HomeMy WebLinkAbout86-48 Park Centre Plans cIL-IZAiG
-)F
MA Y L—FIT CO3
PARKING SGHEDULE
T23 8E
S 7,(:,,'-/6'-ZO"E
73
ell
Th Ze
Business office
space / 125 S. F.
74 am WL
2688 S. F. X' 1, space = 22
-r '22 Spaces
125 S. F.
/94EQ
PROpt-II GPqVEA, Industrial and wanufac,.turj11g
space 2 employees
DE
Q
ZS"R-��-9 20 employees
_�_e�mployees
!!�Wp 1 Handicap space per 2S Parking spaces G TF_
space Ospaces
Peop DrE
Ab C 32 spaces x I handicap I handicap space
Allr- MliY DG_P77.
�5 spac�s' ZZ
67
73. 7
X:
CO. IAJC.
Totalspaces required 32
OLMAP57_F_ 73 X
PROP parking spaces
V) GM CoJ`-ACP_F_-nF_, PAC) ce "C." W1S?-0fJ,_'A0E -E�= cE Parkin� Provided &
-7-- 73.S
PV
_P)e'op 81T PAVC-1,4GW-r
PP
2. C C.,
34 Parking spaces
T (9xl8)
R7 2 Handicap space (15xl8)
3Y7 go
PCDP C-8 "C-4_"
7-F -7,e.6
69 70
Z
)LEGEND
POC UkZEZ /-r-r Z4
C4f rSS P3 ZD7' A D T',26
EXIS77MG
-X ... ...... ---------------------- ............ ........ .......
............. .....
..............
..........
ZZ
X r, 1_0
......... ......
-..... .....
...............:::;: .
............. .... ..............
.... ...... ........
A
.....................
7.Z 45
.. ...... .. .
te
5TIAJ& SPCr G
. .................... .......
......... SCAU-E:
...........
............
..........
.....................
.............................
........... ........
.............
......................
....................
-73
.............. ............
.............
... PJ�Dp, S&414
....... ............ . ..... MAiAj
to ......
....... 76. 1 NO'rES
..............
....... PROPC)SED....................
............... ..........
..........
...... .........
. ..........
................
................
.................. .............
..................... ........
. .... . ... .................. ................ .......
...... ............. PROPDSED -5AAL)rqZy �S�F raken -fro
��_,X1571AJG SAXIMIQZY...... 70.0
.................
74
...... d ^wetlands.
. . . . . ........ ...... .................................
.....................
InlandVetlandsMap.
.............
........... F—X1SrJAJC
..........
.............. ...........
_rp
PCOP
...............
..........
.... ... h
................ . ............
.......... ......... ...... ..... .. .
..........................
........ .... ......
.......... ......... ........
............
.......... .. .... ..
n
ot directed at adjoi y
...... ... ... p um
....... ...... SAII r_V SEWF=z (KE-Y M,4;>)
..........
..........
...........
(K,--y mqp)
S
................
..................
.............. 73x3
...............
............................
.......................
...........
..........
...........
.. ..................
. ............
.... . ..................
....... a 500-yea
............. .......... .............. ......
. .......... .
...........
........................ ............ .......
............
.......... ...... . . ...... ........�?..........
.......
............
........... ..............
F
e Map South
1980.
... .......
.......... ....... .........
............
............
.. ... ...... ........
............ ..........
... ....... ..... .... ....... .
...........
.. ............
. ..... .
............... ...... e
-7
176.
74,1 Power Co.
176-71
ting utilities obt ined
517-E g�27,-4�
-WCCP Contractor '
....... t
c
7( all beforeyou- dig
X-0
ZON F_ - T_ P
C o ify depth. and
-/9eEA -
407
C, COAX, location of .util*
ities.
FIZOPuSEc) 8Uj4_01hjC, qZEA
qe
TO"qC PZOR)SED ImPEzvlo
US C0%/e-ZACE f
Pro PUS F_D R5A K_ 1-4EJ C,N 7-— 16
ce 73 PP-OP10SCID EAVE HF_1CM7- c7,—.,,
TFX 1540 SULL.IVA S0146� ve"6t
N AVENUE - SOUTH W,NO504.
