Loading...
HomeMy WebLinkAbout162 Cornerstone Drive (4)s 1169 ELLINGTON ROAD SOUTH WINDSOR,CT.06074 PH.860-289-7055 FAX.860-289-7121 LIC#01028 9/23/02 TOWN OF SOUTH WINDSOR CHRISTOPHER J.DOUGAN,DEPUTY CHIEF BUILDING OFFICIAL 1540 SULLIVAN AVENUE SOUTH WINDSOR,CT.06074 RE: DECK COLUMN FOOTINGS DEAR MR.DOUGAN, IN RESPONSE TO YOUR LATER DATED AUGUST 26,20029 MANNARNO BUILDERS, INC.IS QUITE EMBARRASSED BY THE CIRCUMSTANCES THAT HAVE LED TO OUR OWN PROCEDURES.IT IS NOT OUR POLICY TO EXCAVATE THE PIERS AT A SHORTER DEPTH THAN'IS`REQUIRED BY CODE. IN ORDER TO CORRECT THIS PROBLEM WE HAVE IMPLEMENTED A PLAN TO REQUIRE THAT ONE OF OUR SUPERVISORS,ALONG WITH THE TOWN Of SOUW WINDSOR INSPECT ANY AND ALL PIERS BEFORE CONCRETE IS PLACED INTO TSE SODOM. TUBE. ALTBQ OUR ACTIONS HAVE NO EXCUSE,WE STRONGLY FEEL THAT THE BREAK DEI' 0Wfl QUALITY DECK PIERS STARTED AT LOT#15 CORNERSTONE DRIVE AND PROCDE T "T#16 CORNERSTONE DRIVE.THESE PIERS WERE THE ONLY ONES DUG IN THE WI1tTER/SPRING/SUMMER OF 2002 AND AT THIS TIME OUR BACKHOE WAS NOT IN WORKING ORDER.WHILE THIS IS NOT AND EXCUSE I FEEL THAT THESE TWO HOUSES NEED TO BE LOOKED AT. IN REGARADS TO THE BALANCE OF THE HOMES ON CORNERSTONE DRIVE,IT WAS OUR POLICY TO DIG THE PIERS WITH THE BACKHOE AND 94 MANY CIRCUMSTANCES ON THE EAST SIDE OF THE STREET THE PIERS ARE 6'TO 8'DEEP DUE TO FILL PLACEMENT. WE PROPOSE TO INVESTIGATE THE PIERS AT LOT#15 CORNERSTONE DRIVE. ONCE WE HAVE EXCAVATED THEM WE WILL CALL FOR AN OFFICIAL INSPECTION.IT IS MY UNDERSTANDING THAT LOT#161S PIERS OR PIER WAS INSUFFICIENT AND THAT THE HOME OWNER IS ADDRESSING THE SITUATION THROUGH LANDSCAPING MEASURES. IN CLOSING,IT IS VERY IMPORTANT TO MANNARINO BUILDERS,INC.TO HAVE A POSITIVE RELATIONSHIP WITH THE TOSW BUILDING DEPARTMENT. WE HOPE MOVING FORWARD IN THE PROPER MANNER THAT WE CAN EVENTUALLY GAIN YOUR DEPARTMENTS CONFIDENECE IN US. SINCERELY, 41--002 ROBERT MANNARIN CELL# 860-416- yy I Y Ve