTS
11 12
L----ATc1> .J pWvE-"n 1
MA =aEZtJI CAN'T 1K 1o1 -t •'''ciL .
t
d
APR 61999 w
cp smwmw
PEZDEPARTMENTDECISIONAPPLICATIONFORELECTRICALPERMITA'(,3
Application is hereby: TOWN of SOUTH WINDSOR
BUILDING DEPARTMENT Bldg PerMit#
31540SULLIVANAVENUE
1 ,
911
APPROVE 644-2511 ext.230
11
ale IdingLUnspectorgn Application must be printed or typed
Location ofjob
zz
Street No. Street Lot No.
FEE SCHEDULE
Floor Apt.No.
0 - $1,000 - $12.00 Fo
Over $1,000
12.00 per$1,000 OWNER 575 6
r any fraction thereofF0, ADDRESS dd33 Ci/2 f 1
OWNERS PHONE
APPLICANT
ADDRESS<
a/ arc/
ESTIMATED COST e!5 Cf6
C ;,:
0
IS THIS A CONTRACT COST?
YES NO
FEE ENCLOSED $
OR Cow7 OF JOB:
Original Installation
Alteration/Addition Repair
Revised 11/95
APPLICATION FOR ELECTRICAL PERMIT(Continued from reverse side)
TYPE OF BUILDING
IS THIS APPLICATION ASSOCIATED WITH A
RESIDENTIAL BUILDING PERMIT APPLICATION NO
BUSINESS
ASSEMBLY CURRENT USE AND OCCUPANCY
MERCANTILE
EDUCATIONAL FUTURE USE AND OCCUPANCY
INSTITUTIONAL
FACTORY
STORAGE ENGINEER'S NAME PHONE
GARAGE
MIXED USE ADDRESS
CITY STATE ZIP
Other please specify)
TYPE OF INSTALLATION/WRUNG METHOD `"1 LC /'rn c
SIZE OF MAIN FEEDERS AND RATING OF WIRE USED
NUMBER OF METERS_ NUMBER OF DISCONNECTS AND RATINGS L C&
NUMBER OF PANELS_ REMOTE DISCONNECT REQUIRED?YES NO
NUMBER OF LIGHT CIRCUITS AR NUMBER OF POWER CIRCUITS
NUMBER OF SWITCHES NUMBER OF OUTLETS
NUMBER OF LIGHT FIXTURES S C
NUMBER OF HEAT CIRCUITS NUMBER OF A/C CIRCUITS
SEPERATE HEAT LOSS AND A/C CALCULATIONS MUST BE SUBMITTED.
DESCRIPTION OF WORK
THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS
TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONN.BUILDING CODES IN THE
PERFORMANCE OF SUCH WORK.
NAME STATE LICENSE NO. TYPE JIGNATURE OF APP ICANT
PHONE NO. DATE
NMI fry
INSPECTOR \ cC7 DATE TIME wn
LOCATION
1Z
INSPECTION: CODE: RESULT(D/A) :
5—i3? / 5o3BUILDING:
jECT
PLUMBING:
A
HVAC: i4 o 3
J
OTHER:
i
DEPARTMENT DECISION gAPPLICATIONFORPLUMBINGPERMIT
Application is hereby:TOWN of SOUTH WINDSOR
BUILDING DEPARTMENT Bldg Permit
APPRO 1540 SULLIVAN AVENUE
W4 d4q—
644-2511 ext. 230
6E
Date Building Inspector Application must be printed or typed
Location ofjob
1 79 TRIIMBI-11-1, T-ANE 96
Street No. Street Lot No.
FEE SCHEDULEF] Floor Apt.No.
0 - $1,000 - $12.00
Over $1,000
12.00 per$1,000
F
or any fraction thereof
OWNER mAsp, ASSOCIATES, TNC,
ADDRESS 20-,1--i PT,r,TNc-,ToN ROADLSQT"H WINDSORx r-T 06074
OWNERS PHONE# 860 648-2006
APPLICANT FRANK mAiTRT
OADDRESS 2q RTS.RPT.T. STREET
EAST HARTEMDO Or 06108
tjj ESTMIATED COST$
0
IS THIS A CONTRACT COST? x
YES NO
j wC FEE ENCLOSED
OR•Co TYPE OF JOB:
Original Installation
Alteration/Addition Repair
Revised 10/96
APPLICATION FOR PLUMBING PERMIT(Continued from reverse side)
TYPE OF BUILDING IS THIS APPLICATION ASSOCIATED WITH A
BUILDING PERMIT APPLICATION YES / NO
RESIDENTIAL
BUSINESS CURRENT USE AND OCCUPANCYASSEMBLY
MERCANTILE FUTURE USE AND OCCUPANCY SINGLE DWELLINGEDUCATIONAL
INSTITUTION
FACTORY ENGINEER'S NAME PHONE
STORAGE
GARAGE ADDRESS
MIXED USE
CITY STATE ZIP
Other please specify)
TYPE OF INSTALLATION ORIGINAL SIZE OF MAIN DRAIN 41,
NO. OF TOILETS 4 STYLE SIPHON NO. OF URINALS STYLE
NO. OF BATHTUBS_3 NO. OF SHOWERS 1` NO. OF LAVATORIES6
NO. OF CONDUCTORS SIZE NO. OF STACKS_SIZE
AREA OF ROOF NO. OF CATCH BASINS NO. OF FLOOR DRAINS
NO. OF OTHER FIXTURES_ 1 KIND WHIRLPOOL
ARE TOILET COMPARTMENTS VENTILATED TO OUTER AIR BY A WINDOW YES/I
SIZE OF WINDOW3 X 3 IF NONE C.F.M. OF VENTILATOR
SIZE OF DUCTS SEWER OR SEPTIC TANK
SIZE OF WATER MAIN SIZE OF WATER PIPING&RISER /4 1/2
WATER HEATER
TYPE MANUFACTURE AMERICAN
TANKS SAFETY DEVICES
TEMPERATURE
CAPACITY SC) RELIEF VALVE I C)nXL
TEST PRESSURE m WORKING PRESSURE i rn PRESSURE RELIEF VALVE I GnxT.