AREA CODE 203/6444511
Z/Ds ygeo VAZD ,jNe
HbCP '2
s4tember
'0
Mr. Peter D'Engenis
X_
kilo
Pvlv-r Tyr
I I
TYPC-
1191 TuMblebrook Drive
P 7b A�E 1`__r4tzrJKG 3R9CF_= -Jot R) kJq1_FU_r= South Windsor, ct. 06074
P
90 (7-,/P)
'6177 Cj S
Pe:
APP. !117 S
ite Plan
79� o
Parked tre
ised that the Planning & zoning PZi0n voted on
September 9th to ap v n for�a -site plan of,
Please be adv
M.S. SOUTH WINaSOR-COWC 06074
PV 1540 SUILLWAN AVENUE development for oroperty located
F_ Z,E-T as Nutmeg-Road S�uth
P T�i AREA COOE 203/644-2511 shown
(A mberg & Russo, daEeq 7-2i_a&,'
subject to the follo,in
-7.3.8 The Pians should be
............ CE Modified to �indlca
68.9-1 SCptembi�r ig, .
1986
2, The landscape m to'ind
PV CE icate add
ZD/Z &t,IA.J Ale F_ I M7- RTIFIED MAIL a itional
Peter D'Engenis n for
h
n viets Ass
dated 9-6-83- ociates,
; 0607,1
IT OE MII 3. A b'
Commiss
X 72./19 submittea,to this
RE: ppo oad south P
ion to
6�9. /QL)TME— G soUTH ro work,
19 must be
s� bject to the ndi,tions'af
tion commission Approved with conditions p aaroval of
he South Windsor Inland wetlands
C6 770tZ, guncy/Conservat pi� the'
l
06 LOti22 Nutmeg-
OE sc'T ' 6. No b' be ,issu6d until the fin
P "c./c -rot- n been.
.3
the Town 6lerk's o
to for
.......
o ce. il v
39, CCP
P_ 6a
00 . Black
and white transparent
7a Z3
mc'asures th this le
tter
for o e oies, .must be
s submitted.to this
been' COmmi0sion to kp stamped and -signed. AfEer it h
14.G. 2. We recommend a bond in the am in th signed,. the mylar wi 'ret
T)=:72.Iq .11 be urned to as
You and 6u3t be filed
to Planning ted
o -in 1 90 days_
66-44
tation
''Yours very truly,
fZ,-: osc ctivities �je : PLANNING zoNING
f o COK111ss 16N
E�9$EMCAJ-r,!AJ 1`7A� VbZ,oF
F04i-rtq1_J Ey
Vg
-EJCT- armless te.-Town C
-BW
S7 n shall in1
y
Of Southiiindsor
Erom-the propose D'Auria
it CC:
Messrs. a te
e rT q
for one ye -IS a
September 15, 1981.
Very trulv yours,
EROSION SEDIMENT QQNTRr0)1 P
14.
AN KEY
aMI:d1b
PV PERMANENT VEGETATION COVER CC: Codservation Lt,,ission
To 1A
es CLIP"[ W
Richard KEY - MAP
7,2. TV ION COVER 10ulse Evans Chai
Tr_
PLOT PLAN
Itnan. PZC
"=Vias D Aur- : , .; ... ,
Z�ClSr. 7) RR RIPRAP n Ocal
PZDF�-r)= GTZ)PM A4H t4arcia Banach, DirZ�tor of Planning
Michael C-Antick, Di'-
'DETENTION Joe Russo, Palmber6 rector of Public IsbrkS
DB
BASIN
Fbbert Kaye, Balf e,,,& RUSSO
Tnhn qun.
