HomeMy WebLinkAbout115 Main StreetApplication No. 3770. Permit No. 351.0
TO THE BUILDING INSPECTOR
of the
TOWN OF SOUTH WINDSOR, CONN.
t"j- hereby make application for a permit tot (make alteration to) a building according
to the following detailed statement of the specifications and plans herewith submitted. (Draw a line through
word "erect" or words "make alteration to" as the case may require.)
All provisions of the Building By-Laws (Sections 2 to 32 inclusive) shall be complied with in the execu-
tion of this work whether specified herein or not.
South Windsor, Conn., _ 19..r,.../.
CT
Sign here ..... .... ... . .......... .......................
Address ...../. ....cyl.,.
Location?
Nearest cross street? .... .. S...... ..57-#....................Street No. . Lot No. .. .. ..... ............. .
r Owner of land is? .: L=.Address ,o/ ... y/' -,/. ........ 7%
w. tOwnerofbuildingis? .. ".'.. Address . ... . .... .............
Architectis? Address `( ......... ......................................... ....... . ..... ............
Address1' Builder is? . .................................... t...........................
Dimensions of building? . Feet front. Feet rear? . ..... Feet deep? .
Extreme height to highest point of roof? ...... .... ............. No. of stories in height . .
Purposeof building is? .. .......................................................................No. of stores? ....................... ............................... ..... .............. ...............
Howmany families? ... ....................................................................................No. of rooms? ... . .. ... . .......... ...........................................................
Distance from street line is? . .... ... .. ......... ...... ...........from building line is? ...... ....... ... . ............................. .............
ADDITIONS AND ALTERATIONS
Give Brief Description)
e.. ....... ... r... ,1/ r... ....
Map No.
If of steel frame, what is exterior construction? .
What kind of columns used? ..... Size of columns used?
What length of columns used? . How protected?
What kind of beams or girders? Size of beams or girders? ..
Longest span of beams or girders? These rest on?
Roof construction is? .. Roof covering is?I..............
The floors are of construction and are calculated to carry a safe load of
lbs. per square foot.
See Section 14, Building By-Laws.)
BRICK CONSTRUCTION.
Of what material will walls be constructed? .
Composition of mortar?
Height and Thickness of Walls
Height Stories Front Walls Side Walls Rear Walls Partition Walls
Basement,
1st Story
2nd "
I.......................... . ........ ........ .. .
3rd "
I...... . .. .......................................... .........................................
4th "
5th 11
6th "
7th
8th
9th "
10th....... .. . ...........
Material,of Front? If stone, what kind?
Thickness of Ashlar?Thickness of Backing?
Backed up with what? Arches or lintels over openings?
WOOD CONSTRUCTION.
Give Size, Longest Span and Distance Between Centres, of Joists, Girders and Columns
JOISTS GIRDERS COLUMNS
FIoors Size Longest Span Centres Bridging Size Longest Span Centres Size Length Centres
1st Floor
2nd...«...
3rd
4th
Size of outside studs? ... ....... Distance on centres? . Size of sill? ............. ......... .................
Size of rafters? Distance on centres? . . . . Size of plate? ....................................................
Size of ledgers or girts? Size of deck rafters? . .. . ... ................................... ...............
Distance on centres? ......... Size of studs in bearing partitions? .. .... ... ................ .........
MISCELLANEOUS
Style of roof, flat, pitch, Mansard, or hipped? Fireplaces?
Material of roof covering? . Material of Cornice? ........ . . ...... ...................................... ... .........
How is building heated? Lining of flues? . .. .................. .....I........I. .. ........ ....I.........
Thickness of shell of flues? ... .. . .. . . ............... ... .....Any elevators or lifts? ..... . .... .. . .. ....... . .. .. .................. .
What kind% How many? Any hoistways9
How protected? Total Value of Building
When will work be commenced? ra ..........
The applicant warrants that the lot for residential purposes, shown on a plot plan accompanying this appli-
cation, has 20,000 square feet, or more, and at least 100 foot frontage on a Town road shown on a map of
South Windsor showing Town Roads dated December 1949, or on any other roads officially accepted by the
Town of South Windsor since 1949.
s
Applicant
3510
BUILDING APPLICATION
3770ApplicationNo. ... . .................................................................
on the ... We.at... ....... ..... ......... ................. side of
Iv.'ain Street.
Street No, 115
Owner Herbert Cr abb e...
Applicant Same
CLASSIFICATION
Remove door windows and replace
with -garage door.
I... ........
Permit issued on above Application.
Date, Ma..y .5 19. 61
l
i
l
TOWN OF SOUTH WINDSOR
i
BUILDING PERMIT
Date May 5 t 1961
Fee Paid $2!00 Est. Value $2 00!00
Permit N9 3510
I
E
f on the We st side of
i
Main Street
i
Street No. 1154
f
Owner Herbert Crabbe
Applicant Same
f
CERTIFICATE OF OCCUPANCY ISSUED:
Date
i
No.
Fee Paid $
CLASSIFICATION
Remove door & windows and replace
with garage door.
BUILDING PERMIT
N® 3510
OFFICE OF
THE BUILDING INSPECTOR
of the
Town of South Windsor, Conn.