TYPE MANUFACTURER
DESCRIPTION OF WORK
COMPLETE PT.TTMRINC, FM NEW SING--E FAMITY
THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS
TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONN.BUILDING CODES IN THE
PERFORMANCE OF SUCH WO .
L &A,t
NAME STATE LICENSE NO. TYPE SIG OF APPLICANT
PHONE N0289-9511 DATE 3 1
PEDEPARTMENTDECISIONAPPLICATIONFORHVACPERMIT14
Application is hereby:TOWN of SOUTH WINDSOR
BUILDING DEPARTMENT Bldg Pe #
APPROVED 1540 SULLIVAN AVENUE a
644-2511 ext.230
Date Building Inspector
Application must be printed or typed
Loca 'on ofjob
Street No. Street Lot No.
FEE SCHEDULE
Floor Apt.No.
0 - $1,000 - $12.00
Over $1,000
12.00 per$1,000 OWNER S d
or any fraction thereof
ADDRESS Gd G T- Cl 2 —
OWNERS PHONE# y "- A D
i
a
APPLICANT S' /O Ile
OWN $t ADDRESS
8P1 C'- o G=L U
Uj ESTIMATED COST $ D O 6
IS THIS A CONTRACT COST?
S NO
FEE ENCLOSED $ y
SOR Cow TYPE OF JOB:
Original Installation
3
Alteration/Addition/Repair
Revised 11/95
APPLICATION FOR HVAC PERMIT(Continued from reverse side)
TYPE OF SYSTEM TYPE OF BUILDING
HEATING RESIDENTIAL
A/C C_ COMMERCIAL
VENTILATION INDUSTRIAL
HEATING
STEAM LOW PRESSURE LIMIT LBS.HIGH PRESSURE LIMIT LBS.
HYDRONIC WARM AIR UNIT RADIANT HEATER
EXISTING RADIATION ADDITIONAL RADIATION TOTAL RADIATION
DESIGN TEMP. OUTSIDE_f F INSIDE 7,,7-F DIFFERENCE-7-7- F
TOTAL HEAT LOSS(BTUH)
HEAT LOSS SHEET MUST ACCOMPANY APPLICATION)
DESCRIBE ALL HEATING EQUIPMENT (INCLUDING MAKE&MODEL NO.)
GROSS HEATING CAPACITY (INPUT-BTUHY o.a NET RATING (OUTPUT-BTUH)/SO 0 O
TYPE OF FUEL
OIL-GPM GAS-INPUII33 Od 0 ELECTRIC-KW
OIL TANK SIZE&LOCATION
INSIDE OUTSIDE CAPACITY LPG TANK CAPACITY
AIR CONDITIONING C
DESIGN TEMP. OUTSIDE,F INSIDU e F DIFFERENCV
TOTAL HEAT GAIN(BTUH) Me o 0
HEAT GAIN SHEET MUST ACCOMPANY APPLICATION)
DESCRIBE ALL COOLING EQUIPMENT (INCLUDING MAKE&MODEL NO.)
TONNAGE_ COOLING CAPACITY(BTUH) v
VENTILATION
DESCRIBE ALL AIR HANDLING EQUIPMENT(INCLUDING KITCHEN EXHAUST EQUIPMENT)
TOTAL SIZE OF SYSTEM(CFMOd FRESH AIR INTAKE(CFM) c
PLANS MUST ACCOMPANY APPLICATION)
FURTHER DESCRIPTION OF WORK
THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO
COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONN. BUILDING CODES IN THE
PERFORMANCE OF SUCH WORK.
0 5e- P-/
STATE LICENSE-NO. NAME&TYPE l OFIGNAAPPLICANT
PHONE NO. a2 y S) ,fS&
1 '
l
ennox Objective Guide to S nstal lati on Comparison
LOGIC Software Group
Lennox Indus,tri es Inc .
Dallas , TX
1 -800-527 --3506
Y y`...,,^epp26.'!^',`.;.; Ly,". ;" ,,I ,
l ..r v 'ivy ix°•'•''.; t,rrEy,.x•n'nlea rs•;- =i" , `y `' r,l';:r.fir, _ y„?', :', .....i f. ,; ,
hh'R..J.n 1. ,j..,•: rY:• 4 .:",
a."iy,. ,;':[L.. .,.•..F,_ _ v.
w`dies£,,. b ,4e Rye-,•y ` t
s-°t 0t06/..9.64 } L,OGI 1,OQ.1` 1 SIb+ENT n L` ,LOADS ANALYSIS PAGE 1
rv.'¢;lf.14 tip, tk'r`e•i?. wr .,;:..+.,,i.af[' p i.-wt'.n •';:+'.;_ Fu-.. .r, .
