Loading...
HomeMy WebLinkAbout140 Commerce Way (9)Lo TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING COMMISSION APPLICATION FORM APP• No. Date Received: k•k IMPORTANT: Action ndme By: Planning and Engineering Department staff require 14 days to determine application Receipt No. completeness. To ensure receipt of a complete application by PZC, it is stronqly recommended that the application be submitted 14 days prior to the Regular Meeting at which it will be received. APPLICANT: JFI Associates Inc ADDRESS: P.O. Box 1061 X-JP-' OWNER OF RECORD ON LAND RECORDS TELEPHON ADDRESS: P.O. Box 1061 South Windsor, CT JUN 14 1988 COMPLETE LOCATION OF PROPERTY: 14.0 Commerce Way Lots 35 & a 36 SOS h Wipd&@T Planningnnin08 o i o mjjQPia: NAME, ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Raymond Alexander, JFI Associates, Inc .P.O. Box 1061 So. Windsor, CT 06074• TELEPHONE; 644-2a33 THIS APPLICATION IS FOR: (Check one of the following) 1. Zone Change to public hearing required) 2. Subdivision 3. Open Space Subdivision (public hearing required) 4. Resubdivision (public hearing required) 5. Special Exception to Article public hearing required) xxx 6. Site Plan of Development 7 . Earth Filling (Section 10) and/or Earth Removal (Section 9) public hearing required) 8. General Plan of Development 9 . Regulation Amendment: Zoning Subdivision 10. Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN TRIPLICATE WITH SIX SETS OF THE MAPS (7 if public hearing equi red) END OTHER DOCUMENTS (see page..,2 k- er tip t'is nt 1/14/8 7 see r verse side) TOWN OF SOUTH WINDSOR, CONNECTICUT rr PLANNING AND ZONING COMMISSION APPLICATION FORM This application is complete and ready for Planning & Zoning Commission receipt only upon submission of all required documentation, including, but not necessarily limited to, the following items. Not all items are required with every application. See applicable sections of the South Windsor zoning and subdivision regulations for specific requirements. APPLICATION CHECKLIST 7 1.- Key Map 2. Architectural Elevations/Floor Plans yc 3. Completed application form (in triplicate) c 4. Required fees 5. Zone Change, Site Plan, Subdivision, Open Space Improve- ment, and/or General Plan of Development maps, in accordance with regulations. (Six sets - seven if public hearing requires 6. Plans & Profiles/Drainage Calculations 7 7. Conservation Plan X 8. Landscaping Plan 9 . Traffic Engineering Report 10. Narrative Statement 11. Sanitary Report 12. Copy of agreement to purchase land (if not the owner) 13. Other ALL PROSPECTIVE APPLICANTS ARE URGED TO CONFER WITH TOWN PLANNING DEPARTMENT AND ENGINEERING BUREAU STAFF PRIOR TO SUBMISSION OF ANY APPLICATION TO THE COMMISSION. CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. 1/14/87 Svc v, WQY GoV)) lit h .SQf EXISTING FROM TO DRAINAGE AREA - TIME RAINFALL' DISCHARGE LENGTH SLOPE SIZE OF MEAN PE CAP. INTENSITY Q OF OF PIPE VELOCITYFLAWING COMMENTSAACACAMCAAtatIPIPEPIPEFULL ACRES ACRES ACRES MIN& MINS. IN./HR. C.F.S. FT. FT./FT. IN. F P.S. C.F.S. I c Z a.} o.9 0.377 0Z7 5 5 r25 1.6/ 1.5- 7.0 0_ G$ z oU 0.11 6.9 0.37 O.-? s s o J.F. I. Lot 35 and 36 1 . Proposal for an 8,100 square feet Industrial building with 1360 sq. ft of it office. It will be place on the two lots combined. Building coverage is 12.9%; 50% allowed. Impervious coverage is 44 . 1%; 65% allowed. The plan appears to meet our regulations. 2. 33 parking spaces are required; 33 are provided. 3. There are no regulated wetlands nor 100 year f loodplain on the site. This plan has already recieved conservation approval from IWA/CC with standard conditions. 4 . Stormwater runoff goes into the large detention basin west of Commerce Way and east of Rte 5. 5. W.P.C.A. has been received for the entire subdivision. A D.E.P. Discharge permit will be required if flows are greater than 5,000 gallons per day or if there will be an industrial process wastewater discharge; the Town should be notified as to whether there will be an industrial process wastewater discharge; the amount of developed acreage should be determined and reported to the Collector of Revenue for calculation of sewer connection charges. 