Loading...
HomeMy WebLinkAbout15 Austin CircleElectric # I S 3 APPLICATION FOR BUILDING PERMIT Plumbing#C0 15 Pau s t i n Circle WAC # 28070 Date: 2 -0 t Sprinkler# N0• FINAL APPROVALS 0 TITO Estimated Cost $ l 6,0 o o Building COMPLETE RED BOXED AREAS Permit Fee j Engineering TYPE OR PRINT ONLY Occupancy FeeAffidavitSIGNONREVERSESIDEAppr.for C Total Fee 3 , TO BUILDWG ARTMENT,TOWN OF SOUTH WINDSOR,CT Additional Cost) $ The undersigned hereby applies to do work according to the following specifications: Job Location 15 0U S 1-Ovv Ci fz Lot No. Side of Street Zone Applicant '54-A r - 4o M t rpl P 0 o Mye, ckt x- Tel#_ r?G' 2?'7 z /o (q Address P O 1>o x 5-4 v e (Wo ry c_T Zip 69'60 6 c) Lic.#re L/3 Z Owner k 4 P i n a(w a 2 a(S Address 1 S AS L 2 , S , lv n of so n Architect Address Sq.Ft.New Area: 1st FI. 2nd FI. 3rd Fl. Total New Area Rooms Lavatories Bathrooms Garages Purpose of this permit: 'r4 d 1 o L City Water 0 Well Septic System 0 Sewer Ins. H.O. S.P. Cert. Area Basement Garage Approved by Date - -d Use Group Construction Type 58 Revised 1197 I hereby agree to conform to all the requirements of the Laws of the State of Connecticut and the Ordinances of the Town ofSouthWindsorandtonotifytheBuildingInspectorofanyalterationintheplansorspecificationsoftheBuildingforwhichthis permit is asked,and agree that this building is to be located the proper distance Irom all street lines,side yard lines,and required distances from all other zones and is located in which thisb ' ng and its s is allowed. Signed I hereby apply for a Certifica of Occupanc a0e work descr' in this application for the permit. Signed DO NOT W E BELOW THIS LINE INSPECTION COMMENTS Inspection / Approval Date By Appl Code Description Due Whom Code Comment 28070-B 10,000 B01 FOOTING 08/07/01 CJD A LEFT TICKET B03 FRAMING (ROUGH) 10/10/01 CJD A W/CONTRACTOR P03 ROUGH 11/16/01 CJD A FLOOR NEEDS TO BE INSULATED TO R30 E03 ROUGH 12/04/01 CJD D INCOMPLETE-NEED TO MEET ELECTRN. ON SITE E03 ROUGH 12/07/01 CJD D WIRE NUTS, NAIL PLATES, NEED SOMEONE TO MEETT INSPECTOR ON SITE FOR NEXT INSP. E03 ROUGH 12/12/01 CJD A B04 INSULATION 12/14/01 CJD A W/START B10 FINAL 01/16/02 CJD D ROMEX IN BSMT. MUST PASS THROUGH FRAMING NOT ON LOWER FACE, SMOKES,GFI @ ISLD. COUNTER B10 FINAL 01/25/02 CJD A W/CONTRCTR. B10 FINAL 01/25/02 CJD A CLOSED OUT. 17537-E 2,000 10868-P 1,900