HomeMy WebLinkAbout153 Cornerstone Drive (2)DEPARTMENT DECISION APPLICATION FOR HVAC PERMIT
Applicati reby:
TOWN OF SOUTH WINDSOR
PERMIT# F
BUILDING DEPARTMENT UVO
APPROVE 1540 SULLIVAN AVENUE Bldg.Permit#
Z
644-2511 ext. 230 07 a l3
ate B ing Inspector
Application must be printed or typed
FEE SCHEDULE S3 Location of Job:
ZANZA\) eorN (5t6m
0-$1,000=$15.00 Stree o. Street Lot No.
Over$1,000=
15.00 per$1,000
or any fraction thereof Tenant Designation Apt.No.
APPLICANT G1N3)Q< kea4 i-,N16 el3'J;1,-N6
APPLICANT ADDRESS /Yd 1 L(jetJ r see
Eay} Wv6rnoudooi ass ajn_28'
APPLICANT PHONE# t1( rds '' 6
OWNER Qr2-G6&K,
OWNER ADDRESS
a. OWNER PHONE 4 12 y 9901
C ESTIMATED COST$
1 V
IS THIS A CONTRACT COST? Yes No
FEE ENCLOSED$
r11r TYPE OF JOB:dSOR-C New Installation
Alteration/Additiow Repair
a
Revised 4/01//2002
APPLICATION FOR HVAC PERMIT (Continued from reverse side)
TYPE OF SYSTEM: TYPE OF BUILDING:
CHEATING PRESIDENTIAL
W,A/C COMMERCIAL
VENTILATION INDUSTRIAL
HEATING
STEAM LOW PRESSURE LIMIT LBS. HIGH PRESSURE LIMIT LBS.
Z41YDRONIC WARM AIR UNIT RADIANT HEATER
E STING RADIATION ADDITIONAL RADIATION TOTAL RADIATION
DESIGN TEMP. OUTSIDE OF INSIDE OF DIFFERENCE G °F
TOTAL HEAT LOSS(BTUH) YC OQOF(HEAT LOSS SHEET MUST ACCOMPANY
APPLICATION)
DESCRIBE ALL HEATING EQUIPMENT(INCLUDING M &MODEL NO.) . ^_ '
iD i t e V c (. C r ° tq*
Ou, s tao- G.tr-
GROSS HEATING CAPACITY(INPUTBTUH) Y NET RATING(OUTPUT—BTUH) Fy6G o
TYPE OF FUEL
OIL—GPM OIL TANK LOCATION:INSIDE OUTSIDE CAPACITY
A GAS—INPUT trb co LPG TANK CAPACITY ELECTRIC—KW
AIR CONDITIONING ,
DESIGN TEMP.OUTSIDE OF INSIDE 7 OF DIFFERENCE L3 OF
TOTAL HEAT GAIN(BTUH) 5l sv (HEAT GAIN SHEET MUST ACCOMPANY APPLICATION)
DESCRIBE ALL COOLING EQUIPMENT(INCLUDING MAKE&MODEL NO.)
TONNAGE I jc COOLING CAPACITY(BTUH) Ya,,
VENTILATION
DESCRIBE ALL AIR HANDLING EQUIPMENT(INCLUDING KITCHEN EXHAUST EQUIPMENT)
TOTAL SIZE OF SYSTEM(CFM) FRESH AIR INTAKE(CFM)
PLANS MUST ACCOMPANY APPLICATION)
FURTHER DESCRIPTION OF WORK
THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO
COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE
PERFORMANCE OF SUCH WORK.
CONTRACTORS LICENSE NO. TYPE STATE
SIGNATURE OF APPLICANT G DATE
4.
4:
RIGHT-J LOAD AND EQUIPMENT SUMMARY
Enure House
DEBLOK HTG/COOL Ob' I!)1
141 ALLEN ST,EAST LONGMEADOW,MA Pham:413-525-8609
ProAect Information
For:
Notes: F'v e4 c e cr i- vvistAt A•lr-
tr 60tcf(er"5 Cor-S .