M f,.G" ik'" ,,;t x- Y}r "t" 'v'h s j"nf{' d..uq,+l.=.., o->5;;`r"'f,+•[l,.'f.. ,.i•'' j t 4„ •.'X',,.`j Y;Y Cyr•', 'a ' l i .. ,`,fo-".., i,;'
t k '" 1 o T '
PREPARED .,FOR,* DORAN ,
PREPARED BY : LARRIE MEYER /' C . A. S .
FILE TITLE : DORAN2
DESIGN TEMPERATURE:: (DEGREES F )
MINTER INSIDE 72 WINTER OUTSIDE 0
SUMMER INSIDE 75 SUMMER OUTSIDE 90
DAILY TEMPERATURE RANGE , INDICATOR M
DESIGN GRAINS RELATIVE HUMIDITY, 42
DEGREES NORTH LATITUDE 41
SUMMER AIR CHANGES PER HOUR 1 . 0
WINTER AIR CHANGES PER HOUR 0 . 7
AREA BTUH BTUH
SQ FT LOSS GAIN
ROOM 1 FAMILY ROOM IN ZONE -I 19 X 17
WALL 12j3 R- 19 + 1/2 OR 3/4 .INCH EXTR POLY 107 385 100
WINDOW . 3A DOUBLE PANE CLR GLASS WOOD FRM FACING-N 45 11785 540
TINT-TINTED SHADING-DRAPES HALF DRAWN
SHADING COEFFICIENT = 1
WALL 1 2'.J:3 R-- 19 + 1/2 OR 3/4 INCH EXTR POLY 136 490 126
OVERHANG = 1 . 0
FLOOR 19A HARDWOOD OR VINYL FLOOR + NO INS 289 31246 0
WINTER INFILTRATION 31 CFM 21418
SUMMER INFILTRATION 44 CFM SENSIBLE GAIN 720
LATENT GAIN 11246 L
t
PEOPLE fi ' 'SENSIBLE GAIN 1 800
i 1r4 LATENT GAIN 1380 L '
e e r
r
b
DUCT LOSS MULT= . 10 GAIN MULT= . 10 832 329
TOTAL FOR ROOM 1 2 , 584 CU FT '" `.., - 23
SENSIBLE 9,.,156, .6.14
Iy.,,
71174
10/06/96 LOGIC.'1060*'`RESIDENTIAL LOADS ANALYSIS PAGE 2
WOODBRIDGE
LOT `#9
AREA BTUH BTUH
SQ FT LOSS GAIN
ROOM - 2 KITCHEN IN ZONE 1 26 X 13
WALL, 12J3 . R- 19 + 1 /2 OR 3/4 INCH EXTR POLY 163 587 152
OVERHANG = 1 . 0
DOOR 80 SLDNG DR , 2 PN CLR GLASS 'METAL FACING-N 36 11879 396
TINT-TINTED SHADING-DRAPES OR BLINDS
SHADING COEFFICIENT = 1
WINDOW 3A DOUBLE PANE CLR GLASS WOOD FRM FACING-N 9 357 108
TINT-TINTED , SHADING--DRAPES HALF (RAWN
SHADING COEFFICIENT = 1 REVEAL = 1 . 0
FLOOR 19A HARDWOOD OR ' VINYL FLOOR + NO INS 338 31796 0
LINTER INFILTRATION' 31 CFM 21418
SUMMER INFILTRATION 44 CFM SENSIBLE GAIN 720
LATENT GAIN 11246 L
MECHANICAL VENTILATION 50 . 0 CFM 31960 825
PEOPLE 6 SENSIBLE GAIN 1800
LATENT GAIN 1380 L
APPLIANCES 1200
DUCT LOSS MULT 10 GAIN MIJLT= . 10 11300 520
TOTAL FOR ROOM 2 21704 CU FT 338
SENSIBLE 141'297 51720
LATENT 41054 L
ROOM - 3 DINING ROOM IN ZONE 1 13' X 15
FALL 12'J3 R- 19 + 1/2 OR 3/4 INCH EXTR POLY 8G 310 80
OVERHANG = 1 . 0
tA1INDOW 3A DOUBLE PANE. CLR GLASS WOOD FRM FACING-N 18 714 216
TINT-TINTED SHADING-DRAPES HALF DRAWN
SHADING COEFFICIENT w 1
WALL 12'J3 R- 19 + 1/2 OR 3/4 INCH' EXTR POLY 120 432 112
OVERHANG = 1 . 0
FLOOR 1 0A HARDWOOD OR VINYL, FLOOR + NO INS 195 2 , 100 0
WINTER INFIL0RATION 12 CFM ' 967
31.1MMER INFILTRATION 17 CFM SENSIBLE GAIP4 288
LATENT GAIN 498 L
r
PEOPLE 6 SENSIBLE GAIN 1800
LATENT GAIN 1380 L
APPLIANCES
x'
DIICWT L.OS S MULT ti . 1 0 GAIN MULT= . 1 Q 4'G'1 .; _,7 Q°
111
10/06/96 LOGIC 1000 'RESIDENTIAL 'LOADS ANALYSIS PAGE 3
WOODBRIDGE
LOT 49
AREA B,TUH B,TUH
SQ? FT LOSS GAIN
TOTAL FOR ROOM 3 1 1560 'CU FT 1 95
SENSIBLE 6 , 074 41065
LATENT 1 , 878 L
ROOM - 4 LIVING ROOM IN ZONE 1 14 X 13
WALL 1 2•.J3 R-19' + 1/2 OR 3/4 INCH EXTR POLY 82 295 76
OVERHANG. = 1 . 0
WINDOW 3A ' DOUBLE PANE CLR GLASS WOOD FRM FACING-S 30 11190 475
