HomeMy WebLinkAbout1535 John Fitch Boulevard (25)A Division of
Eastern
Materials
Testing
y FIELD REPORTLaboratory
JAWORSKI
Project: G&R Marine Client: PDS Engineering
GEOTECH, INC.
South Windsor, CT Contractor: PDS Engineering
Project No.: 00512C Weather:partly sunny
Date: July 21, 2000
Purpose:To provide construction monitoring services to evaluate by observation and/or by
testing whether work generally conforms to project plans.
Contractor Activities:
Upon this writer's arrival, it was observed that Paul Morin Construction prepared the area
shown on the attached Field Sketch. The foundation footing and rebar appeared to conform
to project plans and specifications. Subsequently, 8-cubic yards of 3,000-psi concrete was
placed by means of the truck chute, then manually worked into place and finished with hand
trowel.
JGI Activities:
Reinforcing steel was reviewed prior to today's concrete placement. The steel was observed
to be placed in general accordance with project drawings.
One set of Concrete compressive strength test cylinders was fabricated from today's concrete
placement in accordance with ASTM C 31. Refer to the Concrete Strength Test Summary of
this date for details.
The General Contractor was notified of these results prior to JGI's departure from the site.
Prepared by: B. Harris
Reviewed by: Date: 7/27/00
TEST RESULTS DO DO NOT COMPLY WITH SPECIFICATIONS
ARE NOT COMPLETE OR X ARE NOT APPLICABLE
A DEVIATION REPORT IS ATTACHED X IS NOT ATTACHED HAS BEEN AMENDED AND
IS ATTACHED
OBSERVED CONSTRUCTION X DOES DOES NOT COMPLY WITH SPECIFICATIONS
IS NOT COMPLETE NOT APPLICABLE
The information stated on this report may not be reproduced except in its entirety without the express written consent of
Eastern Materials Testing a division of Jaworski Geotech, Inc. Use of the NVLAP designation does not represent
endorsement by the NIST or NVLAP. Reports are relevant only to items tested and no other attribution may be made.
FIELD SKETCH
Project: Eastern
Materials
TestingojectNo.: OD JS/a Date: -7 Laboratory
a Division ofJaworski Geotech, Inc.
i
I .
N
I
r- F-2
I I
II II
I I
I I
I
2*
116 Mml%
I II
J
I I a6 FWRI FJ 1
I I zI6"X11,4 TE w/
6
jI
1 a 8/8 MNm I I
I I
Il 2
i/ f z
n Qf
A Division of
Eastern
Materials
Testing
Laboratory FIELD REPORT
JAWORSKI
Project: G&R Marine Client: PDS Engineering
GEOTECH, INC.
South Windsor, CT Contractor: PDS Engineering
Project No.: 00512C Weather:cloudy, 82 degrees F
Date: July 24, 2000
Purpose:To review concrete construction, fabricate specimens for strength testing, and
observe placement of reinforcing steel.
Contractor Activities:
Upon this writer's arrival, it was observed that Paul Morin Construction prepared a
foundation wall for concrete placement. The rebar appeared to conform to project plans and
specifications. Subsequently 9-cubic yards of 3,000-psi concrete was placed by means of the
truck chute, vibrated and finished with a hand trowel.
JGI Activities:
Reinforcing steel was reviewed prior to today's concrete placement. The steel was observed
to be placed in general accordance with project drawings.
One set of Concrete compressive strength test cylinders were fabricated from today's
concrete placement in accordance with ASTM C 31. Refer to the Concrete Strength Test
Summary of this date for details.
The General Contractor was notified of these results prior to JGI's departure from the site.
Locations of today's project activities are illustrated on the attached Field Sketc ,i""1`i"'%
Prepared by: B. Harris
i Date: 7/28/00Reviewedby: st
fit
TEST RESULTS DO DO NOT COMPLY WITH SPECIFICATIONS
ARE NOT COMPLETE OR X ARE NOT APPLICABLE
A DEVIATION REPORT IS ATTACHED X IS NOT ATTACHED HAS BEEN AMENDED AND
IS ATTACHED
OBSERVED CONSTRUCTION X DOES DOES NOT COMPLY WITH SPECIFICATIONS
IS NOT COMPLETE NOT APPLICABLE
The information stated on this report may not be reproduced except in its entirety without the express written consent of
Eastern Materials Testing a division of Jaworski Geotech, Inc. Use of the NVLAP designation does not represent
endorsement by the NIST or NVLAP. Reports are relevant only to items tested and no other attribution may be made.
FIELD SKETCH
Project: Eastern
Materials
0 S/a Date:
TestingamrojectNo.: G Laboratory
a Division ofJaworski Geotech, Inc.
ILI
N N
I IWA4 I I
I t
I I F-2
i l
I I
I I
I
F-z:
6 MON\
I I i l l
J
II
I I
6 wu2PM
I I zICOW-elf 5-V w/ F-z
6%b 8/8 WW.m I I
I I
I I
I I 2
iol-n
cv cr I I
t
it Q T' " n
c
f
A Division of
Eastern
Materials
Testing
Laboratory FIELD REPORT o •••• ro•ooa o
JAWORSKI
Project: G&R Marine Client: PDS Engineering
GEOTECH, INC.
South Windsor,CT Contractor: PDS Engineering
Project No.: 00512C Weather:sunny
Date: August 3, 2000
Purpose:To perform field density testing.
Contractor Activities:
Upon this writer's arrival, it was noted that there was no contractor or representative present
on site. Observations indicated that the slab on grade had been prepared for slab placement.
