HomeMy WebLinkAbout125 Bidwell Road (10)i.
I
CONNECTICUT ENGINEERS IN PRIVATE PRACTICE
STRUCTURAL ENGINEERS COALITION
STATEMENT OF SPECIAL INSPECTIONS
PROJECT: Coo-5 1
DD JJ II 1
LOCATION:TJiQl.P t( 5T S W N Sdn.. GT
PERMIT APPLICANT: ADS FUC_1,V f C oti S wGrr c^
APPLICANTS ADDRESS: o`7 o L W;ni$oJt /G( C°'`' G GUZ
ARCHITECT OF RECORD: $ umev P,SS
STRUCTURAL ENGINEER OF RECORD: Fe-A^ikt j zJ ktSrti
This statement of special inspection is submitted as a condition for permit issuance in accordance with
Section 1307.0 of the 1988 Supplement to the 1987 BOCA National Building Code. It includes a
Schedule of Special Inspections applicable to this project.as well as the name of the Special Inspector,and the identity of other testing laboratories or agencies intended to be retained for conducting these
inspections.
The Special Inspector shall keep records of all inspections, and shall fumish inspection reports to the
code official and to the structural engineer or architect of record. All discrepancies shall be brought to the
immediate attention of the contractor for correction. If the discrepancies are not corrected,the discrepan-
cies shall be brought to the attention of the code official and the structural engineer or architect of record.Interim reports shall be submitted to the code official and to the structural engineer or architect of record
monthly, unless more frequent submissions are requested by the code official-
Job site safety is solely the responsibility of the contractor. Materials and activities to be inspected are nottoincludethecontractor's equipment and methods used to-erect or install the materials listed.
Prepared By:
Comes
C.Bpi. G•
Type or print name
7
a; No. 13422 I
D °ZCENSao°F
nature Date S •°°°.a°
9 s/pig'
9AmpaWl'P.E.Seal
Applicant's Authorization: Building Official's Acceptance:
7 9f
r,. a.
Signature Da a
CEPP/SEC FORM SEC 101 •Statement of Special Inspections•CBPPISEC •C 1990
tJluu J iIlls t-01111)
APPLICABLE TO THIS PROJECT_
MATERIAL / ACTIVITY SERVICE Y/N EXTENT - _ AGENT' COMPLETE
STEEL CONSTRUCTION
Verify fabrication/quality control procedures In-plant review (Code Secflon 130711) V
Note; Open web Joists exempt
Structural steel Review material identification markings
and certified test reports (1307.3.2) l
UiS C F C (
Bolls, nuts/,washers Review material Identification markings y V's UA L rCjr,j f
and certified test reports (1307.3.2) NUT /AtT N1 d
Welb filler material Review,certilicale of compliance (1307.3.2)
V I S
Installation of high strength bolls Field review (1307.3.3.1) y Ill u r e t Ef a
Welding Shop and field review (1307.3.3.2)y bA v F C 6ISa
Details Field review steel frame (1307.3.3.3) y 0 S u A L A
CONCRETE CONSTRUCTION
Concrete materials Review certificates of compliance (1307.4.1) i-ic K6 fiS F c Q
Installation of reinforcing steel Field review (1307.4.2) Y U iSJA L
Installation of prestressing In-plant or field review (1307.4.2) A)
Formwork Ryvlew submittals and field review (1307.4.3) Y V i hL Fc
Concreting opefations:
a. Evaluation of concrete strength Review submittal and field testing1307.4.4
b. Proper mix propo,Mons and mix techniques Review submittal and field review (1307.4.4)1"1 q 14-F
c. Loncrete placement Field review (1307.4.4) 1/I`S vA'C PCY
d. Concrete cluing Field review (1307.4.4) S R C C
Prastressing In-plant or field review (1307.4.5) U
Precast concrete manufacturer In-plant review (1307.4.6) N
Erection of precast concrete Field review (1307.4.7)
Masonry materials Review submillals (1307.5)N
Masonry strength testing Review submittal and field testing (1307.5) N
Construction operations Field review (1307.5)j
WOOD CONSTRUCTION
Verity fabrication/quality control procedures In-plant and field review (1307.6)
PILE FOUNDATIONS
Installation Field review (1307.7)N
SPECIAL CASES (Attach a 112 x 11!1 needed) (•f307.8)
INSPECTION AGENTS FIRM ADDRESS
1. Special Inspector: PO S Enj G-%E 2i (,- T/LS a N /0-7_0 C O W i NISu tL Qd_ /j p0A C Co u Zo2
2. Testing Laboratory: a57'pr,1 /UfF-r-rd a t' --- " - 123 -
3.Testing Laboratory:
4. Other:
Note: The Qualifications Of The Special Inspector And Testing Laboratories May Be Stib)ecl To The Approval Of The Building Otllclal
CEPP/SEC FORM SEC 101 •Stalemenl of Special inspections • CEPf/SEC 01990
CONNECTICUT ENGINEERS IN PRIVATE PRACTICE
STRUCTURAL ENGINEERS COALITION
FINAL REPORT _OF SPECIAL INSPECTIONS
PROJECT:
LOCATION:
PERMIT APPLICANT:
APPLICANTS ADDRESS:
ARCHITECT OF RECORD:
STRUCTURAL ENGINEER OF RECORD:
To the best of my information, knowledge, and belief, the special inspections required for this project,and itemized in the statement of special inspections submitted for permit, have been completed.
The following discrepancies that were outstanding since the last interim report dated have
been corrected:
Attach 8 112 x 11 condnuadon sheet(s)if required to complete the description of corrections)
Interim reports submitted prior to this final report, and numbered to form a basis
for, and are to be considered,an integraf part of this final report.
Respectfully submitted,
Signature Date
for
Type or print name Date Special Inspector