TINT-TINTED SHADING-DRAPES HALF DRAWN
SHADING COEFFICIENT = 1
WALL 12•-13 R- 19 + 1/2 nR 3/4 INCH EXTR POLY 120 432 112
0VE"HANG = 1 , 0
FLOOR 19A HARDWOOD OR VINYL FLOOR' + NO- INS 182 2 , 044 0
WINTER INFILTRATION 20 CFM 11612
SUMMER INFILTRATION 29 CFM SENSIBLE GAIN 480
LATENT GAIN 830 L
PEOPLE 6 SENSIBLE GAIN 1800
LATENT GAIN 1380 L
APPLIANCES 1200
DUCT LOSS MULT=z . 10 GAIN MULT= . 10 557 414
TOTAL FOR ROOM 4 11456 CU FT 182
SENSIBLE 61131 49557
LATENT 2 , 210 L
ROOM - 5 FOYER IN 70NE 8 X 20
WA,L l_ J ? R - 19 11 ;, CIF. 3/1+ 1 1i "XTF, !='I.Y 1 15 30
OVERHANG = 1 . 0
WINDOW A DOUBLE PANE CLR GLASS WOOD FRM FACING--3 14 555 238
TINT-TINTED SHADING-DRAPES HALF DRAWN
SHADING 'COEFFICIENT = 1
DOOR 10H PANEL' '& WOOD STORM 18 467 121
WINTER INFILVATION 22 CFM 1 , 7 19
SUMMER INFILTRATION 31 CFM SENSIBLE GAIN ' 512
LATENT GAIN 886 L
PEOPLE 2 SENSIBLE GAIN 600
LATENT GAIN 460 L
APPLIANCES a =fa`e. , 1°2`00,
DUCT LOSS MULTI- . 1 0 GAIN MULT= . .1 0 286 270 ,
F _i^ , .,.Y.• '}-., '_d,,T.l 11.,rta,p"-:n$:'"cs n ilc
i.,,. _
10/06/96 LOGIC 100(l 'RESIDENTIAL LOADS ANALYSIS PAGE 4
WOODB'RIDGE
1QT #•9
AREA BTUH - STUH
SQ FT LOSS.'GAIN
TOTAL FOR ROOM 5 11280 CU FT 160
SENSIBLE 31142 21970
LATENT 11346 L
ROOM — 6 DEN IN ZONE 1 11 X 13
MALL 1 2J 3 R— 1 9 + 1/2 OR 3/4 INCH EXTR POLY 58 209 54
OVERHANG = 1 . 0
WINDOW 3A DOUBLE PANE CLR GLASS WOOD FRM FACING—S 30 11190 475
TINT—TINTED SHADING—DRAPES HALF DRAWN
SHADING COEFFICIENT w 1
FLOOR 19A HARDWOOD OR VINYL FLOOR + NO INS 143 11606 0
WINTER INFILTRATION 20 CFM 11612
SUMMER INFILTRATION 29 CFM SENSIBLE GAIN 480
LATENT GAIN 830 L
PEOPLE 4 SENSIBLE GAIN 1200
LATENT GAIN 920 L
APPLIANCE.:E'_73, 1200
DUCT LOSS MULT- . 10 GAIN MULT= . 10 462 341
TOTAL FOR ROOM 6 1 , 144 CU FT 143
SENSIBLE 51079 39750
LATENT 19750 L
ROOM — 7 BATH IN ZONE 1 7 X 8
FLOOR 19A HARDWOOD OR. VINYL FLOOR + NO INS 56 629 0
WINTER INFILTRATION 0 CFM 0
SUMMER INFILTRATION 0 CFM SENSIBLE GAIN 0
LATENT GAIN 0 L
PEOPLE 1 SEN SIBLF GAIN 300
i LATENT GAIN 230 L •
DUCT LOSS MOLT= . 10 GAIN MULT= , 10 63 30
r
TOTAL FC)R ROOM 7 448 CU FT 56
SENSIBLE 692 330
LATENT'230 L:
ROOM — 6 M . B . R . IN ZONE 2 1'8 X 17
WALL"1.2 J 3 R 1,, + 1/2 CAR.. 3/4' INCH .x r a?:LY 9 9 ` 3 5`5 9 2
y, `, 7 t....:
Kw4 k`aiq;yd,•_"rs`"i-s{ `, t J "O Ws•. .!"li,-Y+""'"'"': Z'h-"+li,l7'^Rtr. '.l 'q
10/06/96 LOGIC 1,000 RESIDENTIAL LOADS ANALYSIS PAGE 5
WOODBRIDGE
LOT #9
AREA BTUH BTUH
SQ, FT LOSS GAIN
WINDOW 3A DOUBLE PANE CLR GLASS WOOD FRM FACING•-N 45 11785 540
TINT-TINTED' SHADINGI-QRAPES' HALF DRAWN
SHADING COEFFICIENT = 1
WALL 12J3 R'-;Ig + 1/2-,OR ' 3%4', lNCH` EXTR POLY 136 490 126
OVERHANG = 1 . 0
CEILING . 1.6.G ' ' DARK'' R-30 INSULATION 306 727 394
WINTER INFILTRATION 31 CFM 21418
SUMMER INFILTRATION 44 CFM SENSIBLE GAIN 720
LATENT GAIN 11246 L
PEOPLE 2 SENSIBLE GAIN 600
LA'FENT t;AIN• 460 L
DUCT LOSS MULT-- . 10 GAIN MULT= . 1 0 578 247
TOTAL FOR ROOM 8 21448 CU FT 306
SENSIBLE 61354 21719
LATENT 11706 L
ROOM -M . B-ATH IN ,.ZONE'. .2 .- :":,,, r , 1`9 ;X 9
Nit'.
