Loading...
HomeMy WebLinkAbout1645 Ellington Road (10)wIND50R , CO,NNECTIC:TiPLANNINGANDZONINGCOMMISSION APPLICATION soe•cor` FORM yrP Application No. . Y ,r 4DateRece Action lic Hearing y ; gc! Re No. : APPLICANT: John G. Samsel, Jr. Manning & .'_unin[? ADDRESS : 152 Deming Street, South Windsor, Cr 06074 TELEPHONE: 644-1157OWNEROFRECORDONLANDRECORDS : John G. Samsel, Jr. , Richard L.MahOner & elyyn B. Mark:ADDRESS : c/o Clark Corners Associates, 152 Deming Street South Windsor Cr 06074 COMPLETE LOCATION OF PROPERTY:Southeast corner of Ellington Road and Clark Streetintersection; see "Location Map" on drawing No. 1 of site plan RC ZONE: NAME, ADDRESS , & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BEDIRECTED: John G. Samsel, Jr. 152 Deming Street, South Windsor, Cr 06074 TELEPHONE: 644-1157 THIS APPLICATION IS FOR : (Check one of the following) 1 . Zone Change to Public Hearing required) . 2 . Subdivision . 3. Open Space Subdivision (Public Hearing required) . 4. Resubdivision (Public Hearing required) . S. Special Exception to Article Public Hearing Required ) . 6. Site Plan of Development. 7. Earth Filling [Section 101 and/or Earth Removal [Section 9 ]Public Hearing Required) . 8. General Plan of Development. 9. Regulation Amendment : Zoning Subdivision 10. Other (explain in detail) : CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. THIS APPLICATION MUST BESIGNEDBYTHEAPPLICANTANDOWNEROFTHEPROPERTYANDSUBMITTEDINTRIPLICATEWITHALLMAPANDDOCUMENTSREQUIRDONATTACHEDHECKLISTr l App ica t Own r John G. Samsel, Jr. John G. Samsel, Jr. PLANNING AND ZONING COMMISSION APPLICATION . CONT' D. TIME FRAMES AND - PROCEDURES FOR SUBMITTING APPLICATIONS/PLANS 1 . All prospective applicants are urged to confer with Town Planning Department and Engineering Department staff prior to submission of any application to the Commission . 2 . Plans are officially received only on the fourth Tuesday of each month at the Regular Meeting of the Planning & Zoning Commission (PZC) . 3 . Three ( 3) sets of blueprints are required on the second Tuesday of the month for review by the Town Planning and Engineering Departments . This deadline must be met if you want to ensure that your application is officially received by PZC. These plans must be submitted as complete plans -- which includes application plus all required information contained on checklist . No plans will be accepted at the counter if checklist is incompl t It is the applicant ' s responsibility to ensure that all information required on the checklist is submitted in one package at th time of submission -- including landscaping plans, architectural el vations, traffic report , etc . Planning Department staff will not acc pt checklists with blank spaces, or with "by others" in any space. 4. Town staff will notify the applicant with any changes required to mak the plans in complete compliance with our Zoning/Subdivision Regulations . 5 . All changes requested must be made and new, complete blueprints must be submitted . At this time six sets of plans must be submitted . If a Public Hearing is required ( or optional but likely) then seven sets are required . 6 . Planning Department/Engineering Department staff will review plans only once -- if the resubmissions are not complete/correct , the Town Planners report will reflect that revisions were not made as requested . GAETANO J. BAZZANO, ARCHITECT QUALIFICATIONS SUMMARY Owner of the firm since it was established in September, 1980, Mr. Bazzano was previously a principal of the architectural firm of the late Philip J. diCorcia, Associates. Mr. Bazzano ' s ex- perience lies in all areas of architecture and land planning with emphasis on residential , commercial , and industrial buildings. He has been involved in the planning, design, construction docu- ments, cost analysis and supervision of various building types and sizes. EXPERIENCE Mr. Bazzano ' s experience encompasses a range of services from master planning to designing furnishings, and finally to per- manent occupancy. His designs of various projects have ranged in size from privately owned residence and business buildings to large industrial and residential complexes. Working closely with the private and industrial and residential developer, Mr. Bazzano has accumulated a strong technical back- ground in all phases of building design, construction methods, and materials. This has resulted in economical and practical building designs. Mr. Bazzano has planned and designed over 1, 500, 000 square feet of industrial buildings, over 2000 multi-family units, in excess of 500 , 000 square feet of office buildings and over 750, 000 square feet of mercantile buildings. EDUCATION B.S. in Architecture - Rhode Island School of Design - 1957 MEMBERSHIP National Council of Architectural Registration Boards REGISTRATION STATE DATE REGIS. NO. TYPE Connecticut June 1970 2344 R.A. South Carolina 9-29-83 2833 R.A. Texas 11-29-83 9908 R.A. Massachusetts 9-13-84 5863 R.A. New York 12-24-84 17330 R.A. North Carolina 6-30-85 4613 