Loading...
HomeMy WebLinkAbout16 Kelly Road (2)SITE COMPLIANCE CHECKLIST TOWN of SOUTH WINDSOR, CONNECTICUT 16 KELLY ROAD LOT_# a Reviewed By '3 Engineering) CHARLES L. HULSTEIN Date Reviewed r /Denied 10 SUGAR HILL ROAD,ELLINGTON,CT Reviewed By anning) BP_#_29270_ Ph_#_871-2236 Date Reviewed 4! a3 rov /Denied Date Submitted 00/00/00 FOR C o O ***** As required in the Zoning and/or Subdivison Regulations, no Certificate of Occupancy shall be issued until grading plans have been complied with and approved by the Town Engineer. The minimum requirements shall include: Approved Denied N/A RECEIVED 1. Approved building permit plan JUN 0 5 2003 i/ 2. Finish grading per approved SOUTH WINDSOR PLANNING DEPT.building permit plan 3. Site work; i.e. trees, shrubs, dumpsters, required parking 4. Utility location; a. sanitary sewer/septic system b. foundation drain c. electrical & telephone d. water e. other 5. Sewer connection charge paid 6. Appropriate certification 7. Bonding V 8. Planning & Zoning/ Inland Wetlands Considerations A. Lighting B. Signage Freestanding Wall C. Fee in lieu of Open Space Sewer Permit No. Pav Exc # 60h0 StatusCOMMENTS: Ce it 0 k f ClV1V