WALL '` 12J3 R`1'9.>'+ °1/.2°' OR 4. INCH 5X'TR POLY 136 490 126
OV* '2 H fAN' R'= 1 . 0
t
WINDOW . . 3A . .'DOUZLS'q;PANE' C R., G°hASS WOOQ FRM FACING-N 16 635 192
TIf T.-TINTED'"'` SH'ADING-D PAP ES HALF DRAWN
WHAD"I' N'G'ACOEFFICIENT w 1
CFII.. ING 16G DARK . R-30 INSULATION 171 406 220
WINTER TNFTI-TRATION 11 CFM 950
SUMMER INFILTRATION 1'6 CFM SFN'SIE,I. F (-iATN 256
LA'FENT Q'iAIN 443 1
MECHANICAL \,'I.NTILATION 75 . 0 CFM 5 ; C340 1 , 2)36
PEOPLE 2 SENSIBLE GAIN 600
LATENT GAIN 460 L
DUCT LOSS MULT= . 10 GAIN MULT= . 10' 833 263
TOTAL FOR ROOM 9 11368 CU FT 171
SENSIBLE 91163 21895
LATENT 3 , 045 L
ROOM -- 10 B . R . 2 IN ZONE 2 20'`'`'X` 12 y
WALL 12J3 R- 19 + 1/2 OR 3/4 INCH EXTR POLY 130 68 { .'12 1':'
OVERHANG = 1 . 0
10/06/96 LOGIC 1000 RESIDENTIAL LOADS ANALYSIS PAGE 6
WOODBRIDGE
LOT #9
AREA BTUH BTUH
SQ -FT LOSS GAIN
WINDOW 3A DOUBLE PANE CLR GLASS WOOD FRM FACING-N 30 11190 360
TINT—TINTED` SHADING—DRAPES HALF DRAWN
SHADING COEFFICIENT w 1
WALL 1121J3 R--19 + 1/2 OR 3/4 INCH EXTR POLY 96 346 89
OVERHANG, = 110
C:EILIN I . 16G DARK R-30 INSULATION 240 570 309
WINTER INFILTRATION 20 CFM 11612
SUMMER INFILTRATION 29 CFM SENSIBLE GAIN 480
LATENT GAIN 830 L
PEOPLE 2 SENSIBLE GAIN 600
LATENT GAIN 460 L
DUCT LOSS MULT= : 10 GAIN MULT= . 10 419 196
TOTAL FOR ROOM 10 11920 CU FT 240
SENSIBLE 41604 21155
LATENT 19290 L
ROOM — 11 B . R . 3 IN ZONE 2 13 X 12
WALL 12,13 R- 19 +• 1/2 OR 3/4 INCH EXTR POLY 74 266 69
OVERHANG = 1 . 0
wINDt_JW 3A DOUBLE PANE CLR GLASS WOOD FRM FACING—S 30 1 , 190 475
TINT—TINTED SHADINGS—DRAPES HALF DRAWN
SHADING COEFFICIENT = 1
CEILING 16G DARK R-30 INSULATION 156 371 201
WINTER INFILTRATION 20 CFM 11612
SUMMER INFILTRATION 29 CFM SENSIBLE GAIN 460
LATENT GAIN 830 L
PEOPLE 2 SENSIBLE GAIN 600
LATENT GAIN 460 L
DUCT LOSS MUL:T= . 1 0 GAIN MULT= . .10 344 182
TOTAL FOR ROOM 11 1 , 248 Cl_I FT 156
SENSIBLE 31783 21007 .
