Loading...
HomeMy WebLinkAboutTraffic report Nutmeg Village Y61 21 5 f-FAIE 0-3 4 GV)tn7e j Wl"Y zc'. STATE OF CONNECTICUT 4oN�E�rr��r DEPARTMENT OF TRANSPORTATION y ,�•^"`` 2800 BERLIN TURNPIKE, P.O. BOX 317546r OF I¢�I`g�� NEWINGTON, CONNECTICUT 06131-7546 Phone: (860)594-3020 April 16,2012 Mr.Andrew Krar,P.E. Design Profesionals 425 Sullivan Avenue P.O.Box 1167 South Windsor,CT 06074 STC#132-1204-01 Dear Mr.Krar: Subject: Town of South Windsor Previously Issued Certificate No.958-Nutmeg Commercial Center Current Proposal: Nutmeg Village R003 Nutmeg Road,L023,388,&438 Pleasant Valley Road Current Owners: M.G.Realty Limited Partnership/The J.E. Shepard Company/Eric A&Kristin R Eggleston Administrative Decision No.64 A review of your February 24,2012 request for an Administrative Decision regarding the subject development not previously considered under Certificate No.958 has been completed. Certificate No.958 issued on August 15, 1989 allowed for 500,000 square feet of light industrial use on multiple individual lots. The certificate requirements were not satisfied and the certificate ultimately expired. A number of the individual lots were subsequently developed with light industrial land uses. However,the overall development was never fully built.The current Nutmeg Village proposal will develop several of the remaining lots for 292,276 square feet(140 condominium units)of residential use, 15 single family homes, and 86,000 square feet of light industrial land use. It has been determined that the current proposal will not substantially affect state highway traffic operations in the area. Lieutenant Richard A. Bond,the Local Traffic Authority representative,concurred with these findings on April 16,2012. Consequently,an Administrative Decision is hereby rendered that formal State Traffic Commission action under Section 14-311 of the General Statutes of Connecticut regarding the proposed change in use is not required. The decision is based,in part,on the enclosed plan prepared by Design Professionals entitled"Overall Site Plan,Nutmeg Village, 100 South Satellite Road, L023&388 Pleasant Valley Road,South Windsor,Connecticut"Sheet LA-1,dated February 23 2012. The decision shall not be effective until a copy of this letter has been filed on the municipal land records,in accordance with the enclosed procedures,and this office has received a copy of the recorded letter. Upon filing of the letter,this office would have no objection to the issuance of any building or foundation permits associated with the Nutmeg Village development. Any future expansion or proposed land use changes shall only be allowed subject to review by this office and,if necessary,formal State Traffic Commission action. ( � a�(a3�a01 Sincerely, rt �etiV.�� l�—r lee / AT o2 ;i 5 p m Cr-< `�� RECORDED IN SOU B `' t cun; � David A. Sawicki By + n t TOWN CLERK Executive Director A,s5�s � State-Traffic Commission Enclosures cc: Lieutenant Richard A.Bond—richard.bond@southwindsor.org—plan attached Mr.Christopher Dougan—christopher.dougan@southwindsox•.org—plan attached An Equal Opportunity Employer Printed on Recycled or Recovered Paper