South Windsor, Conn. L'.a.Y 5 1961
X4t'o to to Terfif1j.9 That T'Iarbert Jrabbe
is hereby granted permission to Remove door L"' windows and replace with
garage door.
at estimated value of
on the We at side of Fain S t. Street on land
owned by lierbert Cr abb e
Said Work to be as described in Application
No. 3770 and to conform to specifications and plans filed with said Application, and Building By-
Laws of THE TOWN OF SOUTH WINDSOR.
Issued 1iSLY 1961
M
Building Inspector.
Streets and sidewalks, obstructed by excavations or building materials, must be guarded by barriers
during the day and by both barriers and colored lights by night.
SE^TION 1343, GENERAL STATUTES OF CONNECTICUT: "When any person shall place
or keep building materials, or any obstacle in any highway (or any sidewalk) either with or without a
license therefor from the city or borough in which such highway may be situated, he shall pay said city,
town or borough all costs and damages which it shall sustain, or be compelled to reason therefor."
Application No. .. 1 Permit No. . !r' ..............,
TO THE BUILDING INSPECTOR
of the
TOWN OF SOUTH WINDSOR, CONN.
hereby make application for a permit to (cart (make alteration to) a building according
to the following detailed statement of the specifications and plans herewith submitted. (Draw a line through
w rd "erect" or words "make alteration to" as the case may require.)
All pr*vWon&of the-Building By-Laws (,Sections 2 to 32 inclusive) shall be complied with in the execu-
tion of this work whether specified herein or not.
South Windsor, Conn., l.aa...7 .. .t.. 19. 1.
Signhere ..... ................... ..... .! .......... ....... ......................._...........
I.. ....JS....../ l..a..l....... S.tq.......... .................Address .....
4Location? 1 h.........5. .................................side of?
Nearest cross street? ...................................................................................Street No. .. ............. ............................. Lot Now. ............. . ........... .
Owner of land is? 1! ,S-K!...Address ..j.1...J.........M....
o.`.. .Owner of building is? . v ..Address S , h„
Architect,s? . ... ............... . ................................................... ......................Address ............................. ............................................. ........... .....................
B 'lder is? . ....... .................................................................._.............................Address ...................................................................................................... ...........
Dimensions of building? .. Feet front? ....... .... ...... . Feet rear. . ..... . ........... Feet deep. ..
Extreme height to highest point of roof? ............ ... ............ No. of stories in height?.
Purposeof building is? . ............................. .....................................No. of stores? ..... ................. .................................................... ..............
Howmany families? .. .............................................._...................................No. of rooms? ... ......................... . ........................ ................. .............
Distance from street line is? . .. .. . .... ....................................from building line is? ......
ADDITIONS AND ALTERATIONS
Give Brief Description)
r i nJ;54-8 ! .. ... t— ... 1 ............ .4.!"a.... ... ....... .4?. ..h.... '..- .i................. .......... ......... `........................
i. !. --........,'?. .... r
Map No. .... . ......,
If of steel frame, what is exterior construction?
What kind of columns used? ......... ..... ... ...... Size of columns used?
What length of columns used? .. How protected?
What kind of beams or girders? .... Size of beams or girders? . .
Longest span of beams or girders? These rest on?
Roof construction is? ................ Roof covering is? .
The floors are of . . .. .construction and are calculated to carry a safe load of
lbs. per square foot.
See Section 14, Building By-Laws.)
BRICK CONSTRUCTION.
Of what material will walls be constructed?
Compositionof mortar? . ........... .. ............................... ........ ....... .................... ............. ........
Height and Thickness of Walls
Height Stories Front Walls Side Walls Rear Walls Partition Walls
Basement,
1st Story
2nd
3rd .
I........................ ... .. ...... ......... .. ......
4th "
5th "
6th of
f
7L{. d/
I.................. ..... ..... ...«................................ ............. ................ . ................... .................. .... .. ..... ............... ....... ............ ............. ...........................
v ll8tof
Cr
9th do
x
Material.of Front? If stone, what kind? .
Thickness of Ashlar?Thickness of Backing? .
Backed up with what? Arches or lintels over openings?
WOOD CONSTRUCTION.
Giv Size, Longest Span and Distance Between Centres, of Joists, Girders and Columns
JOISTS GME&MRS COLUMNS
Floors Size I Longest Span Centres BrIdging She Longest Span Centres SIM Leng* Centres
1st Floor
d.... ....... ............. 3r
Size of outside 3tUC13? ............... ........ ............. Distance on centres? ............................................... Size of sill? ............................................
Size of rafters? ...... ........................ . Distance on centres?........................................ -. Size of plate? ....................................................
Sizeof ledgers or girts? ........... . ........ .... ............. .............................Size of deck rafters? ... ................................................................ ...............
Distance on centres? ............ ............4;....... ................................................Size of studs in bearing partitions? ..................................................
MISCELLANEOUS
Style of roof, flat, pitch, Mansard, or hipped? Fireplaces? ...................................................
Material of roof covering? . .. ... .............. ....................... .........Material of Cornice? ...................................................................................