R.A. New Jersey 10-21-85 09246 P.A. Pennsylvania 4-23-86 010062-B R.A. Rhode Island 11-19-86 1543 R.A. New Hampshire 9-13-88 1810 R.A. Ohio 8-11-88 8910 R.A. 1 GAETANO J. BAZZANO, ARCHITECT PARTIAL LISTING OF PROJECTS BUILDING LOCATION TYPE DATE Ames Office Expansion Rocky Hill, CT Business 1985 120, 000 sf Ames Dept. Store Prototype Mercantile 55, 000 sf Several built and/or under construction) Ames Dept. Store Prototype Mercantile 56, 560 sf Several built and/or under construction) Ames Dept. Store Tonawanda, N.Y.Mercantile 1985 70, 000 sf Ames Dept. Store Raynham, MA Mercantile 1985 55, 000 sf Lubbock Shopping Ctr. Lubbock, Texas Mercantile 1986 70, 000 sf Strawbridge Condos South Windsor CT Multi-family 1987 254 units Midway Office Complex Windsor, CT Business 1987 160, 000 sf B&B Assoc. Printers South Windsor CT Industrial 1985 25, 000 sf Meadows of Enfield Enfield, CT Multi-family 1986 132 units Ames Office Addition Rocky Hill, CT Business 1987 2 floors 44 , 000 sf Concord Shopping Ctr Concord, N.C. Mercantile 1987 122 , 000 sf Terry Office Park South Windsor,CT Business 1987 30, 000 sf Medical Arts Office East Hartford,CT Business 1987 Addition 20, 000 sf Ribbon Mill Apts. Manchester, CT Multi-family 1985 Rehabilitation)104 units 2 GAETANO J. BAZZANO, ARCHITECT PARTIAL LISTING OF PROJECTS BUILDING LOCATION TYPE DATE Southfield Manchester, CT Multi-Family 1987 Condominium 96 units Valley Brook Rocky Hill, CT Business 1988 Office Complex 27, 000 sf Hudson Park Hartford, CT Business 1988 Office Complex 150, 000 sf Briarknoll Apartments Vernon, CT Multi-family 1988 150 units Hilltop Apartments Norwich, CT Multi-family 1988 150 units Mayfield Enfield, CT Multi-family 1989 Congregate Living 122 units Concorde Landing Windsor Locks, CT Multi-family 1989 132 units Office - Industrial West Hartford, CT Idustrial 1988 Complex 130, 000 square feet 3 STORMWATER DETENTION AT CLARK CORNERS Presently, there is a natural detention basin on the property that discharges through a 15 inch pipe at Ellington Road to the north. At the Town Shopping Center, a detention basin was designed with a 15 inch outfall pipe and a weir structure, both of which discharge to a piped system in Ellington Road as required by the Town of South Windsor. This detention basin will limit the peak flows to the present level for 2, 10, 25, 50 and 100 year frequency storms. It has been proposed to connect the Clark Corners project to the Town Shopping Center project with a drive paralleling Ellington Road to ease internal traffic circulation. This drive would pass through the Town Shopping Center detention basin, reducing the available storage. To compensate for this it would be necessary to modify the outlet structure. The 15 inch pipe to Ellington Road would be modified with a 12"orifice plate and new 12 inch pipe would be constructed in the connector drive and would discharge into the detention basin at Clark Corners. This basin would be enlarged slightly and the outlet would be restricted by placing a steel plate with an 11 inch round opening over the existing 15 inch outlet pipe. This proposed construction would maintain peak flows at the present level for 2, 10, 25, 50 and 100 year frequency storms. Attached is a summary of peak flows at Clark Corners, both existing and proposed. Also attached is a summary of peak flows from Town Shopping Center, including proposed to Ellington Road, proposed to Clark Corners and existing to Ellington Road. 87-546 Corres. 1214A88BAK FUSS&O'NEILL PREPARED DATE CHECKED DATE PROJECT NO.O consulting engineers Y BY m SAM5{.,. - C 1.14 k G d2 N RS V M A R.A SHEET NO. of YQ. is Yie So YR__ 10o.YA s'gc Qi T 3 .1 -GAS •3 c 5 6.9c S St- _, 8 1 G L sV< t r j i 1 i ( I' LL I+. asaw—x wa+ -.^+omq`.-, ,_...,m«-wmuRa.sw-uroro-...-.m,e-.:_,ay .r.--,..,-- ,,,_ •• ..a,..,m.-..nxa..m..t,.wcm.m.t.v do,.a.+...w.,=e, ua:..ca...m..exvwe..a FO-*110 fmFUSS&O'NEILL PREPARED DATE CHECKED DATE PROJECT NO. consulting engineers BY 12/7/TT BY S-4 S"I67--sm SHEET NO. of V Lo v -tp 6 A- 0 k IF L-s-TO rem roL'-T 6?AL' T67 at!iv6 5-L i 1a, CAAZltt T LA 77 J(Ld17Ttl 4-11 4- T 4 T 4-4- FO-#110 PREPARED BY: DATE: FUSSWN13M SH. N0. I OF Z F17F} E- 3 1 - SFS J20 MANCN[ iT[ II. CONN[ CTICUT CHECKED EY. DATE: PROJ. N0. 27 - 5+ 6 GUTTER FLOW ANALYSIS TOWN Clock C ner AI Entering Catch o-" r Basin 0lb O O a Al Bypassing Inlet 0 Bypassing Inlet l i dth of Flow nrjV1 — L N ° N° Depth of Flow rj ,_' r,3 at gutter Cross Slope of Shoulder O O O O Grade of Gutter N N N o O O 0 o r- 0 to Inlet N Rainfall Intensity - 9 r9 Total Al o 0 Sum of Al r Al 7= Runoff Coefficient r Area in Acres O Time to Inlet s o q C_. Inlet Number dY- UAi t. $ __ gg Fo FUSS& O" NEILL SH. NO. rL OFT MANCHESTEII. COMNECTICUT CHECKED BY: DATE. DROJ. NO. G- rJ M a- g8 57- 546, STORirI SEWER SYSTEM TaNN DESIGN C IorK Cor- 1er- 5 Schrll, I, c) ndso M N1 M I M Nl rl M 0 a O O Q O HEADWATERFULL CAPACITY CT- 9 AVERAGE VELOCITY Q SLOPE O O o o O O a • o LENGTH OF PIPE - + d 01- rL rL ( I. PIPE SIZE fu N_ c n n V) i 0 1 N SYSTEH O Li) M ° n RAINFALL 1 NTE11S! Y v, ui S r V% SUI! OF Al IN p 9O ci SYSTEIf Al ENTERING N O q CATCH EASIN ACCUMULATED TINE T I I-: E IN PIPE T I R: E TO INLET LINE SEGHE NT FUSS&O'NEILL PREPARED DATE CHECKED DATE PROJECT NO. 1 O consulting engineers BY q zo BY g 8-sy i CLA?