Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
100 Arnold Way (28)
CERTIFICATE OF OWNER SUBSTANTIAL COMPLETION ARCHITECT o CONTRACTOR AIA DOCUMENT G704 FIELD instructions on reverse side)OTHER PROJECT:Interi r Renovations to PROJECT NO.: KB #94026TimothyEdwardsMiddleSchoolN"""and address) South Windsor, CT 06074 CONTRACT FOR: General Construction CONTRACT Dr1I'E: June 7, 1995 TO OWNER: Town of South Windsor, CT TO CONTRACTOR:W.J. Mountford, Inc. Nance and address) 1540 Sullivan Avenue Namne and address) 205 Nutmeg Lane So. South Windsor, CT 06074 South Windsor, CT 06074 DATE OF ISSUANCE: August 30, 1995 PROJECT OR DESIGNATED PORTION SHALL INCLUDE: All work of this Contract The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion thereof designated above is hereby established as Noon on Wednesday August 30, 1995 which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: No exceptions A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the respon- sibility of the Contractor to complete all Work in accordance with the Contract Documents. Kaestle Boos Associates, Inc. ARCHITECT BY Mar J. Weisman DA E The Contractor will complete or correct the Work on the list of items at ch d heret within days from the above date of Substantial Completion. W.J. Mountford, Inc. g-.30 . F- CONTRACTOR DATE The Owner accepts the Work or designated portion thereof as s stand/11yvc( plete and will assume full possession thereof at time) on date). Town of South Windsor OWNER BY DATE The responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: Note—Ou-ners and Contractor's legal and insurance counsel should determine and review insurance requh-emenls and coverage) The Owner shall assume all responsibilities. CAUTION: You should use an original AIA document which has this caution printed in red. An riginal assures that Chang s will n t b bscured as may occur when documents are reproduced. AIA DOCUMENT G704 •CERTIFICATE OI:SUBSTANTIAL COMPLETION • I(L)2 EDITION • AIAm • ©1992 • ITIE AMERICAN INSTITUTE: OI: ARCHITECTS. 1715 NEW YORK AVENUE, NW, WASHINGTON, DC 20oo6-5292I ...` WARNING:Unlicensed photocopying violates U.S.copyright laws and will subject the violator to legal prosecution. G704-1992 Interior Renovations to the Timothy Edwards School Page - 1 - South Windsor, CT KB #94026 Punch List August 25, 1995 Media Center Replace panic bar. Patch and paint block at new opening. Complete raceway. Wash windows. Seal finish wood trim. Install unit vent - provide temporary enclosure - balance air and water - tie-in to DDC. Clean glue off millwork and brick. Caulk millwork to glass. Patch brick. Caulk chase to millwork. Patch carpet in Corridor. Open junction box above ceiling. Install linear bar grilles. Tie exhaust fan to DDC; balance. Cafeteria Complete light fixtures. Switch to key switches. Paint stairs on each side of Cafeteria. Touch-up walls. KAESTLE BOOS ASSOCIATES.INC.-ARCHITECTS 416 Slater Road,P.O. Box 2590,New Britain,CT 06050-2590 (203)229-0361 Fax: 229-5303 Interior Renovations to the Timothy Edwards School Page - 2 - South Windsor, CT KB #94026 Punch List August 25, 1995 Sweep clean. Reinstall panelboard cover. Exercise Room Caulk wall penetration at exposed ductwork Air balancing. General Remove electrical supplies. Remove dumpster. As-builts. 416 Slater Road P.O.Box 2590 Now Britain,CT 06050-2590 203)229-0 361 fax(203)229-5 303