Loading...
HomeMy WebLinkAbout101 Bidwell Road (9)SCHEDUI. O SPE IAA. I P DTI E V C er Giwdan e+iiso rm _ a 0-2 3 3Seaamunerf 4g1 APPLICABLE TO THIS PROJECT MATERIAL I ACTIVITY SERVICE YIN ExzENT COMPLMD STEEL CONSTRUCTION Verily fatxicatioWquality control procedures to-plant review(l ode Section 1307.3.1) I late: Open web foists exeun p! Y JOB 0--2 3 34 12/7/9 0 Stn,clural steel Review meierial identification marMW I i Iandcertifiiedlestreporls(1307.3.2) Y r r r 12/7/9 0 Bolus,nutsl washers Review material identification markings and carlified test reports(130T.3.2) Y r r Q50t 12/7/9 0 Welb Mer material Review certiiicde of comptienoe(130T.3.2) i tltnslaftonofhighstrengthboltsFieldreview(f 3D7.3.3.?) N/A Waking Shop and field review(1307.3.3.2)Y JOB ;'t 9 0-2 3 3 4 2/7/9 0 Details Field review steel frame(1307.3.3.3) N/A CONCRETE CONSTRUCTION Concrete materials Review certificates of compliance(13074.1) Installation of reinforcing steel Field review(13D7.4.4 kWatla*m of prestressing in-plait or field review(f307.4.4 Formwork Rpm subs and find review(1307.4.3) Concreincg operations: a.Evaluation of concrete atrenglh Review subrmittal and field testing(f=4.4) b.Proper mix proportions and mix tedwdgtm Review suxnitlatl and field review(1307.4.4) c.Concrete placem nt Reid review(1307.4.4)