HomeMy WebLinkAbout14 Abar Lane (7)Reference made to a map entitled ''Rye Park Homes Conservation & Topographic
Plan Property of Richard Carabillo Windsorville Road South Windsor , Conn .
Scale : 1 "=40 ' Date : 8-11-80 Drawn A. V. H. Checked E.W. L Project : 80-36
Sheet 3 of 5 Rev. 10-5-80 , 10-24-80 , 4-22-81 , 5-5-81 , 4-1-83 , 5-7-83 Emil
W. Lucek Associates 5 Oakland St . South Windsor , Conn.
Lot 13 N/F Wilfred & Helen Beaudry
104 . 28 , FN 14 0-
08 -40' E
98 1 I
Lot 11
1
01- o Sot 5r ANo C-293
0001.oO ISTT
v 1 QO
o
10
125
CD Lot 121all
0
00j
Z 48,
FGN y
00.0 fi' I
50 ' Building Line
9 8
5
C,
o Ana R o ;' P •, _ --.. - .1 -
19q5 W
Abar Lane
Property of Richard ,Carabil,lo ,' .Lot
No. 11 Abar Lane South._WindsR." ,..' Conn.
LUCEK. ENGINEERINO; ASSOC. INC.
NO. REVISIONS DATA SCALE 1"=4 0 ' DATE $-10 -Q 3
CONSULTING ENGINEERS
490 13UCKLAND ROAD DRAWN m10 CHECKED ewl
SOUTH WINDSOR. CONN.
203-644-2474 PROJECT80-36 SHEET
1 HEREBY CERTIFY THAT THIS MAP AND SURVEY WERE PREPARED IN. ACCORDA WIT T E
STANDARDS OF A CLASS .1____ SURVEY AS DEFINED IN THE EXISTING "CoD C CE
FOR STANDARDS OF ACCURACY OF SURVEYS AND MAPS". ADOPTED BY T E ICUT
ASSOCIATION OF LAND SURVEYORS INC. FOR BUILDING PURPOSES ONLY
Tt-IRE BUILDING DEPT. TOWN OF SOUTH
This certified that this plan and specificAtions re tr,.
copies of the proposed building or alterations to o
created at
jj 9trer
r
together with amendments stated In application an,
led with pion and 1 agree to comply with nll lonlnp
Building and state laws and such older$ as shall b,
issued by the Building Departmeht during pendent.
of this application and final issuance of a buildtnk
ps,rmit.
Signed
This pia Is p avad subject to the dondition thar
orders and ordinances regulating building shall b.
compiled with.
Qonditionally Approved The filed with
ding IOspaotot Dlert
D -z-a 0 mil-4a