Tri-State Materials Testin Lab Inc.
IESTWG Lolac g
Connecticut Division
121 "P"North Plains Industrial Road, Wallingford,CT 06492 •(203)949-7733 •Fax(203)949-7735
i f01P•l000s
IN'! =ION.ENOIIiiONG
Client: W.J. Mountford, Co. Report#: 002
170 Commerce Way Date:03/07/01
South Windsor, CT 06074
Project: Windsor Steel
Contractor W.J. Mountford
Inspector: Chris Purinton
FIELD WOOD TRUSS INSPECTION
Inspector visited site of completed wood frame building as scheduled by client. Builder was not on
site. Met w/Paul Hollman.
Visually inspected wood trusses for conformance with MITEK approved approved truss assemblydrawings, plan drawing, and conventional use of standard hanging and fastening systems, and found
the following:
Trusses were assembled and set as drawn.
Simpson hurricane ties were on 3 exterior walls.
Two Simpson ties one at each connection of 021's to J29's, were not fully fastened as designed.
Two GT hangers one at each connection ofJ21's to M02's had been bolted to JQ2x8's off center
which was compromising the JQ2x8 hanger members.
Referring to Quality Stair& Rail fabrication drawing approved by the Lawrence Assoc. as corrected
on 1 1-30-00, visually inspected steel interior frame and found it fabricated and erected as drawn.Baseplates were not visible.
Report To: W.J. Mountford,The Lawrence Assoc., Kahn&Bayer Structural Eng.
Submitted By: Tri-State Materials Testing Lab., Inc
Sarni H. Haj P#1}}',, Iztn t;
t. .•tit
The above data is the property of the client No reproduction ofthe above data without the sole permission of Tri-State Materials Testing 9~ Y•
1Tri-State Materials Testing accepts no liability for work executed by others ti•;+w '•
i I of
fdo.21345
i NAL e ``•
New York City•Long Island Edison,NJ•Wallingford,CT Dover,DE
Put us to the test—and our 20 years of experience"
Ifti-STATE
iii,
T
Tri-State Materials Testin Lab Inc.
Connecticut Division
121 "P"North Plains Industrial Road, Wallingford, CT 06492 •(203)949 - 7733 Fax(203) 949-7735
o0 •
INIP5=1 li•ENOMEMMG
Client: W.J. Mountford, Co. Report 4: 004
170 Commerce Way Date:03/27/01
South Windsor, CT 06074
Project: Windsor Steel
Contractor W.J. Mountford, Co.
Inspector: Chris Purinton Page 1 of 1
FIELD STRUCTURAL STEEL INSPECTION
Met with project manager, Paul Hollman at site. Reviewed fabricator CECO drawings.
Erector was installing roofing.
Visually inspected mezzanine framing and deck and found the following:
One column was out of plumb at B 1/1 OA
One baseplate was missing a nut at B/11
Decking and all other connections were completed and acceptable per AWSD1.1,
AWSD1.3, AISC, and approved drawings.
Welding of nuts to anchor bolts should be submitted for approval if required to
compensate for short bolts or slotted baseplates.
Inspector began visual inspection of main building frame because erector foreman reported
all connections completed. Inspector found one loose rod brace at 139/1-2 and marked the
column beside the brace. No other discrepancies were found at this time.
Crane beams and hangers were still in progress.
Report To: W.J. Mountford,Town of S. Windsor, Kahn& Bayer Structural Eng.,Lawrence Assoc.
Submitted By: Tri-State Materials Testing` '[x n ``
SAM, ,1 ar;.
w s L Y.`
r ` • `•-r
The above data is the property ofthe client No reproduction of the above data without the sole pennission of Tri-State Materials Testing °N - r
Tri-State Materials Testing accepts no liability for wort,e\ecuted by others