-K CoP-N&TzS — 50c,T4 IWlNI,SDR-,SHEET NO. J of X Is'ri N e r hRQ POs 1 Z7 Ac 1st'-)( -70 1(038' Zo3v ; 2,`t ` toy, ZSY S•t• C uTLr-- oi FO-#110 fm FUSS&O'NEILL PREPARED DATE CHECKED DATE PROJECT NO. consulting engineers BY Q/BY G/4l A° G L,Af K, G'OR IJ R,S c " L,tJlNd SO,g SHEET NO. of E LEy,. A 1 4 wL. To-TA,L VoL. 7 Z s7 At, F:I,. 77 Q7iZ A.IiQ. 17 3Zu so Stw,' i n o FO-#110 FUSS&O'NEILL PREPARED DATE CHECKED DATE PROJECT NO.O consulting engineers BY BY SHEET NO. of IDS: __i,'• :IA i/ 2 _ w _. s 1T-41 rt i 1 t r 1 t r i i r r- 6 f FO-#110 ttttttttttttttttt80-BO LIST OF INPUT DATA FOR TR-20 NYDROL06Ytttttttttttttttttt OB TR-20 FULLPRINT SUMMARY NOPLOTS ITLE 001 SAMSEL EXIST 9 87 546 CLARK CORNERS 3 STRUCT 01 8 72.0 0.0 0.0 8 73.0 2.8 573 8 74.0 6.5 2.06B 8 76.0 10.8 7.781 9 ENDTBL 6 RUNOFF 1 001 6 .0427 70.0 5 1 1 1 6 RESVOR 2 01 6 7 72.0 1 1 1 1 ENDATA 7 INCREM 6 10 7 COMPUT 7 001 O1 0,0 3.15 1.0 2 2 01 02 ENDCMP 1 7 COMPUT 7 001 O1 0.0 4.8 1.0 2 2 01 10 ENDCMP 1 7 COMPUT 7 001 01 0.0 5.4 1.0 2 2 01 25 ENDCMP 1 7 COMPUT 7 001 O1 0.0 6.15 1.0 2 2 01 50 ENDCMP 1 7 COMPUT 7 001 01 0.0 6.9 1.0 2 2 01 99 ENDCMP 1 ENDJOB 2 fttttttttttttttttttttttttttttttEND OF 80-BO LISTtttttttttttttttttttttttttttttttt R20 XEQ 12-09-88 12:36 SAMSEL EXIST Q 87 546 CLARK CORNERS JOB 1 SUMMARY REV PC 09/83(.2) PAGE 12 iUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDR06RAPH WITH PEAK AS LAST POINT.) iECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK QISCHAR6E TRUCTURE CONTROL QRAINA6E TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA 1 COND INCREM BE6IN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE SA MI) HR) MR) (IN) (HR) (IN) FT)HR) CFS)CSM) ALTERNATE 1 STORM 2 SECTION 1 RUNOFF .04 2 2 .10 .0 3.15 24.00 .80 12.23 16.17 378.7 STRUCTURE 1 RESVOR .04 2 2 .10 .0 3.15 24.00 .79 73.07 13.28 3.08 72.0 ALTERNATE 1 STORM 10 SECTION 1 RUNOFF .04 2 2 .10 .0 4.00 24.00 1.89 12.21 42.10 985.9 iTRUCTURE 1 RESVOR .04 2 2 .10 .0 4.80 24.00 1.87 73.93 13.33 6.25 146.3 ALTERNATE I STORM 25 SECTION 1 RUNOFF .04 2 2 .10 .0 5.40 24.00 2.34 12.20 52.66 1233.3 iTRUCTURE 1 RESVOR .04 2 2 .10 .0 5.40 24.00 2.32 74.17 13.40f 6.86f 160.7 ALTERNATE 1 STORM 50 SECTION 1 RUNOFF .04 2 2 .10 .0 6.15 24.00 2.92 12.20 66.40 1555.1 iTRUCTURE I RESVOR .04 2 2 .10 .0 6.15 24.00 2.89 74.46 13.57 7.48 175.1 ALTERNATE 1 STORM 99 SECTION I RUNOFF .04 2 2 .10 .0 6.90 24.00 3.53 12.20 80.59 1887.4 iTRUCTURE 1 RESVOR .04 2 2 .10 .0 6.90 24.00 3.48 74.76 13.68 8.13 190.5 R20 XEQ 12-09-88 12:36 SAMSEL EXIST 9 87 546 CLARK CORNERS JOB I SUMMARY REV PC 09/83(.2) PAGE 13 UMMARY TABLE 3 - DISCHAR6E (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES SECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS.......... ID S9 MI) 2 10 25 50 99 STRUCTURE 1 04 ALTERNATE 1 3.08 6.25 6.B6 7.4B 8.13 XSECTION 1 04 ALTERNATE 1 16.17 42.10 52.66 66.40 80.59 ttttttttttttttttt80-8D LIST OF INPUT DATA FOR TR-20 HYDROL06Ytttttttttttttttttt OB TR-20 FULLPRINT SUMMARY NOPLOTS ITLE 001 KELLY SAMSEL DRIVE IN DETENT RUN 2 B5 4B9 87 546 3 STRUCT 01 B 72.0 0.0 0.0 8 73.0 2.3 972 B 74.0 3.9 2.702 8 76.0 6.00 9.702 9 ENDTBL 6 RUNOFF 1 001 6 .0428 74.0 5 1 1 1 6 ADDHYD 4 002 1 6 7 1 1 1 6 RESVOR 2 01 7 6 72.0 1 1 1 1 ENDATA 7 INCREM 6 10 7 READHD 8 1 7 READHD 9 0.0 10 0428 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 B 0.0 0.0 0.0 0.0 0.0 B 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 B 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 B 0.0 0.0 0.0 0.0 0.0 B 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 B 25 45 45 45 45 8 45 45 45 45 5 B 55 6 6 65 7 8 85 1.15 1.95 3.35 4.05 8 4.9 5.35 5.7 5.85 5.95 8 5.95 5.9 5.B 5.65 5.5 8 5.35 5.2 5.05 4.7 4.4 8 4.1 3.8 3.5 3.2 2.45 8 1.95 1.65 1.4 1.25 1.15 8 1.1 1.0 1.0 95 9 9 ENDTBL ttttttttttttttttttttt80-60 LIST OF INPUT DATA (CONTINUED)tttttttttttttttttttttt 7 COMPUT 7 001 01 0.0 3.15 1.0 2 2 01 02 ENDCMP 1 7 READHD B 1 7 READHD 9 0.0 10 0429 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 • 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 B 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 B 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 45 65 7 7 75 B 75 8 8 8 85 8 0.9 1.0 1.1 1.25 1.5 8 2.05 3.35 4.15 5.25 6.1 8 6.85 7.4 7.5 7.7 7.75 8 7.7 7.65 7.5 7.4 7.35 8 7.3 7.2 7.05 6.85 6.7 6 6.5 6.3 6.15 5.9 5.7 8 5.55 5.35 5.15 4.95 4.6 8 4.3 4.0 3.7 3.5 3.3 9 ENDTBL 7 COMPUT 7 001 01 0.0 4.6 1.0 2 2 02 10 ENDCMP 1 ENDJOB 2 FttttttttttttttttttttttttttttttEND OF 80-00 LISTtttttttttttttttttttttttttttttttt R20 XEQ 12-13-88 13:33 KELLY SAMSEL DRIVE IN DETENT RUN 2 85 489 87 546 JOB 1 PASS 1 REV PC 09/83(.2) PAGE I XECUTIVE CONTROL OPERATION INCREM MAIN TIME INCREMENT = .10 HOURS RECORD ID XECUTIVE CONTROL OPERATION READHD DISCHARGE HYDROGRAPH, HYDR06RAPH LOCATION 1 RECORD ID STARTING TIME= .00 TIME INCREMENT= .10 DRAINAGE AREA= .04 BASE FLOW= .00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 25 45 45 45 45 45 45 45 45 50 55 60 60 65 70 85 1.15 1.95 3.35 4.05 4.90 5.35 5.70 5.65 5.95 5.95 5.90 5.80 5.65 5.50 5.35 5.20 5.05 4.70 4.40 4.10 3.80 3.50 3.20 2.45 1.95 1.65 1.40 1.25 1.15 1.10 1.00 1.00 95 90 ENDTBL ECUTIVE CONTROL OPERATION COMPUT FROM XSECTION 1 TO STRUCTURE 1 RECORD ID STARTING TIME = .00 RAIN DEPTH = 3.15 RAIN DURATION= 1.00 RAIN TABLE NO.