APPLICABLE TO THIS PROJECT
MATERIAL I ACTIVITY SERVICE YIN ExzENT COMPLMD
STEEL CONSTRUCTION
Verily fatxicatioWquality control procedures to-plant review(l ode Section 1307.3.1)
I late: Open web foists exeun p! Y JOB 0--2 3 34 12/7/9 0
Stn,clural steel Review meierial identification marMW I i Iandcertifiiedlestreporls(1307.3.2) Y r r r 12/7/9 0
Bolus,nutsl washers Review material identification markings
and carlified test reports(130T.3.2) Y r r Q50t 12/7/9 0
Welb Mer material Review certiiicde of comptienoe(130T.3.2)
i
tltnslaftonofhighstrengthboltsFieldreview(f 3D7.3.3.?) N/A
Waking Shop and field review(1307.3.3.2)Y JOB ;'t 9 0-2 3 3 4 2/7/9 0
Details Field review steel frame(1307.3.3.3) N/A
CONCRETE CONSTRUCTION
Concrete materials Review certificates of compliance(13074.1)
Installation of reinforcing steel Field review(13D7.4.4
kWatla*m of prestressing in-plait or field review(f307.4.4
Formwork Rpm subs and find review(1307.4.3)
Concreincg operations:
a.Evaluation of concrete atrenglh Review subrmittal and field testing(f=4.4)
b.Proper mix proportions and mix tedwdgtm Review suxnitlatl and field review(1307.4.4)
c.Concrete placem nt Reid review(1307.4.4)