CE CONSTRUCTION ENTRANCE
PETER YENGENIS
64, 7&
A P.-
heloa- Int coordikor,
ST SEDIMENT BARRIERS
P
NUIMEG ROAD SOUTH
tA AJ
OP
OUTLET PROTECTION
EZC- -SAVIN w-Neks wc- CT
S9UTH WIND50
A4AP
E'M EAJ'
V1TVF_4() p,,
/7" ST q A
Pe
'Opep_ry 01=
1-16ez-
W4 cer
----------------
Till Po
mop
R
is
TEMP0fZAZy ii5TocxPi/_e
-)F PARKING SGHEDULE
M/,= AAAY LEPT ST6RES fO- lrJC.
Parcing Required
73
='P. 710 8E
Business Office space 125 S. F.
Tz� i3� S
2688 S. F. X I space 22 spaces
125 S. F.
1_07F'22
=2-02 Qc, Industrial and manuf-accuring space 2 employes C�%Jkl I
PEOPC>5ea Gi?
20 employees 1 space 14
L LA ?Z'ZE19 IZ AIIE _ = l0spaces
2 employees
I Handicap spaceper 25 Parking spaces
aces x 1 handicap
---------- ------ 32 sp . mgy nef>T-
- 1 handicap space
NO CU 25 spaces 6TORZ5 CIOL Jmc.
V)
OL)m
poF. P67-F—P— . ......
-PP-OP 13177
W/-,7-CXr_,q0G: FFAJC�
PV
0" Ell
77- 7.3�5 CCV,1C_CF_r_F_
peop
T P 73.6,
Z
PF40P.C-13"C/_" /2Z'7Z
Ar 69,75 T-F
70
/_0
)LEGEND
72-Q
cottMue% JV1144P
...........
............
.......... E_yJ,5T1MG SFOr GZADE
A
..... ......................
PROPOSED z5t�CRQOE
A,
4--73 e—Z mAim
F-OPC)SED "qn_=Z
OT E S
72
..........
:76.1 ZEk16T1W_> SA"rrAP_y ->eweZ
fro
in inland
7,1- -wetl,ands. 'raken u
70.0
LL PRoPoGED SAAL)r4" sF_,I;jeZ Inland .Werlands Map.
...........
..........
...............
.. .... rop TP-EE t
P
T07ZM 5EWEE
South.
P tmeg Road
SAJJrrar_V GF -X (KEY MAP)
j oining
.... .. 5E�-JEE (Kj-=y mAp)
.......... S
STAKED
...... 73x3
...... d with a 500-year
......... ..... UG44-r flood limit based upon
...... ....... FROFC5ED Cj`T;i�pF
..........
Rate Map South
T
I N
....... by Connecti
..... Po'
..................
...........
i�..........
.. .. ................ .
. ...........
....................................
. . .......
ing u'tilities obt.ained from Utility C panies.
76. 76.1 74, 76.7 ......
. ...... efore you dig L-800-922-4455.
call b
2,qv
C014C. r_ P
74G, 7 rify depth, and location of .utilities.
7&7
/_0T /9JEtZA 2-0Z
Icp
PWFUSEO GUR-01MC, qZEA - /8,20C> S.f--� engirieer,
COAJC, SiC:IEA)
IFV -C, 'OP PIZ'PWP05r--0 E,'9VF- HEJGH-r 14.5 ?Z)&2&0t.
70-Wn
74- 1540S
LLIVAN AVENUE SOUTH WINDSOR,CONN.
AREA CODE 203/644-2511
T 74.S
7 77 S�Ptembdr 22,, 1986
(TYP) /S xI
VAZD IJMZ
HOCJ C J-=
M s
rive
1.k
Typ's
SouthWindsor,
Ct. 06074
f*_ (0 SF�90E
>
P 7o t36 ;�Pp- Site Plan
Re:
C14 P Lot
12 Nutmeg Road South, Parkr-entre
lip
d that, the P1
r,-r anning zoning coLmi
74 September 9th to approve the above appli
cation f6r,a site plan of
development for property 1-
F7
ocated on Lot 122, Nut.rneg'Road South
1540 SULLIVAN AVENUE SOUTH WINDSOR.CONN.06074 g Russo, dated 7-21-
86,
AREA CODE 203/644-2511 subject to the fou
PV AJ-7-10-17 -520"W I. The plan
U\ s, should be' modified to �indjcate sewer
t to a"manhole. th70 Tl=- '73.
