Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
165 Berle Road (5)
PERMIT # Application For 6334 5943 DEPARTMENT DECISION Cd to Heating Permit 0 3 APPLICATION IS HEREBY: O DEPARTMENT OF LICENSES AND INSPECTIONS tA APPROVED DISAPPROVED c -4-) TOWN OF SOUTH WINDSOR o a, 7/9/84 Thanas P. D' Auria 00 DATE CHIEF INSPECTOR APPLICATIONS MUST BE PRINTED OR TYPED. BEGIN WITH NUMBER ONE BELOW O 1. LOCATION OF JOB o 0o Cad NO. STREET 0 Co v LOT NO. FLOOR APT. NO. O O lV T d 0 X2. OWNER 1.4 Cd 000 0 ADDRESS 3 4.PHONE De» Cd B. APPLICANTS vi CCdd 0 go 6. ADDRESS 7 J,.-- 7- S7`d y) 7.PHONE 3-3'-3-?.7 w "c B. LICENSE NO. 7& a C w B. EXPIRATION DATE OF LICENSE ©" C 10. ESTIMATED COST = W N 11. IS THIS A CONTRACT COST?LJ YES 0 NOr= b4 12. FEE ENCLOSED S Permit #13 5 5 2 1 s. TYPE OF BUILDING: b RE81DENTUIL COMMERCIAL O . y-' INDUSTRIALCd314. TYPE OF JOB: GINAL~ STALLATI N ADDITIIONONIN REPAIR APPLICATION FOR HEATING PERMIT (Continued from R v me Side) 11. LOCATION OF JOB 0 a,..el-x C J? NO. STREET FLOOR APT.NO. 12. TYPE OF INSTALLATION: OIL BURNER ELECTRIC VENTILATION SPRINKLER GAS BURNER STACK INCINERATOR MISCELLANEOUS IDENTIFY SIZE LOCATION SIZE a SIZE 13. OF TANK dw_2 1 OF TANK t:90 clec' OF FILL OF VENT 14. B.T.U. EQUIP. AT REGISTER FURNACE MAKE AND NO. AT BONNET FIRING RATE BOILER OR FURNACE MAKE AND N0.?0167-Y B.T.U. OR SQ. FT. NETS dLAJB.T.U. OR SQ. FT. GROSS FIRING RATE FLOORS TO BE HEATED NEW OR Q).D BUILDING VZe,42 INSULATED - YES OR NO TYPE OF WALL 4<4`2 INSULATION •3 2' ROOF OR CEILING. CL' INSULATION AVG..SYSTEM WATER TEMP. lf_0 B.T.U./SQ. FT./HR. EMISSION INDOOR-OUTDOOR TEMPERATURE DIFFERENCE FAHRENHEIT MAKE OF RADIATION: BASEBOARD. COPPER CONVECTORS. OR C.I. RADIATION. OUTPUT PER SECTION OR LINEAL OF RADIATION. SQ. FT. OR B.T.U. aM,092DESCR S 7 15. TO BE I OINE; ON OF WORK 7 I) 16. HEAT LOSS SCHEDULE. (TO BE INCLUDED FOR ALL JOBS: ROOM SIZE AND 000Rs AREA - SQUARE FEET VOLUME B.T.U. B.T.U. 9<o DISTRIBUTION INSTALLED TOTAL TOTAL q ROOM NO. GROSS GLASS HET WALL CEILING FLOOR CU.FT. AT 70•F CORRECTED j 4 a: RAO. REGISTER L W H AND E TEMP. TO F TYPE AND SIZE OR LEADER SIZE < WALL f INFILT.) RIFF. F M N SO' FT'10 FREE AREA TOTALS A. HEAT LOSS FROM BUILDING B.T.U./HR. B. DOMESTIC HOT WATER DEMAND B.T.U./HR. C. PIPING. OTHER THAN NORMAL B.T.U./HR. ALLOWANCE FOR HEAT VALVE OF FUEL (A B C) FACTOR 17. ELECTRICAL WORK BY: NAME ADDRESS SUBCONTRACTORS AND 1 e. THEIR TRADES ALL WORK COVERED BY THIS