HomeMy WebLinkAbout10 Linda LaneDEPARTMENT DECISION APPLICATION FOR HVAC PERMIT
TOWN OF SOUTH WINDSOR
PERMIT#
Application is hereby: SpBUILDINGDEPARTMENT
APPRO 1540 SULLIVAN AVENUE
J
Bldg.Permit#
644-2511 ext. 230 Pi
Date( Building Inspector
Application must be printed or typed
FEE SCHEDULE
Location of Job:
0 L,/ndr, La..*7 e.,,
0-$1,000=$15.00 Street No. Street Lot No.
Over$1,000=
15.00 per$1,000
or any fraction thereof Tenant Designation Apt.No.
APPLICANT
APPLICANT ADDRESS 71 EDWIN RD
APPLICANT PH 2 cj/ —D l g
N S OWNER Ste-,gp m" n
OWNER ADDRESS O
OWNER PHONE
C ESTIMATED COST$ 770 , OD
IS THIS A CONTRACT COST? X Yes No
f J o aj FEE ENCLOSED$ ( ;D
flrr TYPE OF JOB:
SOR•C New Installation
Alteration/Addition/Repair
Revised 4/01//2002
APPLICATION FOR HVAC PERMIT (Continued from reverse side)
TYPE OF SYSTEM: TYPE OF BUILDING:
HEATING RESIDENTIAL
C COMMERCIAL
VENTILATION INDUSTRIAL
HEATING
STEAM LOW PRESSURE LIMIT LBS. HIGH PRESSURE LIMIT LBS.
HYDRONIC WARM AIR UNIT RADIANT HEATER
EXISTING RADIATION ADDITIONAL RADIATION TOTAL RADIATION
DESIGN TEMP. OUTSIDE OF INSIDE OF DIFFERENCE OF
TOTAL HEAT LOSS(BTUH) OF(HEAT LOSS SHEET MUST ACCOMPANY
APPLICATION)
DESCRIBE ALL HEATING EQUIPMENT(INCLUDING MAKE&MODEL NO.)
GROSS HEATING CAPACITY(INPUT—BTUH) NET RATING(OUTPUT—BTUH)
TYPE OF FUEL
OIL—GPM OIL TANK LOCATION:INSIDE OUTSIDE CAPACITY
GAS—INPUT LPG TANK CAPACITY ELECTRIC—KW
AIR CONDITIONING
DESIGN TEMP.OUTSIDE OF INSIDE OF DIFFERENCE OF
TOTAL HEAT GAIN(BTUH) z ex4HEAT GAIN SHEET MUST ACCOMPANY APPLICATION)
DESCRIBE ALL COOLING UIPMENT(INCLUDING MAKE&MODEL NO.)
TONNAGE'COOLING CAPACITY(BTUH) 73
VENTILATION
DESCRIBE ALL AIR HANDLING EQUIPMENT INCLUDING KITCHEN EXHAUST EQUIPMENT)
TOTAL SIZE OF SYSTEM(CFM) FRESH AIR INTAKE(CFM)
PLANS MUST ACCOMPANY APPLICATION)
FURTHER DESCRIPTION OF WORK
THE UNDERSIGNED HEREBY APPLIES FOR A PERMIT TO PERFORM THE WORK DESCRIBED AND IS TO
COMPLY WITH ALL LOCAL ORDINANCES AND STATE OF CONNECTICUT BUILDING CODES IN THE
PERFORMANCE OF SUCH WORK.
90,3 sr Gr
CONTRACTORS LICENSE O. 7TYPE TAT
SIGNATURE OF APPLIC In DATE
RHVAC-Residential&Light Commerclal HVAC Loads Program Enka Software D velopment,Inc.
Connair
Ora 77-3601 3-13-02 Page 2
Project Summary
Project:Company: Hipoint H ating&Cooling
Client: Steve Mann Representative: Steven Clark
Address: 10 Linda Lane Address: 71 Edwin Road
City: South Windsor CT 06074 City: South Windsor, CT 06074
Phone: 860-644-7846 Phone:860)291-0181
Fax: Fax: 860)291-0020
Comment: E-Mail hipointcooling@aol.com
D ign Data
Project Name:
Reference City: Hartford, Connecticut
Daily Temperature Range: Medium
Latitude: 41 Degrees
El vation: 19 Feet
Elevation Sensible Adj. Factor:1.000
El vation Total Adj. Factor: 1.000
El vation Heating Adj. Factor: 1.000
Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel,Hum. Dry Bulb Difference
Wint r: 7 N/A N/A 72 N/A
Summer: 88 73 50% 75 33
Check Figures
Total Building Supply CFM: 1,544 CFM per square foot: 0.972
Square feet of room area: 1,588 Square feet per ton: 432.313
Building Loads
Total h ating required with outside air: 79,775 Btuh 79.775 MBH
Total sensible gain:33,941 Btuh 81 %
Total lat nt gain: 8,131 Btuh 19 %
Total cooling required with outside air: 42,072 Btuh 3.506 Tons(based on sensible+latent)
3.673 Tons(based on 77%sensible capacity)
Note
Calculations are based on 7th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
B sure to s I ct a unit that meets both sensible and latent loads.
Tuesday,May 13,2003
RHVAC-Resid ntial S Light Commercial HVAC Loads Program Elite Software Devel pment,Inc.
Connair 6
Orapge,CT 06477-3601 3-13-02 Page 2
Proj ct Summary
Project:Company: Hipoint Heating&Cooling
Client: Steve Mann Representative: Steven Clark
Address: 10 Linda Lane Address: 71 Edwin Road
City: South Windsor CT 06074 City: South Windsor, CT 06074
Phone: 860-W-7846 Phone:860)291-0181
Fax: Fax: 860)291-0020
Comment: E-Mail hipointcoolingQaol.com
Design Data
Project Name:
Reference City: Hartford, Connecticut
Daily T mp rature Range: Medium
Latitude: 41 Degrees
Elevation: 19 Feet
El vation Sensible Adj. Factor:1.000
Elevation Total Adj. Factor: 1.000
El vation H ating Adj. Factor: 1.000
Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum. Dry Bulb Difference
Wint r: 7 N/A N/A 72 N/A
Summer: 88 73 50% 75 33
Check Figures
Total Building Supply CFM: 1,544 CFM per square foot: 0.972
Square feet of room area: 1,588 Square feet per ton: 432.313
Building Loads
Total h ating required with outside air: 79,775 Btuh 79.775 MBH
Total sensible gain:33,941 Btuh 81 %
Total latent gain: 8,131 Btuh 19 %
Total cooling required with outside air: 42,072 Btuh 3.506 Tons(based on sensible+latent)
3.673 Tons(based on 77%sensible capacity)
Note
Calculations are based on 7th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
B sure to select a unit that meets both sensible and latent loads.
Tuesday,May 13,2003