SePtembi2r 19, 1986
CE 'indi,
conform to da te additional
the streetscape plan for
rr_ ED MAIL Parkcentre which wa
--------------------
s prep
Eafe PkI Alan,viqts, , sociates,
Pv IJJAIE
3. A bond inthe amount
mi;Lted to this,
f $5,000 sh4ll, be sub
landscaping.
miT 0
—FMIDC L-!—A cement of any sit� work, a mee.ti.ng must be
M held with Town staff.
MUTMEG soUTH
s subj '
ons o
inland wetlands A '
p f of tb e
# orflot#22 Nutmeg' 6. No b' gency/cons
ill be issued un
EXIST C6 770P f maining space ta, been ylars have
A UE
til the final-m '
be leased to small business ti filed in the Town Clerk'a Office.
7O- f- - The following condi
Black
and white transpare
nt mylar of Sheet A.1, w*ttI this letter
reproduced thereon, together with three blueprint]..copies,,.must be
u include erosion L submitted to this COmmi)js�on to
s ned.
signed,. the mylar will
been tt h
h 's offic' be retur ,.
W om bond the amount
7a P-3, CZ ted e- within 90 days.
COmmission to ensure compliance with very
Yours
TF:72.Iq
tat
PLANNING ZONIZiC, COMMISSION
b l
o er. 13
67. 54
Vg
Evans,:t;i1a
harmless
F-i9seme UT im i=AV0Z'(0F -Town
the
o gainst CC: Messrs. D'A" e
s
from-the proposed operati
METROFn�,)TAM USTZCT" on or use._r one year and shall expire an
GG September 15, 1987,5.' The pe
dorm 1-1. Mora
^M 0�P nc
EROSION R SEDIMENT CONTROL PLAN KEY Inland we
M
codservat3.on Cbmmission
CC, A. B. Davies, jk�puty Ittwn Engimaer sor RAAP
PV PERMANENT VEGETATION COVER KEY PLOT PLAN
Richard Martel, Town r 3incer
'I'Oui- Evans, (liaiman.
11ZC
TV TEMPORARY VEGETATION COVER
ThCI— D'Auria, Building Official
TP
SSMH OP-OP TO 1A7CH - _Z
r
P P-0 P. GRAbe- 72. Banach, Director of Planning PLAN PREPARED FOR
i�1 Michael Cinticj,, Director of Public 1brks
RR RIPRAP
G7DP_M MH Joe Russo, Palr.qeg 6 �,S,,,
DB BASIN
Ba IF CCMpanV
PETER UENGENIS
re-= 6�7.76. VPIO=nt brdiotor
CE CONSTRUCTION ENTRANCE
9- 64, 7&
ST SEDIMENT BARRIERS
SQUTH WINDSOR, CT
OP OUTLET PROTECTION
P
EDCIF_�M6�j�i zlqvlQ BIE07�9&es lklc.
/-Z,
n,Z 14/AJO-
V�
-T AE�_ r
At)'.
1 fit
t�4 "J7��-ICG 1Z0 /a-0-Z6-(D Peopeery op VEY AS
0 F A'�_fA P SinUT74
----------
W(Alasosz,CT. ESSIONAL EkINEERS
/P-40 LAND SURVEYORS & PROF
VE THE COWIECI U1 AS A_-%-1_EN'DED BY 148
<
v B A�WkAi�DWR OnAd�Dn
_y0
116, INC, EP
BLOft
L ECTICUT
FIELD, CONN
7
242-2775
BY -------RATE
zispor:illy sssded','uid ged with haybsles` to. prevent erasion if it
is ao ze�ia croxe ,_c��n �o days
Zht=e i;' toba no .'stockpiling of soil °within a ten fool 13a►it of
adj'oia3ag.propert es,
r_1. i1 -
i •• 1
1
A , A
PLAN! TP"pASED TO �rrA-r °�
E
DIRECTION OF THE ENGINE ER /
4%6
/ 3
1/2'a_,—NORMAL FINISH W%hZE
rl r/T"Nlk "1 }•� . _ _. — F - •- t jj�� 71Sb�-�iX16ED
r r ACIENT TO CATCH
•� �; . `w , r ! , BASIN AS DIRECTED
04
OPENINGS
Off 01-
EUVATION
*4 SS�ANDY SO I.S
r 1 r.� h, A V/Ai-l�1 " CI A417A CYNAX'
2. Plack and stake
straw bales.
two stakes per
bale.