APPLICATION HAS BEEN AUTHORIZED BY THE(OWNER) OR (AGENT) OF THIS PROPERTY AND WILL BE DONE IN STRICT ACCORDANCE WITH THE BUILDING CODE. APPLICATION TO BE COMPLETELY FILLED IN. DATE SIGNATIIR OF APPLICANT I = B= R C LCULATION SHEET 1503 (Modern Method)Copyright 1977 by The Hydronics Institute OWNER ADDRESS 47- r DESIGN TEMPERATURE DIFFERENCE r. DATE COL.A COL.B COL.C COL.D COL.E COL.F COL.G 1 ROOM OC f- O H. L I W H L W H L W =LW H L W Design Water Temp. 2 ROOM DIMENSIONS, FT. U Jd G Q '`,/. , r f_ DO BTUH per Foot f3LENGTHEXPOSEDWALLS, FT. Q 11-7 7 Radiation Selected 4 WINDOW AND OUTSIDE DOOR AREA LL 3(- 5 WALL CONSTRUCTION BTUH BTUH BTUH BTUH BTUH Table 9, Line 3 x H) 7 / '/ ) fv G t7 D Q(v 7;) ROOM LIN.FT.OF cJ TOTALS RADIATION6TYPEOFGLASSFROMLINE12SELECTED Bottom of table used for Line 5) 7 CEILING CONSTRUCTION 7 C/ C Table 9, L x W) U J U0 J i 9(l p Q uz) B FLOOR CONSTRUCTIONt C) Oy-6•s'x-3- vx 5,0 3- s /xs a 3-1,5/tC s,bTable9, L x W or Lin Ft.)X E 6-(-,'p0- /0 9 COLD PARTITION CONSTRUCTION v F , t-7- toTable9, L x H) 10 c 1 Wall(With Openings) O - CV,! G r(.`r) U o C r _ L U 2 Walls(With Openings) X '' r' H JG- F, J y v U V U 1 660 03Walls(With Openings) or Ent. Hall 1O 11 TOTAL BTUH AT 70F TEMP DIFFERENCE' mi ll 12 TOTAL BTUH AT DESIGN TEMP. DIFFERENCE vV UUJ f• G! 11 r' L 70 COL.A COL.B COL.H COL. I COL.J COL. K COL.L P TOTAL BTUH TOTAL 1 ROOM dJjt j,OF BUILDING RADIATION AT SELECTEDOHLWHLWHLWHLWHLIWDESIGNTEMP.- 2 ROOM DIMENSIONS, FT. U Z rt f0 ai /v r G /G r7 b, / Z DIFFERENCE 3 LENGTH EXPOSED WALLS, FT. Q b i 4 WINDOW AND OUTSIDE DOOR AREA LL t-"-- f ZY LL BTUH BTUH BTUH BTUH BTUHfI 5 WALL CONSTRUCTION INCREASE BATHROOMITable9, Line 3 x H) 0 7 d2 J-U U 600 v- /Q ZJ Vd 0 UU TOTAL 20% 6 TYPE OF GLASS i Bottom of table used for Line 5) 7 J_0 p2-3 Q-v 3 C1(J V rv-o 7 CEILING CONSTRUCTION tFOR CONCRETE FLOOR ON Table 9, L x W)J v GROUND OR FILL AT GRADE LEVEL,USE LINEARBFLOORCONSTRUCTIONt3_ 7,OX y p , tI ( O yIeXj-,-V /_G V x. 3.6 FEET OF EXPOSED EDGE Table 9, LxWorLm Ft.) D, -•, O Q a Q)CS _ ,e K 7, p9COLDPARTITIONCONSTRUCTION Table 9, L x H) 10 c 1 Wall(With Openings) C ( o 2 Walls(With Openings) X f7// U U 3 Walls(With Openings) or Ent. Hall J 4L} o0U l o v 0 O 11 TOTAL BTUH AT 70F TEMP DIFFERENCE' Irxi1 f ! 9 D () U U D12TOTALBTUHATDESIGNTEMP. DIFFEREK'_' J UZ) J / tJ U U v This f rm is available fr m The Hydronics Institute, 35 Russ Place, Berkeley Heights, N J 07922 FORM 1503