Design Information
Weather: Hartford, Brainard Field, CT, US
Winter Design Conditions Summer Design Conditions
Outside db 6 OF Outside db 88 OF
Inside db 70 OF Inside db 75 OF
Design TD 64 OF Design TD 13 OF
Daily range M
Relative humidity 50 %
Moisture difference 28 gr/lb
Heating Summary Sensible Cooling Equipment Load Sizing
Buildin heat loss q iX Btuh Structure. -r" Btuh
Ventilation air 0 cfm Ventilation 0 Btuh
Ventilation air loss 0 Btuh Design temperature swing 3.0 OF
Design heat bad Btuh Use mfg.data n
Rate/swing multiplier 0.93
Infiltration Total seas. equip. bad Btuh
Method Simplified Latent Cooling Equipment Load SizingConstructionqualityAverage
Fireplaces 0 Internal gains 2990 Btuh
Ventilation 0 Btuh
Heatin Co758 infiltration 4028 Stuh
Area(W)3451 Total latent equip. load 7018 Btuh
Volume(W) 32136 32136
Air changes/hm 0.7 0.4 Total equipment load 48642 Btuh
Equiv.AVF(cfm)376 215
Heating Equipment Summary Cooling Equipment Summary
Make Make
Trade Trade
Efficiency q.416 4FUE Efficiency 0.0 EER
Heating input 0 Btuh Sensible cooling 0 Btuh
Heating output 0 Btuh Latent cooling 0 Btuh
Heati temp rise 0 OF Total cooling 0 BtuhAaue11gfancfmActualcoolingfanfm
Heating air flow factor 0.0:i2 cfm/Btuh Cooling air flow factor 0.0b;3 cfm/Btuh
Space thermostat Load sensible heat ratio 86 %
Prirdout certified by ACCA to meet all requirements of Manual J 7th Ed.
Awnghtsaf'tr Right-Suete Resldwtislr"5.0.38 RSRRUD25387
aood7.nr P*w 1
S.
RIGHT4 SHORT FORM
Entire House
DEBLOK HTG/COOL Job:
141 ALLEN ST,EAST LONGMEADOW,MA Phone=413-525-MM
Project Information
For.
Design •
Htg Clg lnflltmeon
Outside db(OF) 6 88 Method Simplified
Inside db(OF) 70 75 Construction quality Average
Design TD(°F) 64 13 Fireplaces
Daily range M
Inside humidity(%) 50
Moisture difference(gNlb) - 28
HEATING EQUIPMENT COOLING EQUIPMENT
Make ,(JF/L 1 L/riKJ Make R tjob
Trade Trade
0 3 row uw1r5
Efficiency 957,AFUE Efficiency 1A.0 EER
Heating input 49,v0 0 Btuh Sensible cooling 0 Btuh
Heating output f&,w0 Btuh Latent cooling 0 Btuh
Heating temperature rise 0 OF Total cooling 0 Stuh
Actual heating fan 80-9 cfm Actual cooling fan 11 :fm
Heating air flow factor cfm/Btuh Cooling air flow factor 0.063 drn/Btuh
Space thermostat Load sensible heat ratio 86 %
ROOM NAME Area Htg load Clg load Htg AVF Clg AVF
f ) Btuh) Btuh) cfm) cfm)
FAMILY ROOM 120 yro 57/04 1 op f
MUDROOM o c oo S-o0' 8S' y4
r
sfvpy 300 21 4 13S-
KITCHEN 240 2416 3431 78 184
FOYER 168 3557 805 115 43
DINING ROOM S-y WOO 00 r/
BEDROOM 4 165 3172 2575 102 138
BATH/CLOSET 011 9wi ly as J 1 9Z
HALUBATH STAIRS 121 1348 355 44 19
BEDROOM 3 192 3020 1221 98 65
BEDROOM 2 168 3288 1690 106 90
HALL BATH 60 841 221 27 12
MASTER BEDROOM 3100 1 S 1bS'
Printout certified by ACCA to meet all requirements of Manual J 7th Ed.
WrIght5oft Right-Suke Residential)-5.0.38 RSRRU026387
AM w*dl.rsr Pape 1
MASTER CLOSET 88 710 188 23 10
MASTER BATH 152 4635 2416 150 129
Entire House d
r
Ventiiatbn air 0
41624Equip.0 0.93 RSM 7018Latentcooling
TOTALS u iC, 51, f` II/V s
Printout certified by ACCA to meet all requirements of Manual J 7th Ed.
at \ rightSoft ffigM-Suite Reside-Mal-5.0,38 RSRRUD28387 2W1-WOv-12 11:11:18
AM, PrejWl.rar Pape 2