Compactive efforts were not witnessed by JGI.
This writer performed density tests on the interior slab on grade sub-soils.
JGI Activities:
Six field density tests were performed on previously prepared earthwork using a nuclear
density gauge in general accordance with ASTM D 2922. The test results indicated that the
specified 95% minimum compaction requirement had been achieved as compared to ASTM
D 1557 test methods. Please refer to the attached Field Density Test Summary for individual
test data.
Locations of today's project activities are illustrated on the attached Field Sketch.
Prepared by: M. Brigandi
Reviewed by: Date: 8/14/00
TEST RESULTS X DO DO NOT COMPLY WITH SPECIFICATIONS
ARE NOT COMPLETE OR ARE NOT APPLICABLE
A DEVIATION REPORT IS ATTACHED X IS NOT ATTACHED HAS BEEN AMENDED AND
IS ATTACHED
OBSERVED CONSTRUCTION DOES DOES NOT COMPLY WITH SPECIFICATIONS
IS NOT COMPLETE X NOT APPLICABLE
The information stated on this report may not be reproduced except in its entirety without the express written consent of
Eastern Materials Testing a division of Jaworski Geotech, Inc. Use of the NVLAP designation does not represent
endorsement by the NIST or NVLAP. Reports are relevant only to items tested and no other attribution may be made.
Eastern Division of
Materials
Testing
Laboratory FIELD DENSITY TEST SUMMARY
JAWORSK
GEOTECH. INC
Project: G&R Marine Client: PDS Engineering
South Windsor,CT Contractor: PDS Engineering
Project No.: 00512C Weather: sunny
Date: 8/3/00
Max Optimum Field Field
Dry Moisture Dry Moisture Spec
Test Lift or Density Content Density Content Percent Minimum
No. Location Elevation JGI Lab No. pcf) pcf) Compaction Compaction
1 See Field Sketch GBS C977-00 134.1 7.2 133.3 7.9 99:4:::::::: 95
2 See Field Sketch GBS C977-00 134.1 7.2 132.4 8.3 98:;7 95
3 See Field Sketch GBS C977-00 134.1 7.2 132.0 8.5 98.:4: ::::: 95
4 See Field Sketch GBS C977-00 134.1 7.2 127.9 7.2 95::4.%*.'.*.'.'. 95
5 See Field Sketch GBS C977-00 134.1 7.2 128.6 7.6 9.::9: ::. 95
6 See Field Sketch GBS C977-00 134.1 7.2 134.0 7.8 99 9. ::::: 95
MATERIAL DESCRIPTION:
C977-00-brown C-F SAND,C-F GRAVEL,little Silt
NOTE:
FIELD SKETCH
Project: G&R Marine East rn
Em Materials
Testing
Project No.: 0 0 512C Date:3 d Laboratory
QtG'Ai 1 a Division ojJaworski Geotech, Inc.
IIV
l
11
1
1
i
I r---- ---
i r
I I F-2
I I I I
I I
I I
J l
6 NNIMN I
W/
I bxd8/8WWM ! I
I
I I 2
I I
J
in,oil 3• 1
a1. cl_.
i
I
i
A Division of
Eastern
Materials
Laboiratory FIELD REPORT
JAWORSKI
Project: G&R Marine Client: PDS Engineering GEOTECH, INC.
South Windsor, CT Contractor: PDS Engineering
Project No.: 00512C Weather:sunny, 77 degrees
Date: August 8, 2000
Purpose:To review concrete construction and fabricate specimens for strength testing.
Contractor Activities:
Prior to this writer's arrival, PDS Engineering had prepared the building for slab on grade
placement. Subsequently, Tilcon delivered 50-cubic yards of 3,000-psi concrete directly
from the chute into the designated areas where it was raked level, bull floated, and hand
troweled to finish.
JGI Activities:
Concrete compressive strength test cylinders were fabricated from today's concrete
placement in accordance with ASTM C 31. Refer to the Concrete Strength Test Summary of
this date for details.
Locations of today's project activities are illustrated on the attached Field Sketch.
Prepared by: N. Teodoro
Reviewed by: Date: 8/11/00
TEST RESULTS DO DO NOT COMPLY WITH SPECIFICATIONS
ARE NOT COMPLETE OR X ARE NOT APPLICABLE
A DEVIATION REPORT IS ATTACHED X IS NOT ATTACHED HAS BEEN AMENDED AND
IS ATTACHED
OBSERVED CONSTRUCTION X DOES DOES NOT COMPLY WITH SPECIFICATIONS
IS NOT COMPLETE NOT APPLICABLE
The information stated on this report may not be reproduced except in its entirety without the express written consent of
Eastern Materials Testing a division of Jaworski Geotech, Inc. Use of the NVLAP designation does not represent
endorsement by the NIST or NVLAP. Reports are relevant only to items tested and no other attribution may be made.
FIELD SKETCH
Eastern
oject: G&R Marine Em Materials
Testing
oject No.: 00512C Date:Laboratory
a Division ojJaworski Georech, Inc.
i
N
N
i
Z---- ---- r--,----- ----
1' 1
F-
t.a.,•na GT
I I I I 2
I f2
I I I
I I i
I I F-2
I J I
I
2I
F-2
I I
i
g i•
N
I I I I I
I b"r Rf;tE w/ F-Z
8/ WWM i (
GNf?OL Nf(F-2
I I
IIII
I 2
I F2
11
N
i I I
r--- ----
t----- --- — J
Q'
t
A)c
N