LATENT 11290 L
r
ROOM — 12 B . R . 4 IN ZONE 2 11 x 13
WALL 12J3 R- 19 + 1/2 OR 3/4 INCH EXTR POLY 58 209." 54_
OVERHANG — 1 . 0
WINDOW 3A DOUBLE PANE CLR GLASS WOOD FRM FACING..S 80` ~
J
19 1`0
TINT—TINTED SHADING—DRAPES . HALF DRAWN t"
a
a
10/06/96 LOGIC 1000 RESIDENTIAL LOADS ANALYSIS PAGE 7
WOODBRIDGE
LOT #9
AREA BTUH B.TUH
SQ FT LOSS GAIN
SHADING COEFFICIENT 1
r
WALL 12J3 R- 19 + 1 /2 , OR 3/4 INCH EXTR POLY 48 173 45
OVERHANG = 1 . 0
CEILING 16G ,DARK R-30 INSULATION 143 340 184
WINTER INFILTRATION 20 CFM 1 , 612
SS-1-1MMFR INFILTRATION 29 CFM SENSIBLE GAIN 480
LATENT GAIN 830 L
PEOPLE 2 SENSIBLE GAIN 600
LATENT GAIN 460 L
OUCT LOSS Mljl-T= , 1 0 GAIN MULT= , 1 0 352 184
TOTAL FOR R,''lOM 12 11144 CU FT- 143 '
SENSIBLE 31876 21021
LATENT 11290 L
ROOM - 13 BONDS ROOM IN ?ONE 3 11 X 22
WALL 12J3 R- 19 + 1/2 OR 3/4 INCH EXTR POLY 73 263 68
OVERHANG = 1 , 0
WINDOW 3A DC)UBLE PANE CLR GLASS WOOD FRM FACING-S 15 595 238
TINT-TINTED SHADING-DRAPES HALF DRAWN
SHADING COEFFI.CIENT = 1
MALL 12J3 R- 19 + 1/2 OR 3/4 INCH EXTR POLY 128 461 119
OVERHANG = 1 . 0
WALL 12j3 R- 19 + 1/2 OR 3/4 INCH EXTR POLY 126 461 119
OVERHANG = 1 . 0
CEILING 16G DARK R--30 INSULATION 242 575 311
FLOOR 19A HARDWOOD OR VINYL. FLOOR + NO INS 242 2 , 718 0
MINTER INFILTRATION 10 CFM 806
SUMMER' INFILTRATION 15 CFM SENSIBLE GAIN 240
LATENT GAIN 415 L
PEOPLE, 4 SENSIBLE GAIN 1200
LATENT' GAIN 920 L
DUCT LOSS MULT= . 10 GAIN MOLT= . 10 588 229 '
TOTAL FOR ROOM 13 1 '1936 CU FT 242
r SENSIBLE 61466 21524
LATENT 1 , 335 L •
f u{, ;.'{:
u:,f'.r"'.ii,}ra ! N u x't '+-.
r 3zi•w
t ,
r
q
LOG I 1004 S ILIENTIA.L LOADS ANAL Y: I : PAGE
ti
1_I CT
N _ J1 M".1, F f , ,
I I i i I'' .I ,' I .i 'iiti,'7' -I ,' I Y; I
II
i ,, i •,I i 'i'
y ' ;' ,. '4 ? ;s• r ,, y ;;7 r.w K '' "a •: k '' <'i `4: >k do ,4;`:. ? s ; '• ' •>,y
y,
it k .d k• r'
I I,! .-i I , r I. (:ijlllll I (~I `^',• - (•"Ciil( •- i i,l i" ii - "is ,tea- ;1{i — •.
V I - .1` L .i i i I 1 ! i I ', i ', f 1 I 1-j (r r f„i j I ;•1` I
I,l "l IL -,
1 I >t
I'
Chase Orchards, LLC
POB 752
Essex, Connecticut 06426
860-648-2006
December 19, 2000
Allphase Roofing and Remodeling
Exterior Design Specialists, Inc.
Talaga Bros.
Dave Miller Construction
Newsom Construction
Rancourt Construction
Design Works
Re: Woodbridge Roofing Leaks
Chase Orchards Subdivision
Lot's 5, 9, 22, 26, 27, 30, 31, 34, 36, 37and 38
Dear Contractor:
Regretfully I am sending you this correspondence. We each have suffered much
disappointment and loss with our involvement at Chase Orchards. Prior to the outset of the
Gerber Construction lawsuit and ultimate foreclosure by Glastonbury Bank and Trust, we shared
a healthy business relationship. Unfortunately when a project is siphoned for what has now
reached almost $1,000,000.00 it is impossible to overcome the demise that has occurred.
This correspondence is sent as notice to all parties concerned in this matter as a single
correspondence to avoid multiple letters concerning the same subject. In that vain, this
correspondence relates individual as well as collective lots referenced above of which you may
or may not have performed work at. Specifically at this time, I am aware roofing leaks are
occurring at lots 5, 9, 22, 27, and 34.
The Problem:
A roofing leak has occurred at five of the eleven Woodbridge homes that were built at Chase
Orchards. The construction requires a valley (cricket) be framed over the garage where the
garage roof meets the second floor sidewall of the bedroom that is located over the dining roomoftheWoodbridgemodel. When this problem was originally discovered, Angelo D'Leo of
Allphase Roofing and Remodeling inspected the eleven homes and reported to me that in his
opinion the leaking is being caused by the valley that was not properly framed with a cricket
which would shed the water away from the sidewall and therefore prevent any leaking from
occurring.
Chase Orchards, LLC Opinion:
After the inspection and ensuing discussion, I originally concurred with the opinion of Angelo
D'Leo, however after further consideration and inspection of the valleys with others, I believe
improper roofing and flashing installation is causing the leaks.
Page 2, Woodbridge leaks
The installation of the roofing by Allphase Roofing and Remodeling in the valley area included
15 lb. felt paper installed under the roofing and Ice and Water that was installed under the IKO
Architectural shingles in the valley. Standard step flashing was installed along the sidewall and
around the corner of the front corner post were it meets the valley.
The problem that occurs is leaking in heavy rains and/or during freezing temperatures. Firstly
when heavy rain is experienced, the water is unable to move past the corner post quickly
enough without backing up against the corner of the house. This backing up is causing the
water to seep over the step flashing and into the house. Secondly, when freezing temperatures
are prevalent, rain and snow forms into an ice dam that again works its way over the step
flashing and into the interior sidewall. In addition the ice dam backs up in the valley and works
its way under the roofing shingles, and leaks through the valley.