= 2 ANT. MOIST. COND= 2 ALTERNATE NO.= I STORM NO.= 2 MAIN TIME INCREMENT = .10 HOURS ERATION RUNOFF CROSS SECTION 1 OUTPUT HYDROGRAPH= 6 AREA= .04 SQ MI INPUT RUNOFF CURVE= 74. TIME OF CONCENTRATION= .50 HOURS R20 XEQ 12-13-OB 13:33 KELLY SAMSEL DRIVE IN DETENT RUN 2 85 489 87 546 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 9 UMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) ECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE TRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE SQ MI) HR) (HR) (IN) (HR) (IN) FT) (HR) CFS)CSM) ALTERNATE 1 STORM 2 SECTION 1 RUNOFF .04 2 2 .10 .0 3.15 24.00 1.00 12.22 21.65 505.9 SECTION 2 ADDHYD .09 2 2 .10 .0 3.15 24.00 .74 12.22 27.39 320.0 TRUCTURE 1 RESVOR .09 2 2 .10 .0 3.15 24.00 .68 73.56 14.301 3.19* 37.2 ALTERNATE 2 STORM 10 SECTION 1 RUNOFF .04 2 2 .10 .0 4.80 24.00 2.20 12.20 50.07 1169.9 SECTION 2 ADDHYD .09 2 2 .10 .0 4.00 24.00 1.50 12.20 57.58 672.6 TRUCTURE 1 RESVOR .09 2 2 .10 .0 4.80 24.00 1.25 74.57 14.95 4.50 52.5 fR20 XEQ 12-13-88 13:33 KELLY SAMSEL DRIVE IN DETENT RUN 2 85 489 87 546 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 10 SUMMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES SECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS.......... ID SQ MI) 2 10 STRUCTURE 1 09 ALTERNATE 1 3.19 00 ALTERNATE 2 00 4.50 XSECTION 1 04 ALTERNATE 1 21.65 00 ALTERNATE 2 00 50.07 XSECTION 2 09 ALTERNATE 1 27.39 00 ALTERNATE 2 00 57.58 l ffffffffffffffffff80-80 LIST OF INPUT DATA FOR TR-20 HYDROLDGYffffffffffffffffff JOB TR-20 FULLPRINT SUMMARY NOPLOTS TITLE 001 KELLY SAMSEL RUN 3 85 489 87 546 3 STRUCT 01 8 72.0 0.0 0.0 8 73.0 2.3 972 8 74.0 3.9 2.782 8 76.0 6.0 8.702 9 ENDTBL 6 RUNOFF 1 001 6 .0429 74.0 5 1 1 1 6 ADDHYD 4 002 1 6 7 1 1 1 6 RESVOR 2 01 7 6 72.0 1 1 1 1 1 ENDATA 7 INCREM 6 1 7 READHD 8 1 7 READHD 9 0.0 1 0428 0.0 8 0 0 0 0 0 8 0 0 0 0 0 B 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 55 7 8 85 85 8 9 9 9 9 9 8 95 1.0 1.05 1.15 1.25 8 1.45 1.75 2.4 3.5 4.5 6 5.55 6.5 7.3 7.7 7.9 8 7.95 7.95 7.9 7.85 7.8 8 7.7 7.6 7.4 7.35 7.3 8 7.2 7.0 6.85 6.65 6.5 8 6.3 6.1 5.95 5.75 5.55 8 5.35 5.2 5.0 4.7 4.4 8 4.1 4.0 3.9 3.8 3.7 fffffffffffffffffffffB0-80 LIST OF INPUT DATA (CONTINUED)ffffffffffffffffffffff 9 ENDTBL 7 COMPUT 7 001 O1 0.0 5.4 1.0 2 2 01 25 ENDCMP I 7 READHD B I 7 READHD 9 0.0 10 0428 8 0 0 0 0 0 8 0 0 0 0 0 B 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 B 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 B 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 6 8 9 95 1.0 B 1.0 1.05 1.05 1.05 1.1 8 1.1 1.15 1.25 1.3 1.45 8 1.7 2.05 2.05 3.7 4.9 8 5.9 6.95 7.7 8.0 8.1 8 8.15 B.15 8.1 0.05 7.95 8 7.95 7.8 7.650 7.5 7.35 8 7.3 7.3 7.15 7.0 6.8 8 6.65 6.45 6.3 6.15 5.95 8 5.75 5.5 5.3 5.2 5.1 9 ENDTBL 7 COMPUT 7 001 01 0.0 6.15 1.0 2 2 02 50 ENDCMP 1 7 READHD 8 1 7 READHD 9 0.0 1 0428 0.0 B 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 B 0 0 0 0 0 B 0 0 0 0 0 0 0 0 0 0 0 ttttttttttttttttttttt80-BO LIST Of INPUT DATA (CONTINUED)tttttttttttttttttttttt 8 0 0 0 0 0 8 0 0 0 0 0 e 0 0 0 0 0 8 0 0 0 0 0 e 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 00 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 0 0 0 0 0 8 65 85 1.0 1.05 1.1 8 1.15 1.2 1.2 1.25 1.25 8 1.3 1.35 1.45 1.55 1.7 8 1.95 2.4 3.25 3.9 5.15 8 6.25 7.3 7.95 0.25 8.4 8 8.4 8.3 8.2 9.1 8.05 8 7.95 7.9 7.8 7.65 7.5 8 7.4 7.35 7.3 7.2 7.05 8 6.9 6.75 6.6 6.4 6.25 8 6.1 5.95 5.75 5.6 5.45 8 5.25 5.1 5.0 4.9 4.8 9 ENDTBL 7 COMPUT 7 001 O1 0.0 6.9 1.0 1 2 03 99 ENDCMP 1 ENDJOB 2 ttttttttttttttttttttttttttttttEND Of 80-80 LISTtttttttttttttttttttttttttttttttt fR20 XE9 12-13-BB 14:20 KELLY SAMSEL RUN 3 B5 407 B7 546 JOB 1 PASS 1 REV PC 09/B3(.2) PAGE 1 XECUTIVE CONTROL OPERATION INCREM MAIN TIME INCREMENT = .10 HOURS RECORD ID XECUTIVE CONTROL OPERATION READHD DISCHARGE HYDROGRAPH, HYDROGRAPH LOCATION I RECORD ID STARTING TIME= .00 TIME INCREMENT= .10 DRAINAGE AREA= .04 BASE FLOW= .00 1 00 00 00 00 00 1 00 00 00 00 00 1 00 00 00 00 00 1 00 00 00 00 00 00 00 00 00 00 1 00 00 00 00 00 00 00 00 00 00 1 00 00 00 00 00 00 00 00 00 00 1 00 00 00 00 00 00 00 00 00 00 1 00 00 00 00 00 00 00 00 00 00 1 00 00 00 00 00 00 00 00 00 00 1 00 00 00 00 00 00 00 00 00 00 1 00 00 00 00 00 00 00 00 00 00 1 00 00 00 00 00 55 70 80 B5 85 1 90 90 90 90 90 95 1.00 1.05 1.15 1.25 1.45 1.75 2.40 3.50 4.50 5.55 6.50 7.30 7.70 7.90 7.95 7.95 7.90 7.85 7.80 7.70 7.60 7.40 7.35 7.30 7.20 7.00 6.85 6.65 6.50 6.30 6.10 5.95 5.75 5.55 5.35 5.20 5.00 4.70 4.40 4.10 4.00 3.90 3.80 3.70 ENDTBL XECUTIVE CONTROL OPERATION COMPUT FROM XSECTION 1 TO STRUCTURE 1 RECORD ID STARTING TIME = .00 RAIN DEPTH = 5.40 RAIN DURATION= 1.00 RAIN TABLE NO.