6 . There is one double dumpster shown on the site. 7 . The landscaping plan looks good. They have provided for a variety of trees and shrubs. Again, we would like to see the white pines and the black pine proposed 5-6 ft in height. There is a natural buffer in the back of the building to rpovide screening. 8 . The architectural elevations show that the front of the building will be a split ribbed and concrete block design with some window treatment and the remainder of the building will be metal wall panels. (The building will be set back into the wooded area and will most likely not be visible from Rye Street. ) N 1 to e 1540 SULLIVAN AVENUE - SOUTH WINDSOR.-CONN. 06074 -- os,Col AREA CODE 203/644-2511 June 17 , 1988 Mr. John M. Moran, Jr. , Chairman South Windsor Inland Wetlands Agency/Conservation Commission 1540 Sullivan Avenue South Windsor, CT 06074 RE: Application Review - 140 Commerce Way Aep Dear Mr. Moran: This submittal is consistent with the regulations requiring an individual site plan for approval. As indicated on the cover sheet, there are no Inland Wetlands soils in this area for which a IWA permit would be required. The soil erosion and sediment control plan narrative appears sufficient to address the one acre disturbance. The only comments would include stabilization of the exposed areas over winter and an anti-tracking pad detail. If an approval were to be granted, a bond of $4,000 to assure compliance with the conservation plan should be adequate. Very truly yours, x A. Bowen avies Deputy Town Engineer ABD/jsv cc: JFI Associates, Inc. Michael J. Gantick, Director of Public Works Marcia Marcia A. Banach, Director of Planning IWA/CC j F I Associat s, Inc. q/P.O. sox 1061 prA South Windsor, CT 060741jP1203) 289-7662 JUN 21 1988 June 17 , 1988 S00th WindsorPlanning & Zoning commi scion Mr. Raymond F. Hallowell, Jr. , Chairman Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: John Fitch Centre, Phase II Site Plan For Lots 35 & 36 Commerce Way Dear Mr . Hallowell: We understand that the time limit for hearing the referenced application will conflict with the August recess of the Planning and Zoning Commission. We, herewith, grant the South Windsor Planning and Zoning Commission a 65 day extension for action on this matter . Ve truly yours, Raymond J. ander RJA/iba cc: Michele Lipe tOw N < ca t-ap S-Cum vine 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soRco AREA CODE 203/644-2511 June 29, 1988 JFI Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 RE: Application #88-50P - JFI, Lots #35-36 Gentlemen: At the June 27, 1988 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved with modifications Application #88-50P for the construction of an industrial building located on the west side of Commerce Way, north of Sullivan Avenue, I zone as shown on the plans prepared by Luzzi Engineering and Surveying, dated 6/8/88 The follow modifications must be adhered to for this permit to be valid: 1 . Three (3) blueprint copies of the approved map with all modifications be submitted to the IWA/CC within 65 days for review prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless th Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of $4000. to be submitted to Planning & Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures. 5 . The permit is valid for one year and shall expire on June 27, 1989 . 6 . All approvals required must be obtained and submitted prior to any activity on the site. 7 . Stabilization of exposed areas during a non growing season is required. 8. Plans should be modified to show the anti-tracking pad detail. Very truly yours, John M. Moran, . , Chairman Inland Wetlands Agency/ Conservation Commission JMMJr. ,/pmm Enclosures cc: A.B. Davies, Deputy Town Engineer Marcia A.Banach, Director of Planning John R. Collins, Chief Building Official Raymond Hallowell, Chairman, Planning & Zoning Luzzi Engineering & Surveying Tlo o`v/,SIOMM ?P&U&O-tV y 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 R•co' w AREA CODE 203/644-2511 June 29, 1988 JFI Associates P.O. Box 1061 South Windsor, CT 06074 Gentlemen: Section 4. 13. 