HomeMy WebLinkAbout12 Arrowwood CircleBUILDING PERMIT CHECK LIST
Applicant Building Permit No.
Address 1 a--N Date Submitted
Lot No. Reviewed by r
Project Date
In accordance with the Subdivision Regulations , prior to the building of
any structure on 'a lot, a Topographic Plot Plan shall be submitted for
approval. The minimum requirements shall include :
Approved Denied N/A
r/ 1. Name, address & p owner/
applicant.
2. Name, address & f plan preparer.
3. Zoning information - i.e. zone, open space,
floodway, etc.
4 . Plot plan at 1" = 40 ' scale.
a. Subdivision reference, abutting
properties , etc.
b. Easements of record.
c. Lot description, bearings , distances ,
building lines , area, etc.
d. Contours , existing & proposed, 1 or 2 f t
interval where appropriate.
G e. Building location with dimensions .
Elevations of proposed finish floor,
garage floor & center line of road at
driveway.
f. Elevations of gravity drainage systems ,
sanitary & foundation drain at the
house and the street.
g. Tentative utility location gas , electric
water, etc.
h. Title block with name and address of
preparer, date appropriate certification
c/
live seal and signature.
5 . Sedimentation and erosion control .
d 6 . Special Planning & Zoning, Inland/Wetlands
considerations . (Plans on file w/Town Clerk)
BUILDING DEPT.
PZC
1%E'
IWA/CC
WPCA
OTHERS