= 2 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.=25 MAIN TIME INCREMENT = .10 HOURS PERATION RUNOFF CROSS SECTION 1 R20 XEQ 12-13-OB 14:28 KELLY SAMSEL RUN 3 85 487 87 546 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 13 UMMARY TABLE I - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) ECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE TRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BE6IN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE SQ Mil HR) (HR) (IN) (HR) (IN) FT)HR) CFS)CSM) ALTERNATE 1 STORM 25 SECTION 1 RUNOFF .04 2 2 .10 .0 5.40 24.00 2.68 12.20 61.32 1432.7 SECTION 2 ADDHYD .09 2 2 .10 .0 5.40 24.00 1.79 12.20 68.63 801.8 TRUCTURE 1 RESVOR .09 2 2 .10 .0 5.40 24.00 _ 1.39 74.89 15.46 4.84 56.5 ALTERNATE 2 STORM 50 SECTION 1 RUNOFF .04 2 2 .10 .0 6.15 24.00 3.31 12.20 75.78 1770.5 SECTION 2 ADDHYD .09 2 2 .10 .0 6.15 24.00 2.09 12.20 83.47 975.1 TRUCTURE 1 RESVOR .09 2 2 .10 .0 6.15 24.00 1.53 75.23 15.00 5.20 60.7 ALTERNATE 3 STORM 99 SECTION 1 RUNOFF .04 2 2 .10 .0 6.90 24.00 3.95 12.19 90.55 2115.7 SECTION 2 ADDHYD .09 2 2 .10 .0 6.90 24.00 2.47 12.20 9B.48 1150.5 TRUCTURE 1 RESVOR .09 2 2 .10 .0 6.90 24.00 1.68 75.67 15.49 5.66 66.1 R20 XEQ 12-13-88 14:28 KELLY SAMSEL RUN 3 85 489 87 546 JOB I SUMMARY REV PC 09/83(.2) PAGE 14 SUMMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES SECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS.......... ID SQ MI) 25 50 99 STRUCTURE 1 09 ALTERNATE 1 4.94 00 00 ALTERNATE 2 00 5.20 00 ALTERNATE 3 00 00 5.66 XSECTION 1 04 ALTERNATE ' 1 61.32 00 - .00 ALTERNATE 2 00 75.79 00 ALTERNATE 3 00 00 90.55 XSECTION 2 09 ALTERNATE 1 68.63 00 00 ALTERNATE 2 00 93.47 00 ALTERNATE 3 00 00 98.48 O FUSS&O'NEILL consulting engineers January 10, 1989 Ms. Marcia Banach Town Planner Town of South Windsor 1540 Sullivan Avenue South Windsor, Connecticut 06074 Re: Clark Corners Route 30 South Windsor, Connecticut Dear Ms. Banach: We have prepared this letter to describe the traffic impacts of the proposed Clark Corners Development in the Town of South Windsor, Connecticut. Please be advised that we are currently preparing an application to the State Traffic Commission as a major traffic generator, pursuant to State Statute 14-311. We will be incorporating the overall development plan into this traffic study, and addressing the joint impact of the Clark Corners parcel, the Town Shopping Center, and the Terry Office Park. This study incorporates all three developments since the overall development plan shows an interconnection between all driveways. This allows traffic to move internally between the three sites. As proposed, the Clark Corners Center will consist of 60, 600 S.F. of office development, 8,000 S.F. of retail development and a 4, 400 S.F. banking facility. The number of vehicles expected to be generated by this facility are shown in Table No. 1, attached. This table indicates the total number of vehicles which will be generated on an average weekday, and also during the morning and afternoon peak highway hours. It is anticipated that improvements to the intersection of Route 30 and Clark Street will be necessary in order to accommodate the site generated traffic. Additionally, improvements to Clark Street along the site frontage are anticipated. These improvements will also benefit the future reconstruction of Clark Street south of the Deming Street intersection. 146 HARTFORD ROAD / MANCHESTER, CONN. 06040 / TEL. (203) 646-2469, FAX. EXT. 307 SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING HIGHWAYS and BRIDGES• SURVEYING•LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC• PUBLIC WORKS MANAGEMENT•HYDROGEOLOGY FUSS&OTMBLL Ms. Marcia Banach January 10, 1989 Page -2- Currently, it is planned to signalize the Town Shopping Center driveway intersection with Route 30, in accordance with the State Traffic Commission certificate issued to that developer. However, we will investigate the desirability of moving this traffic signal to the intersection of Clark Street and Route 30. During our review process with the State Traffic Commission, the details of signal control on this section of Route 30 will be finalized. We welcome any input from the town regarding traffic operations in the vicinity of this development. Although the State Traffic Commission has a great deal of control over the operations on the state highways in the area, it is our intent to accommodate the town' s requirements to whatever extent possible. It is our opinion that the roadway system will be able to absorb the increase in traffic, and that safe operation of the roadways surrounding the site can be maintained following the development of the site. Of course, if you have any questions, please contact us at any time. Very truly yours, IX96 Ste hen F. Mitchell, P. E. As ociate Director of Traffic Engineering Attachment SFM:smc cc: Mr. John Samsel 88-546 0110BTRF. 10 