Loading...
HomeMy WebLinkAbout176 Margaret DriveElectric# /9(3 5l APPLICATION FOR BUILDING PERMIT Plumbing# ! O HVAC # // Sir- 176 Margaret Drive Date: Z(j y Sprinkler# FINAL APPROVALS Estimated Cost 0 O(y1i tv Building Permit Fee o*D Engineering SIG:NON ETE RED BOXED AREAS Occupancy Fee o-? Affidavit g PE OR PRINT ONLY Eng.Insp.Fee $ Appr. for CO. G L REVERSE SIDE Total Fee TO THE BUILDING DEPARTMENT,TOWN OF SOUTH WINDSOR,CT Additional Cost) $ The undersign d hereby applies to do work according to the following: Applicant -Pu t c:;04 gyj ids Location of Work Q(P M 4&c N-ap+ O e` Lot No. Applicant's Address 7 <,D,ti k c r t aym Tel.# to L1 y 33 Q Town S ,fjN Zip D(o c)-y Lic.# 51_3 Owner M i ka- e-ho c, Architect % Owner's Address 1-7 G. M err,,44-ej or Architect's Address 6 Zip oy Zip Sq. Ft. New Area: 1 st FI.2nd FI. 3rd FI. Total New Area Purpose of this permit 4o ts &pD A-;a r`c& ki a ry q City Water Well Septic System Sewer Ins: HO SP Cert. Area Basement Garage Approved by Date Use Group J&fConstruction Type 4Z6 Revised 8/02 I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town of South Windsor and to notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked,and agree that this building is t located the open distance from all street lines,side yard lines,and required distances from all other Zones and is located in this bui and'tts use is allowed. Signed I hereby apply for a Certificate of tunKcy for the scribed in this application for the permit. Signed DO WT WRITE BELOW THIS LINE INSPECTION COMMENTS Inspection / Approval Date By Appl Code Description Due Whom Code Comment 29111-B 50,000 B01 FOOTING 09/03/02 CJD A B02 FOUNDATION 09/06/02 WNB A LEFT NOTICE B03 FRAMING (ROUGH) 10/30/02 CJD A NEED LAM AND TRUSS SPECS E03 ROUGH 10/30/02 CJD A W/TIM P03 ROUGH 10/30/02 CJD A W/MIKE DWV AND H2O H03 ROUGH 10/30/02 CJD A AIR COND. DUCT WORK OK TO CONCEAL-MUST CHECK ATTIC INSTALLATION ETC. B04 INSULATION 11/04/02 WNB A WITH CONTRACTOR CREW B10 FINAL 02/13/03 CJD D NEED GUARD ANSD HAND RAIL AT REAR STEPS. SECURE SLIDER B10 FINAL 04/17/03 CJD A B10 FINAL 06/18/03 JRC A CLOSEOUT 11586-H 2,000 11150-P 2,000 18051-E 3,000 E01 SERVICE 01/10/03 CJD A W/TIM