Conclusion (see drawings enclosed):
15 lb. felt paper should first be applied over the roof sheathing. Ice and water should be installed
under the valley and be installed in a continuous method up the sidewall and the front wall
where the wall meets the corner post. Ice and water should extend at least 36" beyond the open
side of the valley. Seams should be tarred to insure sealing. At the corner post, if necessary
additional Ice and Water should be installed to ensure a tight seal at that point. This requires
careful installation of the Ice and Water to ensure a solid seal. Step flashing should be installed
in a reverse method so as to extend higher on the sidewall. This would require additional or
double courses) to be installed with each course of the roofing shingles. Roofing should then
be installed and the valley shingles should be sealed (tarred) on each course.
It is our opinion, if the above method of installation was used, there would not be any leaking on
Woodbridge models. Mr. D'leo disagrees, and claims the valleys installed by the framing
contractors are improperly constructed and that new crickets need to be installed to prevent the
leaking. Allphase Roofing and Remodeling was hired as a professional experienced in the
residential roofing business. It was expected they would use that experience and proper
installation methods to ensure a quality job that would not leak. The method of installation by
Allphase Roofing and Remodeling did not provide that installation and in our opinion they are
responsible to make corrections to any and/or all Woodbridge models.
Mr. Adebola H. Owodunni the owner of Lot 5 has notified Chase Orchards, LLC that his roof is
leaking. He has obtained an estimate from Barnett Construction Co. (copy enclosed) to make
these repairs. I am informed, he is not contracting with Barnett to make these repairs, but is
entering into an agreement with Angelo D'Leo of Allphase Roofing and Remodeling to make the
repairs at a lesser cost. It is Mr. Owodunni's position that he will have the work repaired and file
a suit to recover the cost of repairs from Chase Orchards, LLC. Chase Orchards, LLC will
implead all parties concerned in this matter if that occurs. We do anticipate a conclusion would
result in responsibility to Allphase Roofing and Remodeling.
John J. Doran
Chase Orchards, LLC
Cc/ John Collins, Building Inspector Town of South Windsor
Terrance Zehnder, State of CT, Dept of Consumer Protection
Bola Owudunni
CONT RIDGE VENT
CHITECTURAL SHINGLES
TOP oF PLATE
FIN CLO
30= VENTED SOFFIT
FIN.FLR. SIDINWG TO
O
lul
FIN.FLRL lop 4
FRONT ELEVATION
a
LW
ARCHMECTL
se•-0-
1NIND
10-0• 21'-0• 20'-0• r-w
P.d
W-T 4'-S• 4'4r 4'-r Ir-T I 4'4-
2-7am•
h
10-r Or 17•4 1R-
tY/
b b Q-0' 4'-0• lr4r Z. BEDROOM 2
r
N
MASTER BEDROOM io THE"DRA"
REPR DU
wtTHouT W
D9SION N
7-4- r e• LE(
g r-W
7-0- 2.7 Assoc
ram•ram• 2033 EL
W.7,SOUTH Wi
4
I d
w I.c.BEDROOM
2 2'-W H h
74r
r•r 1'-1- a o- r v r-a err r•r
W
BONUS RM.BEOR M 1 r° OPEN TO
FOYER
Q
MICROLAM LVL MICROLAM LVL T-T 4'-0"TO 4'-T
M
W
T14 O
1COIL-e'0' 1'-0•
E-ENGINEERED ATTIC TRUSS 24'OIC V t h X
O lleY w0 m H
s
3'-0•
C-0' e'-0- 5'-10• 5-IT 4•-0• 4'-T 3'-e- e'o' Y-W
sr-w
Ali 2r700 11: 40 8606684822 BARNETT CONST
Page No. — of gages
BARNETT CONSTRUCTION CO. 502222I.
j 127 SPENCER ST
SUFFIELD,CT 06078
1-860-668-4822
LlC.#54MB5
I
ii P
IOSAL
SUe"IT'TED TO PHONE DATE
oLA Ciwo E-Z-4-t2W5 /4"A 116
5
TT,
JOB NAME
LC4 Cie i d.) A&F r
CrrY, TE AND ZIP CODS: JOB LOCATION ,
A 6k-APWg nC±6AQ o6n! Oua I
ARCNIT ECT DATE OF PLANS JOB PHONE
C.. P60 bo s4i 44-49¢9
We hereby sub-d specthcalione eno ewlrnates for'
LLow
firp-t P-- te q Q_, 1i,•_ 2 !?dtr. ,SJ rJfi -' S --- -- --,
1
JOL e WILec e L.S cS
f
Ili
jr
hereby to furnish mated I and labor—complete in accordance with above specifications,forthe sum of,
1.