TABLE NO. 1 Hourly Trip Generation Volumes Clark Corners South Windsor, Connecticut A.M. PEAK HOUR P.M. PEAK HOUR Enter 158 65 Exit 29 188 Total 187 253 Calculated using methodology described in "Trip Generation" published by the Institute of Transportation Engineers ( ITE) in 1987 Average weekday vehicle trip ends = 3, 170 4 W N 8t Gaily K. TyW Chief of Police SOR CO Police Services SOUTH WINDSOR POLICE DEPARTMENT CONSTRUCTION REQUIREMENTS Project Title: 89-03 P Clark Corners Date- 13, Febuary 1989 L9 1. Developer is responsible for the purchase and installation of all street and traffic signs. Any signs on or intersecting with a State Highway must be cleared through the Department of Trans- portation. All signs must be in place before a c.o. is issued. 2. Developer is responsible for the purchase of all street lighting through Connecticut Light and Power. CUP will install all lighting once they have received payment from the developer and the locations of the lights has been reviewed by the Police Department. All lighting must be in place before a c.o. is issued. 3. Developer will submit three (3) 82 x 11 or 8; by 14 maps of the proposed project to the Police Department for the purpose of j identifying and locating all signs. Completed maps will be distributed to the developer, Town Planner and the Police Department. Any changes in road design will require new maps. i 4. Temporary street signs must be in place as soon as possible and maintained throughout the project. 5. Emergency phone numbers for the duration of the construction must be provided to the Police Department on a company letter- head. If the developer occupies or owns the building/s after construction emergency numbers must be provided to the Police Department. 21 6. All buildings located on property which abutts a public highway must be numbered. Such number/s (address) shall be visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802. Barns, garages and outbuilding which are located on the same premises as a numbered structure are excluded. 7. Install traffic control signal at Clark & Ellington Road. Widen Clark Street to 30 fset of pavement from Deming Street to Ellington Road. Insta 1 entrance lane just south of proposed driveway on Clark St, aRRroximately 80 feet in lenght. Install exit lane(acceleration lane) just north of proposed driveway on Clark Street-100 feet in lenght. Re-design intersect on of Clark Street and Deming Street, for improved site distance and traffi control/ Re-design Clark street and Ellington Road intersection. 151 Sand Hill Rood 9 South Windsor, Connecticut 06074 9 (203) 644-2551 SAMSEL PROPERTIES 152 DEMING STREET SOUTH WINDSOR, CT 06074 203) 644-1157 TERRY OFFICE PARK BUCKLAND PROFESSIONAL CENTER February 20, 1989 Inland Wetlands/Conservation Commission Town of South Windsor Sullivan Avenue South Windsor, CT 06074 Re : Clark Corners and RSK-KELLCO letter, February 15, 1989 Dear Commissioners : Enclosed are my comments concerning the above letter . Item #l . At this time, we, (Mr Samsel and Mr Kelley) have no agreement concerning a connector road between Clark Corners and the Town Shopping Center or between Terry Office Park and the Town Shopping Center . Item #2 . I am sure the Planning and Zoning Commission will also require a bond from me if our site plans are approved . Item #3 . An interior road system was a very strong suggestion by town staff and the Planning and Zoning Commission. Our connector road from the Clark Corners to the Town Shopping Center simply abutted a road I believe the Planning and Zoning Commission approved on plans submitted by Town Shopping Center . The connected road from Terry Office Park to the Town Shopping Center was the result of at least two meetings with the land owners and town staff . I intend to construct and install the connector road to the property line and all other improvements as submitted immediately after approval whether or not the connector road ever becomes a reality. Item 114 . I agree that the building at 1665 Ellington Road ( the Kuehn building ) should be connected to the above mentioned interior road system and eliminate the curb cut it presently has onto Ellington Road . Enclosed is a copy of a condition I agreed to abide by when we purchased the Waldron property. SAMSEL PROPERTIES 152 DEMING STREET SOUTH W I N DSOR, CT 06074 203) 644-1 157 TERRY OFFICE PARK BUCKLAND PROFESSIONAL CENTER 2- Also enclosed is a letter from me to Richard S . Kelley dated December 28, 1988, in which I asked him if he wanted to be a part of this application concerning the connector road . To date, there has been no response from Mr . Kelley concerning his willingness to cooperate . Also enclosed is a copy of a letter of intent between the above mentioned projects to Mr . Kelley from myself . Sincerely John Samsel, Jr . Encl : ( 2 ) CLARK CORNERS ASSOCIATES Richard L. Mahoney 152 Deming StreetMelvynB. Marks South Windsor, CT 06074 John Samsel, Jr. 203) 644-1157 FAX: (203) 644-5992 February 20, 1989 Richard S . Kelley 1744 