Loading...
HomeMy WebLinkAbout10 Linda LaneDEPARTMENT DECISION APPLICATION FOR HVAC PERMIT TOWN OF SOUTH WINDSOR PERMIT# Application is hereby: SpBUILDINGDEPARTMENT APPRO 1540 SULLIVAN AVENUE J Bldg.Permit# 644-2511 ext. 230 Pi Date( Building Inspector Application must be printed or typed FEE SCHEDULE Location of Job: 0 L,/ndr, La..*7 e.,, 0-$1,000=$15.00 Street No. Street Lot No. Over$1,000= 15.00 per$1,000 or any fraction thereof Tenant Designation Apt.No. APPLICANT APPLICANT ADDRESS 71 EDWIN RD APPLICANT PH 2 cj/ —D l g N S OWNER Ste-,gp m" n OWNER ADDRESS O OWNER PHONE C ESTIMATED COST$ 770 , OD IS THIS A CONTRACT COST? X Yes No f J o aj FEE ENCLOSED$ ( ;D flrr TYPE OF JOB: SOR•C New Installation Alteration/Addition/Repair Revised 4/01//2002 APPLICATION FOR HVAC PERMIT (Continued from reverse side) TYPE OF SYSTEM: TYPE OF BUILDING: HEATING RESIDENTIAL C COMMERCIAL VENTILATION INDUSTRIAL HEATING STEAM LOW PRESSURE LIMIT LBS. HIGH PRESSURE LIMIT LBS. HYDRONIC WARM AIR UNIT RADIANT HEATER EXISTING RADIATION ADDITIONAL RADIATION TOTAL RADIATION DESIGN TEMP. OUTSIDE OF INSIDE OF DIFFERENCE OF TOTAL HEAT LOSS(BTUH) OF(HEAT LOSS SHEET MUST ACCOMPANY APPLICATION) DESCRIBE ALL HEATING EQUIPMENT(INCLUDING MAKE&MODEL NO.) GROSS HEATING CAPACITY(INPUT—BTUH) NET RATING(OUTPUT—BTUH) TYPE OF FUEL OIL—GPM OIL TANK LOCATION:INSIDE OUTSIDE CAPACITY GAS—INPUT LPG TANK CAPACITY ELECTRIC—KW AIR CONDITIONING DESIGN TEMP.OUTSIDE OF INSIDE OF DIFFERENCE OF TOTAL HEAT GAIN(BTUH) z ex4HEAT GAIN SHEET MUST ACCOMPANY APPLICATION) DESCRIBE ALL COOLING UIPMENT(INCLUDING MAKE&MODEL NO.) TONNAGE'COOLING CAPACITY(BTUH) 73 VENTILATION DESCRIBE ALL AIR HANDLING EQUIPMENT INCLUDING KITCHEN EXHAUST EQUIPMENT) TOTAL SIZE OF SYSTEM(CFM) FRESH AIR INTAKE(CFM) PLANS MUST ACCOMPANY APPLICATION) FURTHER DESCRIPTION OF WORK THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE PERFORMANCE OF SUCH WORK. 90,3 sr Gr CONTRACTORS LICENSE O. 7TYPE TAT SIGNATURE OF APPLIC In DATE RHVAC-Residential&Light Commerclal HVAC Loads Program Enka Software D velopment,Inc. Connair Ora 77-3601 3-13-02 Page 2 Project Summary Project:Company: Hipoint H ating&Cooling Client: Steve Mann Representative: Steven Clark Address: 10 Linda Lane Address: 71 Edwin Road City: South Windsor CT 06074 City: South Windsor, CT 06074 Phone: 860-644-7846 Phone:860)291-0181 Fax: Fax: 860)291-0020 Comment: E-Mail hipointcooling@aol.com D ign Data Project Name: Reference City: Hartford, Connecticut Daily Temperature Range: Medium Latitude: 41 Degrees El vation: 19 Feet Elevation Sensible Adj. Factor:1.000 El vation Total Adj. Factor: 1.000 El vation Heating Adj. Factor: 1.000 Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel,Hum. Dry Bulb Difference Wint r: 7 N/A N/A 72 N/A Summer: 88 73 50% 75 33 Check Figures Total Building Supply CFM: 1,544 CFM per square foot: 0.972 Square feet of room area: 1,588 Square feet per ton: 432.313 Building Loads Total h ating required with outside air: 79,775 Btuh 79.775 MBH Total sensible gain:33,941 Btuh 81 % Total lat nt gain: 8,131 Btuh 19 % Total cooling required with outside air: 42,072 Btuh 3.506 Tons(based on sensible+latent) 3.673 Tons(based on 77%sensible capacity) Note Calculations are based on 7th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. B sure to s I ct a unit that meets both sensible and latent loads. Tuesday,May 13,2003 RHVAC-Resid ntial S Light Commercial HVAC Loads Program Elite Software Devel pment,Inc. Connair 6 Orapge,CT 06477-3601 3-13-02 Page 2 Proj ct Summary Project:Company: Hipoint Heating&Cooling Client: Steve Mann Representative: Steven Clark Address: 10 Linda Lane Address: 71 Edwin Road City: South Windsor CT 06074 City: South Windsor, CT 06074 Phone: 860-W-7846 Phone:860)291-0181 Fax: Fax: 860)291-0020 Comment: E-Mail hipointcoolingQaol.com Design Data Project Name: Reference City: Hartford, Connecticut Daily T mp rature Range: Medium Latitude: 41 Degrees Elevation: 19 Feet El vation Sensible Adj. Factor:1.000 Elevation Total Adj. Factor: 1.000 El vation H ating Adj. Factor: 1.000 Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum. Dry Bulb Difference Wint r: 7 N/A N/A 72 N/A Summer: 88 73 50% 75 33 Check Figures Total Building Supply CFM: 1,544 CFM per square foot: 0.972 Square feet of room area: 1,588 Square feet per ton: 432.313 Building Loads Total h ating required with outside air: 79,775 Btuh 79.775 MBH Total sensible gain:33,941 Btuh 81 % Total latent gain: 8,131 Btuh 19 % Total cooling required with outside air: 42,072 Btuh 3.506 Tons(based on sensible+latent) 3.673 Tons(based on 77%sensible capacity) Note Calculations are based on 7th edition of ACCA Manual J. All computed results are estimates as building use and weather may vary. B sure to select a unit that meets both sensible and latent loads. Tuesday,May 13,2003