HomeMy WebLinkAbout900 Hemlock Avenue / 1900037 TOWN OF SOUTH WINDSOR, CT
PERMIT NUMBER DRAIN LAYER PERMIT
f
DATE: 03/25/2019
GIS ID: 41350900 FEE: 80.00
MUNIS APPLICATION# 201900494 ' k, � EXPIRATION DATE: 04/24/2019
APPLICANT''t LOCATION
NAME: BUTLER COMPAN 9'00 AMLOCK AVENUE
RADDRESS: 848 MARSHALL PIE--pg aO )XVERgREEN CROSSINGS RETIREMENT
yCITYPLACE
WINDSOR,CT 060 ^v
PHONE 860 68$ 804 5
ti s
WORK DESCRIPTION: LAY M�Il�`t�ND I AY LATERAL FOR (7T .DIN WITH CONNECTION
r N
n.,
All
THE DRAIN LAYER ASSIGNED TO THISPERMIT HS-A, ALID 1 ICI;NSE IS$UED:BY TIE STATE AND HEREBY AGREES TO ALL
THE TERMS AND CONDITIONS SET FORTffN' THEt-A-TE ACH D` NDITI4NS a k"L-WORK SHALL BE IN ACCORDANCE WITH
THE TOWN OF SOUTH WINDSOR STANDARDS,t�LL OS IA tE�UIREMEI*fiT ,�AND'.'v ATTACHED CONDITIONS.
th
ISSUED BY DATE INSPECTED INSVP�-E--CTED BY
3/25/2019 2:28 PM
•,
�i �
,v yY {
h
k.t(
40
Ar
e q
k(
K 'k
i
- i
i
T.DiN OF SQU'tH.WIND50RINSPEC"ON REPORT
. CONTRACTOR: -----
PERMiT ND.: . -
LOCAMON;
r 4 C
TYPE OF WQRK:
DATE 1 NSP NEEpED:
INSPECTED BY: D .
WORK IN
PROGRESS' Ste•-v+ �
<z 'lee • '
HED FILLED WITNESSED ❑� NO'
SEPTIC TANK PUMPEDr 5 r
AS-BUILT:
DATE: :.'
5(moHoyf forms aR7 i4
2M4 Town of SouUi Windsor•RIPSWT14 I
APPLICATION FOR DRAIN LAYER PERMIT
TOWN OF SOUTH WINDSOR
PUBLIC WORKS DEPARTMENT
TOWN HALL
1540 SULLIVAN AVENUE
SOUTH WINDSOR, CT
FEE $80.00
Location of proposed work: ��t7 Q v� y�' Lot #
St et No. Stree ame
` r
Premises owned by: l/ •G
Name of Firm: �� Phone:
Address of Firm:
a loop
TYPE OF WORK:
Lay House Drain ,• Repair House Drain .�. ; Sanitary Disconnect
Lay Lateral for bu' 'ng with connection V ; or no connection ;
Lay Main +
Lay Lateral for Commercial/Industrial Building number of acres
it t
Connection will be made with �10,e,,,/ G i
Existing Water Supply: Public Water�� Well
Proposed Start Date Estimated time for completion j
ALL WORK TO BE IN ACCORDANCE WITH TOWN OF SOUTH WINDSOR STANDARDS,
ALL OSHA REQUIREMENTS CONDITIONS ATTACHED TO THE PERMIT
Permit is to be issued to o,�L 5 the holder of Drain
f Layer's License No. &A D � Only holders of P-1 P-7 r W-9 licenses
will be issued a permit. PERMIT WILL EXPIRE THIRTY (30 AYS AFTER
DATE OF ISSUANCE. The undersigned Drain Layer hereby agrees to all the terms
and conditions set forth in the permit aqo attached thereto. Applicant has recephled
Town Street Excavation Permit No. AllA and/or ConnDOT Permit No. Al
CBYD No. I �1n�G�r S PLEASE NOTE:
IF A SANITARY SEWER LATERAL
IS WITHIN 75 FEET OF A WELL
IT MUST AIR TESTED
Signed: Print Name:
L' �&117ain Layer
Date:
Standard Forms\Permits\APPLICATION FOR DRAIN LAYERS PERMrr REVISION 3/2016.doc
O r
Y Town 0-psoud. ?d&U:1'40t
c
1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
sOR.C-0�w TELEPHONE(860) 644-2511
Richard Shank,General Contractor-Superintendent March 29,2019
Cameron General Contractors,Inc.
7101 S. 82 d Street
Lincoln,NE 68516
Re:Evergreen Crossing Retirement Community
900 Hemlock Drive, South Windsor, CT
Dear Mr. Shank:
Please find enclosed a reimbursement check totaling$1,200 from the South Windsor Water Pollution
Control Department. During the initial calculation of the sewer fees for Evergreen Crossing Retirement
Community located at 900 Hemlock Drive in South Windsor,Connecticut a lateral assessment of$1,200
was included in the computation. After further review of the owed payment, it has been determined that a
lateral assessment for the property is not owed as a part of the sewer fees.
Since we have already received payment for the original amount owed we are sending you a
reimbursement check for the miscalculation.
Regards,
-74
Tony Manfre
Superintendent of Pollution Control
c.c.:Richard,Aries,Water Pollution Control Authority,Chairman
T f ee"" Doolittle,Town Eng rteerj
SOUTH WINDSOR COMMERCIAL/INDUSTRIAL SEWER FEES
1.APPLICANT INFORMATION 2. PROPERTY INFORMATION
LAST NAME FIRST PLANNING APPLICATION#
GROCKI MARK 17-38P
COMPANY(IF APPLICABLE) ADDRESS
EVERGREEN CROSSING 900 HEMLOCK AVE
STREETADDRESS SUBDIVISION/COMPLEX NAME
EVERGREEN CROSSING RETIRE. COMM.