6 of the Zoning Regulations, Conservation Plan (a copy enclosed) establishes the criteria for such a plan and a method of monitoring its application. A permit for your proposal was granted, with a bond as assurance of compliance with its sedimentation and erosion control measures. To assist in the review process by the Inland Wetlands Agency/Conservation Commission, whether for a permit extension or specific inquiry request, the provisions for verification through progress reports by the developer's/applicant's Engineer demonstrating that each Erosion and Sedimentation control measure has been installed and maintained, in accordance with the approved plan shall be required. It is requested that this verification report be submitted at least two weeks before the regular meeting of the IWA/CC to permit time for the Commissioners to evaluate your project controls . Very truly yours, A. Bowen Davies Deputy Town Engineer ABD/pmm PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM Date: I p TO: Karl Reichle, Mika Gantick, Mel Stead, Fred Shaw, Richard J. Sartcw, Gary Tyler, Fire John Shemo FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project: J T Lo4 3 ' 3C Subdivision Site Plan Residential Commercial Industrial Location: CCMMZr-Ce- Project Description. CZY14rV 4)V^ Future Town-owned property involved? YES NO a) new streets t existing frontage also) b) new open space/recreation area active passive c) new detention area Planning Department comments: Please let me know by Is IRA if you will have comments on this application so that r can follow up with your department when I do a Planning Department report. elf PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM Ali I TO: Karl Reichle, Mike Gantick, Mel Stead, Date: Richard J. Sartor, Gary Tyler, Fire Marshal I ruLin g, John Shemo FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project: 3 T Lc4 31 X Subdivision Site Plan Residential Commercial Industrial Location: Coft\ Mt'V'Ce_ Ul p.11 Project Description: C&) Future Town-owned property involved? YES NO a) new streets ( existing frontage also) b) new open space/recreation area active passive c) new detention area Planning Department comments : Please let me know by 1S IRA if you will have comments on this application so that I c n follow up with your department when I do a Planning Department report. O . Gov"_ vnAevv-4m f Itl DhAII ii1Gt Ik1lEA 7F.P. I tTIzNSITY Q OF OF PIPE VFLOWING COMMENTSAACaCACAAtt1PIPEPIPEFULL ACRES ACRES ACRES MIN& MINS. IN./HR. C.F.S. FT. FT./FT. IN. S. C:F.S. 1 CBSZ O,g 0:37 0.27 5- S 1 2 ..3 125 .Ib/ 15' v Z•3 c S 7 c F s Jj-S' 6 5— /,0 7,0 i co 2 a.ch $ will to a 2.0 c fs with no head over the grFt . o, here ore, ther willbe o headwater ov r the grate in s r— M ten (10) year sto SOMN Sf,< C U 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 oft-co AREA CODE 203/644-2511 16 September 1988 JFI Associates, Inc. P. 0. Box 1061 South Windsor, CT 06074 Attn:Raymond Alexander re: Appl. #88-50P, JFI / Commerce Way Lot #35/36 Site Plan Gentlemen: We are pleased to advise that the Planning and Zoning Commission voted on Sept. 13, 1988 to approve the captioned application for a site plan of development in accordance with Drawing dated June, 1988 prepared by Luzzi Engineering, Project No. 88-21D and with the following modifications: 1 . Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. 3 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations . 5 . A landscape bond in the amount of $5000 is required and must be submitted prior to filing of mylars . 6 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7 . A DEP permit for removal of any toxic wastes is required prior to issuance of Certificate of Occupancy. JFI Associates, Inc. 2- September 16, 1988 Black and white transparent mylars -of Key Map and Plot-.Plan with the above modifications, together with three blueprint copies of the entire set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING AND ZONING COMMISSION Raymond F. Hallowell Jr. L Chairman cc: M. Gantick, Director of Public Works F. Shaw, Supt. of Pollution Control J. Collins, Chief Building Official E. Belleville, Assessor W. Lanning, Fire Marshal M. Banach, Planning Director Registrar of Voters Inland Wetlands Agency/Conservation Commission PZC File Arch. /Engineer Applicant A wN e w 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN.06074 soR•coX' AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, SEPT. 17, 1988 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At its Sept. 13, 1988 meeting, the Planning and Zoning Commission voted to take the following action: 1 . Approve, with modifications, Appl. #88-49P, JFI Lot 17 Site Plan, north of Sullivan Avenue, west of Rye Street (I Zone) . 