Loading...
HomeMy WebLinkAbout100 Arnold Way (58)The S I L IA I M Collaborative Architecture August 28, 1997 Planning Interiors Engineering Landscape Construction Services Mr John Collins Technology Building Official Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Timothy Edwards Middle School Phase One -Portable Classroom Relocation S/L/A/M Project No. 95040.00 SDE Project No. 132-066 E Dear Mr. Collins: In accordance with Section 119.6.1 of the Connecticut State Building Code, and based on our inspections of the Portable Classroom Building at the above noted school location, it is our professional opinion that the completed structure is in substantial compliance with the approved construction documents on file with your office. Sincerely, The S/L/A/M Collaborative Peter S. Sobin, AIA Project Architect Somerset Square 0 &G Industries, Inc. 80 Glastonbury Boulevard Construction Manager Glastonbury Connecticut 06033-4415 Phone 860 657 8077 Fax 860 6573141 cc: P. Hankard - SWBOE 281 Farmington Avenue H. Fitts - SW/PBC Farmington Connecticut06032-1960 Phone 860 6578077 1\9500drafts07h240a doc Fax 860 6776507 mall@slamcoll.com http//wwwslamcoll corn/