HomeMy WebLinkAbout1395 John Fitch BoulevardReceived: 11 /10/98 4:43PM; 860 742 2234 -> Pelletier Builders Inc. ; Page 2
FROM WMLPE PHONE NO. 860 742 2234 Nov. 10 1998 04:49PM P2
William M. LaPoint, PE
262 Lake Road Report No.
Andover, CT 06232
Date of'Visit: Gl1W'< ' _ 99 Architect• 1 2 " tA& -twl'r.0—
Project: AQO I J1100 Contractor: t?&JA4Mf,-f— &1 L06
oQ Present at Site: {A1.1}a1J h1&r-
WORK IN PROGRESS
L Q M :—* pO i si
It 1 Acl A'rf1U
FIELD COMMENTS
In 19ti z 0
Z f-1fi t. ,al 2 1'rin•1 i.. Ga I?,S .
bAl.,to A C W
INSTRUCTIONS TO CONTRACTOR
11 1!rOr L. *_VMrr O0tiJfi4..oS ArL-, IA !2-2,
dN ro to,10* C5 --to LIP
r flW11L i 'TOIJ i a ! D t
The fact that any work has becn inrpected shall not be considerrd Signature.
a wAiver of the requirement of strict complianec with the conuaa
documents and speciGcatiom, Title:
Received: 11 /10/98 4:44PM; 880 742 2234 -> Pelletler Build rs Inc. ; Page 3
FROM WMLPE PHONE NO. 860 742 2234 Nov. 10 1998 04:49PM P3
William M. LaPoint, PE
262 Lake Road Report No.
Andover, CT 06232
Date of Visit: G'T - 1 1°)9 '.. Architect:
Project: fP&M T94- AO-Vftl D Contractor:_..Y1 A&ffi*dw,-
QO Present at Site: SN&JJWDQ MA GL-10 -c51
WORK IN PROGRESS
A
1 A&1
t tL.. .1hTAtl 4c1 or 1
FIELD COMMENTS
1, ftftge X7 17AV._. 29J.., hfAL-
ram S l, n.cv. L
5, a12). AWO nr-r fll F'z ; [fir IDA 'rlC, wry jezv
INSTRUCTIONS TO CONTRACTOR
COLUMiQ D Dc i — J A WQ ot$40UL.19
The fact at any work has been inspected Aull not be considered Signature:th
a waiver of the requirement of strict compliance with the contract
documents and bpoc:ifications. Title:
Rec lved: 11 /10/98 4:44PM; 860 742 2234 -> Pelletier Build rs Inc. ; Page 4
FROM WMLPE PHONE NO. 860 742 2234 Nov. 10 1998 04:50PM P4
William M. LaPoint, PE.
262 T.,Ae Road Report No.
Andover, CT 06232
Date of'Visit: I Architect: 660,< 14&1
Project: I ArG t./ s l-t-1 a.1 Contractor:_ '--r-tG, gxl 1..
Gj -i W,h o. , GT"Present at Site: _0 Iti1 y l6 2 i —P 3 y
WORK IN PROGRESS
tJ 1, aT V 0 N l
4 G.(hdrt.. JSTd I..LA L
FIELD COMMENTS
INSTRUCTIONS TO CONTRACTOR
poi L. 2,ts4A11.--
12
Ile tact that any work has been inspected shall not bC conwidcred Signature:W a
a waiver of die r"pirement of strict compliance with the contract
dcx;umcnla ntld specifications. Title: y Q APA., 1640)2El,VDVZ .
J
FROM WMLPE PHONE NO. 860 742 2234 Nov. 05 1998 03:21PM P1
William M. LaPoint, PE
262 Lake Road Report No.Andover, CT 06232
Date of Visit: Architect:
Project: %gehA t 4rtoID11] Contractor: e
Ur Present at Site:
WORK IN PROGRESS
FIELD COMMENTS
oN
T
0 j
110
v
INSTRUCTIONS TO CONTRACTOR
I.
M.
The fact that any work has been inspected shall not be considered Signature:
a waiver of the requirement of strict compliance with the contract
documents and specifications. mde: A
Hecelvea: Ti /iu/hats 4:44pm; 860 742 2234 -> P 11 tier Builders Inc. ; Pag 5
FROM WMLPE PHONE NO. 860 742 2234 Nov. 10 1998 04:50PM P5
William M. LaPoint, PE
2ti2 Lake Road Report No.
Andover, CT 06232
Date of Visit: t av w!-. L B L- Architect: 'Y99Lr (4e MA4-
Project: '-ASCLM -T'r--AL- ACOY21 tl QIJ Contractor: T?Fu4-"T44L-- 6U 1 VVfV-`7
Present at Site: Vf CA a!E &UV-nCU4,.
DL'tl-1 W f.1 o(L
WORK IN PROGRESS
1 Nv 2Z iU'UtiA v f 192
FIELD COMMENTS
GoN+h it? owl .s?off
Lw
all Oro GO
21 1J A'S /Qi E l h Gnu14 0-
wl Iwpo6 eH O
Air fy=12
INSTRUCTIONS TO CONTRACTOR
The fact that ATap work has bvn inspoewd 6ball TIM bf;Conridcrcd Signature:wav v
a waivcr of the require 1tirnt of sttlet c,oznplitu:ce with the contract Title:documents axle)sped6,r-s00T,1;.IV :r