11 n n . n. Tr.r r _i 1 C n 2. Approve, with modifications, Appi. *00-DVr, vri Lu6 JJ of 36 Site Plan, north of Sullivan Avenue, west of Rye Street I Zone) . 3. Approve, with modifications, Appl. #88-54P, Terry Office Park Site Plan, west of Buckland Road (RC Zone) . 4 . Approve, with modifications, Appl. #88-63P, Automatic Comfort Site Plan, 856 (north side) Sullivan Avenue (GC Zone) . 5 . Approve, with modifications, Appl. #88-43P, Chopstix Modified Site Plan, west side Route 5 south of Newberry (GC Zone) . Dated at South Windsor, Connecticut this 14th day of September, 1988. PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. , Chairman Marshall Montana, Secretary J F I Associat s, Inc. P.O. Box 1061 South Windsor CT 06074 RECEIVED 203) 289-7662 SEP 2,9 1988 X WINDSOR PLANNING DEPT, September 26 , 1988 Ms. Marcia A. Banach Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: John Fitch Industrial Centre, Lot 35/36 140 Commerce Way, Application #88-50P Dear Marcia: We are submitting the names and telephone numbers of the persons to be reached in the event of an emergency in connection with the referenced project: Raymond Alexander 644-2333 or 289-7662 James Slater 528-5252 or 528-1797 The supervising engineer for the project is: Joseph F. Luzzi , P.E. 289-7662 CT P.E. License #9999 ) If you require additional information concerning this matter please contact us . er truly yours , o Raym nd 7J. Alexander RJA/iba J F I Associat s, Inc. P.O. Box 1061 South Windsor, CT 06074 203) 289-7662 October 4 , 1988 Mr . Raymond F. Hallowell, Jr. , Chairman Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: John Fitch Centre, Phase II Lot 35/36 , 140 Commerce Way, App. #88-50P Dear Mr . Hallowell: Attached, you will find cashier ' s checks that represent the bonds required for the referenced project. The checks are: Landscape Bond 5 ,000 - CBT Cashier ' s Check #61429426 dated 10/3/88 Conservation Bond $4,000 - CBT Cashier ' s Check #61429413 dated 10/3/88 We trust that these checks satisfy the requirements of the required surety. truly yours , Ray o —3. Alexander RJA/iba cc: Michele Lipe J F I Associat s, Inc. P.O. Box 1061 South Windsor CT 06074 r,.,v, 7662203) 289 a,MAY 1989 hanninSouth ndsor May 18 • 1989 g & Z""119, Commission. Mr. Raymond F. Hallowell , Jr. , Chairman Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE: John Fitch Centre, Phase II Lot 35/35 , 140 Commerce Way, App. #88-50P Dear Mr . Hallowell: On October 4, 1988 we gave the Town the following cashier 's checks as surety for the bonds established as conditions of approval for the referenced project. The project is complete. This is a request for the return of these checks: Landscape Bond 5 ,000 - CBT Cashier's Check #61429426 dated 10/3/88 Conservation Bond $4,000 - CBT Cashier 's Check #61429413 dated 10/3/88 Thank you for you attention to this matter. S ' ere , Raymond J. *nde RJA/iba cc: Michele Lipe t' „ter r •''* LI 1 , i r,'r::':(.?'_ _1. . 'il i`;. , .) Jig i989 F. rC101id ..-i_' i1'.i .C: v C. lil F 0X i L_ r aindrorc;_ )u U Y 7 ,i :,1' j - J Cl t`C, Zi1C t'. by be C Il c'C C?E'13" J itC-;'i 1_iltl 1!0i a ll t, l "iL: _ar ri (T 1 t3;1T'Lrlir;riL r_7=1"dIlCJ '?1 '_I"1_`2 to, = C'C t?? t:11^ :?C131:. Tlul_r `I_o:l : , R ,-mcnd Y . saa_ r1 c C?1',lCj C,C 11si:iS:'J O.1 Y Z C f i.I C DirOC l 'C: Of Y1_c111 11.rit C U 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 osoR,coe' AREA CODE 203/644-2511 June 21, 1989 Mr. Raymond Hallowell, Chairman Planning & Zoning Commission 1540 Sullivan Avenue . South Windsor, CT 0t074 RE: Bonds Dear Mr. Hallowell: At the June 19, 1989 meeting of the Inland Wetlands Agency/Conservation Commission, it was voted to release the following bonds: Application #88-44P, Van's Leisure Living 5000.00 Application #88-50P, J.F.I. , Lots #35 & 36 4000.00 1. Very truly yours, ohn M. Moran, Jr. Chaff an Inland Wetlands Agency/ Conservation Commission JMMJr/pmm cc:Marcia A. Banach, Director of Planning Jerry Iazzetta, Town Engineer