Howis building heated? . . ...............................................................Lining of flues? ... .. ..................................................... ......... . ..............
Thickness of shell of flues? . ....................................................................Any elevators or lifts? ....................... ............................ ......................
What kind? .. ........ ... ....... ... How many? . Any hoistways? .. .... ... . . ........ . ..... ... .
How protected? Total Value of Building 0 1. e.e)
When will work be commenced?
The applicant warrants that the lot for residential purposes, shown on a plot plan accompanying this
application, conforms to the zoning regulations of the Town of South Windsor.
Town of South Windsor since 1949.
Applicant
3653
BUILDING APPLICATION
Application No. 391.E........................................................
on the .... W.®.s t . . side of
Main
Street.
Street No, 11.5
Owner John Jablonski
Applicant Same
CLASSIFICATION
Install garage doors and repair
inside of building.
Permit issued on above Application.
Date, Aug.14 r 19 61
I
i
E
TOWN OF SOUTH WINDSOR
BUILDING PERMIT
Date AL19 U: 19(61
1 Fee Paid Est. Value $60010.00
j Permit N9 3653
on the Weut side of
Main Street
Street No. 115,1
f
1 Owner John Jabl omski
3
i Applicantame-
CERTIFICATE OF OCCUPANCY ISSUED:
I
Date
I
j No.
Fee Paid $
CLASSIFICATION
Install- garage doors and repair
f
I inside of building.
t
1
BUILDING PERMIT
N? 3653
OFFICE OF
THE BUILDING INSPECTOR
of the
Town of South Windsor, Conn.
South Windsor, Conn. Aug.'14. 1961
C14is to to Terfif1jI, That JOh;l Jablonski
is hereby granted permission to Install ;a r z. doors € d repair inside of
building.
at estimated value of $$ 0 y-0 0
on the "e st side of Main Street on land
owned by John Jablonski
Said 'or k to be as described in Application
No. 3913 and to conform to specifications and plans filed with said Application, and Building By-
Laws of THE TOWN OF SOUTH WINDSOR.
Issued ,ioa& .
f.
1961
Building Inspector.
Streets and sidewalks, obstructed by excavations or building materials, must be guarded by barriers
during the day and by both barriers and colored lights by night.
SELTION 1343, GENERAL STATUTES OF CONNECTICUT: "When any person shall place
or keep building materials, or any obstacle in any highway (or any sidewalk) either with or without a
license therefor from the city or borough in which such highway may be situated, he shall pay said city,
town or borough all costs and damages which it shall sustain, or be compelled to reason therefor."
Building APPLICATION FOR BUILDING PERMIT
Plumbing
HVAC Date. L.
Sprinkler
Electric Estimated Cost $•
Zoning Permit Fee$ io —
Affidavit NO. 17365 Occupancy Fee $
Eng. Dept.
Fire Dept. COMPLETE RED BOXED AREAS. Total Fee $
Health Dept. TYPE OR PRINT ONLY
Approved SIGN ON REVERSE SIDE.
TO BUILDING DEPARTMENT, TOWN OF SOUTH WINDSOR, CT
The undersigned, hereby applies to do work according to the following specifications:
Job Location I I ' Ma r`j, Lot No. Side of Street Zone
Applicant 'Zn a A el. #agl-2151
Address-
T'
5 a-'t-1n S 1 Lic. # Zip O L'1 '7 h
Owner* 2J o%y aa 1%K i Address ! 15 M a
Architect Address
Size Main Building: Ft. Front Overall Ft. Deep Overall Total Area Garages
Lavatories
No. of Families No. of Stories Construction Bathrooms Rooms 1st 2nd 3rd
Size of Lot Dist. from Street Line Dist. from Side Street Line
Purpose of this Permit lie M O V E3"'u_ S Fr'L 154 N- 0 L&VIC:
City Water Well Septic Sewer
Approved by cl Date 16
Dist. from lot line E. W. S. N. Dist. nearest Bldg. ft.
Height of stories -cellar 1st 2nd 3rd 4th 5th
Found depth below grade Above grade Material for footing
Size footing Material for found. Found. thickness
Roof No. of stairways Size of girders
Material for Side Walls Size of pier found.
Floor joists, size: 1st 2nd 3rd stories. Dist. on center
Longest span of floor joist: 1st 2nd 3rd If not wood joist const. what type of floor?
Size of Roof Rafters Longest span on center
Chimneys, size of flues How many? Where does tile start?
Plumbing contractor, Permit No. Oil burners, Permit No. Plot Plan Rec'd:
Heating contractor, Permit No. Checked by Eng. Dept. ;
Electrical Permit No. Signed by Engineer:
Sprinkler Permit No.
I hereby agree to conform to all the requirements of the Laws ofthe State of Connecticut and the Ordinances of the Town of South Windsor and to
notify the Building Inspector of any alteration in the plans or specifications of the Building for which this permit is asked, and agree that this
building is to be located the proper distance from all street lines,side yard lines and required distances from all other zones and is located in azone
in which this building and its use is allowed
hereby apply for a Certificate of Occupancy for
described in the above application for permit.
Signed