APPROVAL OF DESIGN FOR SEWAGE DISPOSAL SYSTEM
STREET ADDRESS: 51 Glendale Rd. TOWN:South Windsor
INSTALLER: TBD CT. LIC# EXPIRES: TBD
INSTRUCTIONS FOR INSTALLER
1. DEEP approval of project and granting of Food Processing General Permit must be completed prior to Permit
to Construct being issued.
2. This office must be contacted for approval if any change is going to be made in the system location,size or
design,or any changes in buildings or property line locations.
3. Any NEW sewage disposal system must conform to ALL requirements of Section 19-13-BI03 of the CT
Public Health Code.
4. ALL new construction to be under DIRECT supervision of a CT licensed installer under Section 20-341 of the
CT General Statutes.
5. The installer is RESPONSIBLE for VERIFYING LOCATIONS of PROPERTYLINES, WELLS, and BURIED
UTILITYLINES prior to construction.
6. Installer to notify South Windsor Health Dept.24 hours prior to the start of construction.
7. Installer to have septic tank covers removed at the time of inspection.
SPECIFIC INSTRUCTIONS:
1. Install per approved plan, (Pudeler Envineering, P.C., dated 12/3/15).
2. Licensed Engineer to field stake buildings, well (if applicable), permanent benchmark, and septic system. Offset
stakes to include bottom of trench or flow line elevations.
3. A bottom of excavation inspection is required. Original topsoil must be removed and replaced with suitable select
fill material. Select fill to be perced once in place.
4. Current Sieve analysis (within 30 days)for select fill must be submitted to the South Windsor Health Department.
5. Permanent benchmark to be set within 50 feet horizontally and 12 feet vertically of septic system.
6. Installer to schedule, and be present for final inspection with Health Dept. staff. Level to be set up for verification of
elevations OR an engineer's/surveyor's as built will be required.
7. Installer to complete and submit septic system as built plan and drawing with ties to the house.
SIGNATURE:i� V - V,S DATE ISSUED: 12114115
APPROVED BY: Heather Oatis, RS EXPIRES: 12/14/16