HomeMy WebLinkAbout16 Kelly Road (2)SITE COMPLIANCE CHECKLIST
TOWN of SOUTH WINDSOR, CONNECTICUT
16 KELLY ROAD LOT_# a Reviewed By '3 Engineering)
CHARLES L. HULSTEIN Date Reviewed r /Denied
10 SUGAR HILL ROAD,ELLINGTON,CT Reviewed By anning)
BP_#_29270_ Ph_#_871-2236 Date Reviewed 4! a3 rov /Denied
Date Submitted 00/00/00 FOR C o O *****
As required in the Zoning and/or Subdivison Regulations, no Certificate of
Occupancy shall be issued until grading plans have been complied with and
approved by the Town Engineer. The minimum requirements shall include:
Approved Denied N/A RECEIVED
1. Approved building permit plan JUN 0 5 2003
i/ 2. Finish grading per approved SOUTH WINDSOR PLANNING DEPT.building permit plan
3. Site work; i.e. trees, shrubs,
dumpsters, required parking
4. Utility location;
a. sanitary sewer/septic system
b. foundation drain
c. electrical & telephone
d. water
e. other
5. Sewer connection charge paid
6. Appropriate certification
7. Bonding
V 8. Planning & Zoning/
Inland Wetlands Considerations
A. Lighting
B. Signage
Freestanding Wall
C. Fee in lieu of Open Space
Sewer Permit No. Pav Exc #
60h0 StatusCOMMENTS:
Ce
it 0 k
f ClV1V