Loading...
HomeMy WebLinkAbout100 Arnold Way (59)The s / L A M Collaborative Architecture April 28, 1997 Planning Interiors Engineering Landscape Mr. David R. WedgeConstructionServices Technology CT Department of Education School Facilities Unit P.O. Box 2219 Hartford, CT 06145-2219 RE: Timothy Edwards Middle School South Windsor, CT Project No. 95040.00 SDE Project No. 132-066EA Dear Mr Wedge: This letter contains responses to the Plan Review Record dated April 21, 1997 for Phase 1 of 2 for the above noted project. The responses are as follow BUILDING CODE/504 COMMENTS 1.Passenger Loading Zone Sign: A note indicating the location of the sign at the student drop-off drive just north of the main entrance has been added to Site Layout drawings L-201 &202. 2.Accessible Parking Spaces: The three spaces previously located in Parking D have been removed and changed to standard spaces. One of these spaces has been relocated to the southeast comer of Parking C. Two of these spaces have been added to the northern end of Staff Parking E. At that location they have access to the main entrance to the building without crossing the access drives in front of the school. We have also indicated two accessible spaces in front of the middle entrance to the school which will be available to users after normal school hours for evening functions. All of these changes have been reviewed with the school administrators and Superintendent of Schools office. Somerset Square 3.Accessible Route to the Athletic Fields: A fire foot wide traprock aggregate 80 Glastonbury Boulevard surfaced path has been added from the cross«alk at the northwest comer of Glastonbury Parking B up to the northwest to give access to the new soccer field.Connecticut06033-4415 Phone 860 657 8077 Fax 860 657 3141 4.Accessible Route to Environmental Education Outdoor Classrooms (at detention basins): The detention basins at the northeast corner of the property and the south central edge of the property currentlN have gravel access drives for town vehicles 281 Farmington Avenue to get in to the drainage outlet structures for routine maintenance. We have addedFarmington Connecticut 06032-1960 labels to these drives to indicate that then are also an Accessible Route to the Phone 860 657 8077 detention basins for persons with disabilities Fax 860 677 6507 mad9slamcoll com hrtp /wwwslarncoll com' Mr. David R. Wedge April 28, 1997 Page 2 1 have met with John R. Collins, South Windsor Building Official on April 28, 1997 and have secured his signature on these 4 items as well as the receipt of drawings certification at the end of the letter. Per discussions with Craig Smith of your office sign-offs on only the above four items are required for approval of Phase 1. The following comments need to be addressed at a later dated for approval of Phase 2: MISCELLANEOUS: 5.Ineligible Cost Form: The form that was distributed at the PREP meeting has been located and we are in the process of refining the cost estimates for Phase One and the balance of the project. An updated copy with all applicable items will be submitted along with the Phase Two submission. 6.Disposition of Relocatable Classrooms- A letter from the Superintendent of Schools will be forthcoming indicating what will be happening with these units at the end of this project. 7.State Traffic Commission Review: Our traffic engineering consultant has sent in a letter to the DOT/STC asking for a determination on this project. Once this has been resolved we will send you the appropriate correspondence indicating compliance with this item. Sincerely, The S/L/A /M Collaborative b Vv I Peter S Sobin, AIA Project Manager PSS Enclosure cc: J. McManus, S/L/A/M J. Wood, SW Public Schools J. Muller, SW Bd of Education H. Fitts. SW Public Building Commission J. Collins, SW Building Official W. Lanning, SW Fire Marshal/Chief 1950401draRs197R115a doc