00, kA dollars(S
Payment to made dS 011OWS'
FOR ACCOUNTS OVER 30 DAYS 1 A%PER MONTH.18%PER ANNUM
I
Al,matey i.a guaranteed to be as C:' Al to be com tad m a workrrt9nhke
manner ord n9to standard practi s Any a n orde atia mabove specdreationS AVthwaed
nvol-^ng extra costs will to gxeCUted only upon wntten orders,and will baComQ an extra 51gneture
Cr•arge over ano above the estimate All agreemAMS Contingent upon 5tnkes,accidents or I
aetays oeyono our control Owner to carry fire,tomado arid other necessary insurance Our r is pr be
workers are fully covered oy Workmen's Compensa>ton Inaurancs.mthdr""^by of rot °esptad wftftln d8ys
LLr
tt pfartte niI`[}1L1S 1
3 GNATURE
The above pncea,specifications and
condtons are satisfaclory and are hereby accepted You are authorized to do the
i
work as specrlied Payment will W made as outlined above
i DATE OF ACCEPTANCE: 510NATURE
i. .r .•.n . nnnr•nr• nnww n•nn won
DEC 1 '00 12:44 8606684822 PAGE.002
Chase Orchards, LLC
POB 752
Essex, Connecticut 06426
February 14, 2001
Allphase Roofing and Remodeling CERTIFIED MAIL
3 Enfield Street
Windsor Locks, CT 06096
Re: Chase Orchards Roofing
Woodbridge Models
Lot's 4, 5, 9, 22, 26, 27, 30, 31, 34, 36, 37 and 38
Dear Angelo:
Recently you made repairs to the roof at lot# 5 at Chase Orchards to stop the leaking that was
occurring. I have inspected the work that you completed with an independent roofing contractor
and it appears the work has been completed satisfactorily. In our previous discussion after my
letter to you of 12-10-00, you indicated it would be necessary to install a cricket to correct the
leaking that was occurring. You further indicated that the reason the roofs were leaking was
because crickets were not installed by the framing contractors and if they had been the original
roof installations could have be done correctly and the roofs would not have leaked. When you
made the corrections to lot# 5 you did not install the crickets you insisted were needed. Per my
previous correspondence to you dated 12-10-00 1 disagreed with you position regarding the
crickets and provided a written as well as a plan illustration of the method that should have been
used to install the roofing correctly. My independent roofing contractor Mr. Leonard Barrett has
confirmed my position regarding the crickets you claimed should have been installed and of the
installation method I provided to you. It appears you applied that method to correct the leaking
at lot# 5.
You stated in a telephone message to me after receipt of my 12-10-00 correspondence that we
did not provide sufficient materials for the correct installation. As you are aware, our agreement
for your services provided that we supply all materials except nails for the installation. Part of
those materials was Ice and Water Shield You stated in your message that we did not supply a
sufficient amount of Ice and Water Shield to correctly install the valleys. May I remind you your
workmen were not limited in quantity to the materials that were ordered by us for roof
installation. We relied on you as a professional roofer experience in proper roofing application.
We in fact did supply a sufficient amount of Ice and Water Shield to correctly install the roofing
at all homes in Chase Orchards, however if you or your workmen indicated additional Ice and
Water Shield was necessary for the Woodbridge models, it would have been supplied to you as
it had on numerous occasions when your men indicated you were short materials.
There remain eleven additional Woodbridge models at Chase Orchards, some continue to leak.
I am enclosing a copy of Mr. Barrett's estimate to make the repairs to these eleven homes. I
would like to give you the opportunity to make the repairs. Please contact the homeowners
Page 2, Allphase
listed on the enclosed ASAP to determine if any leaking is occurring and make repairs to homes
that are leaking. Additionally the roof leaks have caused damage to the drywall and paint in
several of the houses. I believe your insurance would cover the cost of those repairs and
would request you contact them for inspection of the repairs that are necessary. You may want
to make the repairs with your own workmen and I would agree if you were inclined to do so.
These homeowners have been very patience in this matter and I would hope you would act
expeditiously to make these corrections so as to not inconvenience them further.
Thank you,
John J. Doran, Member
Chase Orchards, LLC
Cc!
Glenn Terk
John Collins
Terry Zenhder
Erin & Mary Cole
Bolla & Saundra Owodunni
Scott & Laura Snyder
John & Pam Valente
Frank & Jewel Amoruso
Charles & Sandra Graves
Steve & Susan Suprenant
Bharat & Vijaya Kolluri
Jack & Susan Archambeault
Carl & Beth Bishopric
Jim & Kathryn Elder
Wally & Ranke Orsamolu
Chase Orchards Homeowners:
Lot#4 Erin & Mary Cole 648-2714
Lot# 9 Scott & Laura Snyder 648-9097
Lot# 22 John & Pam Valente 644-2270
Lot# 26 Charles & Sandra Graves 648-9661
Lot# 27 Frank & Jewel Amoruso 644-2392
Lot# 30 Steve & Susan Suprenant 648-0034
Lot# 31 Bharat & Vijaya Kolluri 648-4032
Lot# 34 Jack & Susan Archambeault 285-5117 Jack work
Lot# 36 Carl & Beth Bishopric 648-4686
Lot# 37 Jim & Kathryn Elder 648-4406
Lot# 38 Wally & Ranke Orsamolu 648-4481
Chase Orchards, LLC
POB 752
Essex, Connecticut 06426
February 14, 2001
Re: Chase Orchards Roofing
Woodbridge Models
Lot's 4, 5, 9, 22, 26, 27, 30, 31, 34, 36, 37 and 38
Dear Chase Orchards Homeowner:
As you are aware, some buyers of Woodbridge model homes have experienced leaking
between the sidewall of the upstairs front bedroom/study into the garage and sometimes
basement area. We have worked diligently to have these repairs made by Allphase Roofing and
Remodeling and I am hopeful they will make the repairs to other homes as they have to lot# 5. If
the repairs are not made within 30 days receipt of my letter to Allphase Roofing and Remodeling
copy enclosed), Chase Orchards will file small claims action against Allphase Roofing and
Remodeling for each home that has a leaking roof, and will have the repairs made by Mr.
Barrett.
Thank you,
John J Doran, Member
Chase Orchards, LLC