Ellington Road South Windsor, CT 06074 Re : Clark Corners Associates Letter of Intent Dear Dick, This is my letter of intent to allow a cross easement of vehicular and pedestrian traffic between the proposed Clark Corners and Town Shopping Center when both projects receive both Local and State approvals . Sincerely, John Samsel, Jr . Clark Corners Associates SAMSEL PROPERTIES 152 DEMING STREET SOUTH WINDSOR, CT 06074 203) 644-1157 TERRY OFFICE PARK BUCKLAND PROFESSIONAL CENTER February 20, 1989 Richard S . Kelley 1744 Ellington Road South Windsor, CT 06074 Re : Terry Office Park Letter of Intent Dear Dick, This is my letter of intent to allow a cross easement of vehicular and pedestrian traffic between Terry Office Park and Town Shopping Center when both projects receive both Local and State approvals . Sincerely, 1 John Samsel, Jr . 4ow N sE4To-wn o-P SoatA ?dZnd416'0tOc m 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-C AREA CODE 203/644-2511 February 27, 1989 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM:Michael J. Gantick, Director of Public Works / A RE: Clark Corners - Engineering Review Please be advised that this Department has received the subject plans dated 1/9/89 and the following comments are noteworthy: 1 . In general the plans are lacking elevation data necessary to fully evaluate how the drainage will function, i .e. , water elevation of existing pond, bottom elevation of proposed pond, spot elevations along parking areas, adjacent to buildings, walkways, drainage swale, connection to Town Center at intersection of Clark Street, etc. . . . . Topo references should be provided. 2 . Details of materials of construction are missing for pond, leak-offs (reverse filter design) , sanitary sewer appurtenances, outlet structures, pipes, walkways, etc. . . 3 . Drainage from parking areas is proposed to discharge via leak-offs . Concern regarding erosion control and containment of sediment/sand prior to discharge to ponds and swale. 4 . Details of connection to the Town Shopping Centre and modifications to the existing detention pond should be provided. 5 . Both the wetland and non-wetland soils for the site indicated seasonally high groundwater tables at or near the surface and in general the soils are considered unsuitable for roadway fill or road construction. Design as submitted does not appear to address soil site conditions . Marcia A. Banach Clark Corners February 27 , 1989 6 . Roof leader drainage should be shown. 7 . Inlet/outlet drainage protection should be provided. 8 . Guiderailing may be needed along access road near stream. 9 . Consideration of locating sanitary and water in Clark Street should be examined. 10 . Improvements along Clark Street and at Deming/Clark should be consistent with the Clark Street Preliminary Engineering plans . Provide for realignment of Deming/Clark intersection, improvement @ Ellington/Clark 11 . Physical features should be shown for the west side of Clark Street and the south side of Deming Street along the project limits . 12 . The topo map shows a 24" RCP under Ellington Road, yet the drainage calcs analyze a 15" RCP. Should be clarified. 13 . It is unclear as to whether the proposed detention pond includes flows from the impacted Town Shopping Center detention pond, including drainage calculations . 14 . It appears that under the proposed 50 and 100 year storms, flooding across Ellington Road may occur. Outlet flood/storm stage data should be clarified relative to existing/proposed elevations . Overflow structure should be provided for proposed pond. 15 . Details for the proposed pond have not been provided, i .e. cross section/depth, materials of construction. As the pond will entail cuts the concern relative to seepage/stabilization should be evaluated. The maintenance and function of a "live" pond versus a dry pond should be clarified. Pond could be asset to proposal if designed/constructed properly. Once the plans have been modified this Department will re-review them in detail . Should you have any questions please feel free to contact me. MJG/jsv cc: Project File 4o+'M 84N U 7-0-w'n O-P S-11twitth ?A 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR,CO AREA CODE 203/644-2511 February 27 , 1989 Mr. John G. Samsel, Jr. 152 Deming Street South Windsor, CT 06074 re: Appl . #89-03P, Clark Corners Site Plan Gentlemen: Please be advised that the public hearing in the above matter has been scheduled for Tuesday, March 14, 1989 at 8: 00 P.M. in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue. Signs advertising the hearing must be posted for 10 consecutive days prior to the hearing, and must be clearly visible from the road. Please have them posted by Friday, March 3, 1989 . One sign should be placed on the easterly side of Clark Street and one on the southerly side of Ellington Road. Signs can be purchased in the Town Hall for $5 . 