Loading...
HomeMy WebLinkAbout100 Arnold Way (55)ao rllV ' lift NDEPENDENT MATERIALS TESTII '°, F.FaCr'': 57 N. WASHINGTON STREET r " P.O. BOX 745 LABORATORIES, IIC. f%- PLAINVILLE, CONNECTICUT 06062 (860) 525-7193 FAX (860) 747-455 NVLAP Accredited for Construction Testing Services 0 FSSi ALt'y``` REBAR INSPECTION 111/ 11, 111110 CLIENT: O&G Industries PROJECT NO. : 3756 PROJECT: Timothy Edwards Middle School REPORT NO. : 003 DATE: July 7 . 1997 PAGE: 1 of 2 LOCATION: Non-Seismic Piers Supporting Temporary Classrooms INSPECTOR: Chris Wickson Percentage of Completion at Time of Inspection REBAR: 100% FORMWORK: 100% 1. Rebar sizes, spacing from each other and formwork: Deficiencies: Comments: Sections were in accordance with design specifications 2 . Rebar quality, cleanliness, rust, grease, etc. : Deficiencies: Comments: Bar was clean, free of rust and oil 3 . Positioning of Rebar: Good Use of chairs: N/A Comments: Adequacy of firm tie offs: Tied securely prior to concrete placement Comments: Are dowels in place now?: No Yes N/A Test reports may not be reproduced except in full with approval of IMTL. All results relate only to the Items tested. Test reports must not be used by client to claim product endorsement by NVLAP or any agency of the US Government. TESTING RESEARCH ANALYSIS INSPECTION CONSULTING Portland Cement Concrete Soils Steel Building Products Bituminous Concrete Timothy Edwards Middle School Project No. : 3756 Report No. : 003 July 7, 1997 Page No. : 2 of 2 4. Rebar splicing: N/A Diameter of laps: Is wiring adequate? Comments: 5. Construction joint quality -- cleanliness, water, etc. Depth: Width: Shape: Comments: 6. General condition of forms in place: Cleanliness: Good Oiled: Yes: No: Conditions: Free of dirt and standing .water Comments: 7. Quality of formwork: Trueness in 3611 • Plumbness in 3611 : Good Line Straightness: Good Bracing: Tight fill around sonotubes Comments: 8 . Formwork inside dimensions, L, H, W. Measure Dimensions: Comments: Sonotubes were of correct diameter and depth 9. Is a follow-up inspection necessary just prior to the concrete placement: Yes No If so, for which item numbers: 10. List discrepancies: pc: O&G Industries / S/L/A/M Collaborative / John Collins, South Windsor Building Official ka