CITY STATE ZIP LOT#(IF APPLICABLE)
PHONE:
EMAIL: MARK GROCKI -VHB
i
3.HAS THE PROPERTY PAID A PREVIOUS ASSESSMENT?
] TOWN INSTALLED SEWER,UNASSESSED PROPERTY [X] DEVELOPER INSTALLED SEWER
CONTINUE TO STEP 4 CONTINUE TO STEP 5
] TOWN INSTALLED SEWER,PAID ASSESSMENT- [ ] OTHER
CONTINUE TO STEP 6
4.ASSESSMENT CALCULATION ZONE MINIMUM FRONTAGE:
MINIMUM ZONE FRONTAGE I or GC 100,
COST PER FOOT x $80 RC,TS (on Route 5),DC 150'
TOTAL $ - or RSNOZ
GD or RO 200
5. NEW CONSTRUCTION CAPACITY CHARGE
#OF WATER METERS 1-4"
EQUIVALENT DWELLING UNIT VALUE TABLE
EDU (TOTAL OF EACH METERS EDU) 0
BASE FEE x $2,655 EDU WATER METER SIZE(inches)
TOTAL $ - 1 < 1
2 1
6. CONNECTION CHARGE(IF APPLICABLE) 3 1.5
BUILDABLE ACRES 8.7 4 2
CONNECTION CHARGE x $3,845 6 3
TOTAL $ 33,451.50 8 4
.
12 6
...
7. LATERAL CHARGE(IF APPLIC eLE) 16 8
#of LATERALS 1 20 10
LATERAL CHARGE x $ 00 24 12
°�°- OTAt $ 1,200.00
8.TOTAL.F�f s :. OFFICE USF ONLY
TOTAL OF STEP 4
TOTAL OF STEP 5 $ - PRINTAND SIGN DATE
TOTAL OF STEP 6 $ 33,451.50 Capacity Charge is not applicable. Approval to
TOTAL OF STEP 7 $ 1,200.00 connect was in Jan '18. Benefit Assessment
TOTAL FEE $ :50- was modified in Feb `18.
34123[ SOT
ES GOOD THROUGH JUNE 30, 2019*
TOWN OF SOUTH WINDSOR
SANITARY SEWER LATERAL FIELD LOCATION
DATE OF CONSTRUCTION:
BUILDING ADDRESS
STREET
SUBDIVISION: t`P;�s red
NORTH ARROW
! i � 1 1 ! � I ' I 1 '• � i
I
A, /2
{
CONTRACTOR (PRINT) / NAME 0 CONTRACTORS SUPERVISOR (PRINT)
STREET ADDRESS tIGNATUIRE
gyx "?Z •� iO ATE
TOWN / STATE ZIP INSPECTED BY TO N
s B r" (f DATE
TELEPHONE NUMBER
WHITE — TOWN PINK — CONTRACTOR YELLOW -- CONSULTING ENGINEER / DEVELOPER
�01 N Sf4
' T-ov� O-P slot L V&U&ot
Ile
1540 SULLIVAN AVENUE® SOUTH WINDSOR, CT 06074
f�dsox co�� TELEPHONE (860) 644-2511
January 25, 2018
VHB ,.
Attn. Mark Grocki, PIE �"k
100 Great Meadow Road, Suite 200
Wethersfield, CT 06109 1
Re: WPCA Approval- Evergreen"Grossing Retirement Community
P&Z Application#17-38P
Dear Mr. Grocki:
The South Windsor Water Pollution Control Authority, at its Special Meeting on January 9, 2018, gave
approval for connection to the Town's sewerage system for proposed 1183,682 sf senior independent living
facility to be known as the Evergreen Crossing Retirement Community located ai 900 Hemlock Avenue,
South Windsor, CT, and as more specifically shown on plans entitled "Site Plans, Evergreen Crossing
Retirement Community,900 Hemlock Avenue,South Windsor",prepared by VHB,Wethersfield,CT;Project
No.:42263.00, dated 9127/2017; Drawing Title "Utility Plan", Drawing No. C-04.0, Revisions Dates:
11/30/17. This approval is subject to the following conditions:
1. A copy of a 20' access easement from Hemlock Avenue to SMH 2 as depicted on the site utility
plans;
2. The sewer lateral, pump station and force main will be maintained by property owner up to the point
of discharge to the public sanitary sewer;
3. Generator backup for the private pump station;
4. Provide maintenance plans and contact information for pump station and oil/grease separator,
5. Wastewater pollutant levels shall conform to Town discharge limits;
6. Discharge flows shall not exceed 16,000 gpd without WPCA approval;
7. A cp nection-charge�of$3,845/buildable acre,or applicable rate,at,time of connection;'
Ot? 8. sm
�A 9 5 of 61% $1,�f 7yor applicable rate at time of connection;
9. Technical approval of the Town of South Windsor Engineering Department; and
10. Final Authority approval and acceptance of the sanitary sewerage connection will be conditional
upon the installed sewer line having been inspected by the Town staff, and upon the written
verification of the Town staff that said sanitary sewer line was installed in substantial conformance
with the design plans approved by the Authority, and meeting all regulations and appropriate
technical specifications relating to sanitary sewer construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
s
Richa d ries, Ch
Water P Ilution Control Authority \
RA:ead
} '
cc: Michael J. Gantick, Director of Public Works
Jeff Doolittle, Town Engineer/Assistant Director of Public Works
Michele Lipe, Director of Planning
Chris Dougan,Chief Building Inspector