Loading...
HomeMy WebLinkAboutDrain Layers Permit 0559 Avery Street (2) 1500091 TOWN OF SOUTH WINDSOR, CT PERMIT NUMBER DRAIN LAYER PERMIT DATE: 1 I/19/2015gO w= GIS ID:06300559 FEE: 0.00 MUNIS APPLICATION# 201501720 EXPIRATION DATE: I2/19/2015 Wt 4i 0 5 i APPLICANT LOCATION W p NAME: MORAIS CONCRET S$RV. C ITC ADDRESS S59'A ERY STREET ADDRESS: 108 ROCUS STREET .F= OWNER SOUTHWINDSOR TOWN OF SPRINGFIELD,MA401)<�4 154}SU L IVAN AVE 4 s r sOIx WINDSOR,CT 06074 PHONE 413-20 j 217�r14 WORK DESCRIPTION: ItELOCT$ .AiL AS PART OF ROAD IEOQN> TI7G I ION PROJECT YfE .S'7. 1 'kk fi :. t 1 • 4 f t - h,v THE DRAIN LAYER ASSIGNED TO THISPE�IR HAS A ; LIGICIS1;ISSUED BuTHTr STATE AND HEREBY AGREES TO ALL THE TERMS AND CONDITIONS SET FORTS IN THL.,A!TTACI3ED`CQ ITI..:O7<I ' "ALL CORK SHALL BE IN ACCORDANCE WITH THE TOWN OF SOUTH WINDSOR STANDARDS,A A. OSHA TZEC�1 TIREMENT'S,AI D TEE ATTACHED CONDITIONS. 92 x ISSUED BY DATE INSPECTED tl/p 'SPECTED BY 11/19/2015 3:57 PM t _: xl .r ti 1 5 - 5 E i r - y i" TOWN OF SOUTH WINDSOR INSPECTION REPORT PERMIT NO:: I CONTRACTOR: Il ��1/ LOCATION: �5 5 4 -e r~t ✓ S � 'TYPE OF WORK: Ado NS-j-ry c-�H.o _ DATE INSP NEEDED: iG . DATE INSP:_ _ f-z6 i INSPECTED BY: �3 WORK IN PROGRESS: tto 54Ti rm— . Ow0- FAA a SEPTIC TANK PUMPED,SMASHED, FILLED 12/A WITNESSED []YES ❑ NO AS-BUILT-,-- INPUT: S/molloy/fbrm 2014 Town of Sauth Windsor INPSECMN REPORT 14 APPLICATION FOR DRAIN LAYER PERMIT TOWN OF SOUTH WINDSOR PUBLIC WORKS DEPARTMENT TOWN HALL 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT FEE $60,00 Location of proposes! work;_ 555) vt-(ZY Lot # Street No. Street Name Premises owned by: iCW,3 cf! T4 LAJI6ps, Name of Firm: Ako4'ts, lkkr Phone: 44; Address of Firm: la(5 �ncu_s S i�-r­k7-t -Sern�v(gr;� MA c�ito4a TYPE OF WORK: r LA-IsCeAL A' 90-: cf- ('ors 4Zr-CcraS; trTI" P(���C',' Lay House Drain ; Repair House Drain ; Lay Main ; Lay Lateral for Commercial/Industrial Building of acres Connection will be made with � � -- PUc, _g _ Existing Water Supply: Public Waterer Well Proposed Start Date I1-11?5 -Z5' Estimated time for completion ALL WORK TO BE IN ACCORDANCE WITH TOWN OF SOUTH WINDSOR STANDARDS, ALL OSHA REQUIREMENTS AND CONDITIONS ATTACHED TO THE PERMIT i Permit is to be issued to ti) the holder of Drain Layer's License No. J?x m U x o s 5 g Only holders of P-1, P-7 or W-9 licenses will be issued a permit, PERMIT WILL EXPIRE THIRTY (30) DAYS AFTER DATE OF ISSUANCE. The undersigned Drain Layer hereby agrees to all the terms and conditions set forth in the permit and attached thereto: Applicant has received Town Street Excavation Permit No. 152O"4 I and/or ConnDOT Permit No. CBYD No. `Zo1!-4�v T 2. 5.3 Signed: ' Print Name: Licensed Drain Layer Date; Standard Forms`Permits\APPLICATION FOR DRAIN LAYERS PERMIT.doc TOWN OF SOUTH WINDSOR SANITARY SEWER LATERAL FIELD LOCATION DATE OF CONSTRUCTION: 14pri' l ZCo Z� BUILDING ADDRESS �� STREET .5 SUBDIVISION: �I NORTH ARROW 1 IW L.......i__i_._L___�_..._L_. ____ '.. _._ _-Li o fie;s nl7c-,ry-. A z n4 i�� a CONTRACTOR (PRINT) NAME OF CONTRAC OR'S SUPERVISOR (PRINT) /U STREET ADDRESS SIGNAT6RE Ld DATE ,- -,)(e o T04N STATE ZIP INSPECTED BY TOWN DATE TELEPHONE NUMBER WHITE - TOWN PINK - CONTRACTOR YELLOW -- CONSULTING ENGINEER / DEVELOPER