00 each. Very truly yours, PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. Chairman cc : PZC File Applicant Engineer M. Banach, Dir. of Planning Lr) ° h ru V —7 II ru LL 2 SENDER: Complete Items 1 and 2 when additional services are desired, and complete Item_ s 3 and 4. Put your address in the "RETURN TO" Space on the reverse side. Failure to do this will prevent this card from being returned to you. The return receipt fee will Provide You the name of the person delivered to and the date of delivery. For additional fees the following services are available. Consult postmaster for fees and check box(es)for additional servlce(s) requested. 1. Show to whom delivered,date,and addressee's address. 2. Restricted Delivery 1(Extra charge)1 1(Extra charge)1 Article Addressed to: 4. A le Number ibw Q t-f n1 S r h EL J a L 5- 09 Type of Service: registered El Insured Certified COD O l _iP O P r 0 o74 Express Mall IW 1'J 7 C Always obtain signature of addressee 1 or agent and DATE DELIVERED. 5 Sin ture—A Jdr ss 8. Addressee's Address(ONLY if X requested and fee paid) K Signature—Agent X 7. Date of eli r PS Form 3811, M .1987 t ILS.MP.O.1967-178-268 DOMESTIC RETURN RECEIPT PLANNING DEPARTNENT IN-HOUSE REFERRAL FORK TO: Karl Reichle, Mike Gantick, Mel Stead, Fred Shaw, Richard J. Sartor, Gary Tyler, Fire Marshall Lanning, Jim Snow FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project:# 7 - C; -p Zoned- Acreage i Subdivision Site Plan Residential_ No. of Lots/units Commercial_ Industrial Location:C i 1 ne, ' f r V S ( 16LLk S /,10 ',V,c . Project Description: yV,,,«: , , u,l La ;u_, e Tu,,( - ? L'Tri,% e, 41 Future Town-owned property involved? Yes Now - a)new streets existing frontage also) b)new open space/recreation area active passive c)new detention area Planning Department comments Please let me know by 4'' v I'1 if you will have comments on this application so that I can follow up with your department when I do a Planning D partment report. vl c s 7-awt-1 O-P sloam ?&U&0 t 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 tiosoR coN' AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER THURSDAY, MARCH 2, 1989 THURSDAY, MARCH 9 , 1989 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION Notice is hereby given that there will be a public hearing of the Planning and Zoning Commission on Tuesday, March 14 , 1989 at 8 : 00 P.M. in the Council Chambers of the South Windsor Town Hall to consider the follow.i.n§. 1 . Appl . 89-03P, John G. Samsel, Jr. for a Site Plan of Devel pment fo,r'` property at southeast corner of Ellington Road a d C;-rk Street intersection, RC Zone. 2 . Appl . #89-09P, Burnham Business Park Associates for Amendments to Zoning Regulations, Sections 4 .7 . 2 .8, 5 . 2, - 8 . 3, and 8 . 4 to allow for office building not exceeding 5 feet in height, developed in a park-like setting along p of the I-291 corridor in the Industrial Zone. Copies of the applications and maps more clearly defining the properties and the proposed amendment are on file in the office of the Town Clerk and/or the Planning Department of the Town of South Windsor. At this hearing, interested persons may appear and be heard, and written recommendations will be received. PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. , Chairman Marshall Montana, Secretary 10"'X sf4< Qs vzn 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 Osoa•c0 AREA CODE 203/644-2511 March 14, 1989 John G. Samsel, Jr. 152 Deming Street South Windsor, CT 06074 RE: Application #89-03P - Clark Corners Dear Mr. Samsel : At the March 13 , 1989 meeting of the South Windsor Inland Wetlands Agency/Conservation Commission, the Commission voted to deny without prejudice, Application #89-03P. You may re-apply at any time taking into consideration the concerns expressed by the Agency. The concerns expressed by the Agency are: 1 . There could be a feasible and prudent alternative which would have less impact on the wetlands and watercourse. 2 . The internal roadway, including crossing the stream, seemed to have an excessive impact on the wetlands . 3 . Significant impact on the wetlands as a result of the number of buildings , roadways, and parking lots . 4 . Significant amounts of fill to be placed in regulated area, much of it in wetlands areas . Very truly yours, John rM. Moran, J . Chairman Inland Wetlands Agency/ Conservation Commission JMMJr/pmm j cc: Marcia A. Banach, Director of Planning Michael J. Gantick, Director of Public Works John R. Collins, Chief Building Official Raymond Hallowell, Chairman, P&ZCommission Jerry Iazzetta, Town Engineer A. Bowen Davies , Deputy Town Engineer CLARK CORNERS ASSOCIATES Richard L. Mahoney 152 Deming Street Melvyn B. Marks South Windsor, CT 06074 John Samsel, Jr. 203) 644-1157 FAX: (203) 644-5992 Raymond Hallowell, Chairman South Windsor Planning and Zoning Commission South Windsor Town Hall 1540 Sullivan Ave . South Windsor, Connecticut 06074 RE: Clark Corners Application #89-03 Dear Mr . Hallowell, With regrets, at this late hour, I wish to with- draw our application #89-03 from tonights agenda. Thank you very much for your courtsey. Sincerely, e- John Samsel, Jr. Clark Corners Associates