4. Backfill and
compact the
excavated soil
as shown on the
uphill side of
the barrier to
prevent piping.
T'. 1'. A• 6ra.>,I••> -
_ 3Cwr VALaO
its I ..vIti1 : r �f +r�r-Ic rsNa Geov.+o
Aff A or T 4WV t irnty wir"r rfrlrr psi/
EHO VIEW 510E VIEW
•r F ► A-y DAAA-. •-r& °e EMOrVVEO A' IN txl9rr h GRO ao
. t D-7�5T.tR
TA I L
WAY M,0WBALEP YGpJTR4L 0AtiOEA.
! tc . 11 l' : "T. S .
/ P`l
PPS �
2'` C2USN� -
\ STtaiJ�
,Licem ` (5ATF'�1C
L
mo tJ S-f
MtRAF I �
CKmao
it
8rr come. cx qss -L[-
Z" 13)T. CcxJC. GWSS 2
FQ.00ESSt D 3 oqr=
IZ" GPRVe-A B4SE
1?M PAC'T"ED SUt6- G�t9I7E
TYPICAL SECTION
PARKING LOT PAVING AND
BITUMINOUS (�ONCRETE LIP CURB.'
NOT TO SCALE
MA,X <D'wwa MAX,RAMP
CwB f�P{R f'T
t„F dAC Cf }wt,n r"AA
•M
Inc
/ACC of Cvna WAW1+�
Ty
1u,r. q
;v.•.u-* J1 G
DETi�)1•C..
PRECAST
TYPE a MANHOLE
B
F!-AgE CUT =:'NOS LAST Z"
A � ��� 'A PORTICN CF STRAP ENC=SED
IN MASONRY SHALL BE
C0A7`ED WITH BIT UMASTIC-
a
OR ZINC CHROMATE PAINT
ALOMINUM STRAP
(6061 T 6 ALUM.)
SET
TOPOFPIPE �'•" R-4
BTO SERVE ASSECTION C-C BAFFLE 1 I
-CCNNECTION OF PIPES TO MANHOLE WALL 1 i t —'—' i—� /2�
PIPE
TO BE MADE WITH BRICK OR CONCRETE [ � I Id'xIO" FCRGED ALUMINUM-
MAS014RY, CR AN ELASTOMERIC TYPE OF I 1 I ) SAFETY RUNG MANRCLE
SEAL, APPROVED BY THE ENGINEER. _ STEPS 16' O.0
MOC "STANDARD FRAME .a REMOVE PORTION OF DROP STEP OE TAIL
COVER" OR AS SPECIFIED PIPE TO GONNECTAS SHOWN
TOP STEP TO BE _ 9ALE CETAIL
4" BELCN FRAME BRICK VARIES FROM 6" TO 1B"
T— � C`'. REINFORCED CONCRETE MANHOLE`
SECTIONS CONFORMING TO AS: -,St
r�iI s C478 WITH"0' RING JOINTS CON- f1 �•
� =F r• FORMING TO A.STM. C443 Ir l�—
y
ECCENTRIC PRECAST RE114FORCFIL
D
-� -- MH CONESL
��� •.,:, LAY PIPE TO UNDISTURBED SOIL
C , ;I C-8"-OR 10' SEWER, CAP END IF r i� C
PRICY CR 1^n i.• ORDERED
CONCRETE I _ i
WAT_R 3/8" D[A. ALUMINUM P!PE S T RAPS, :L
7ABL° Ste{— •, SET AS ORDERED j
S.
"I -----11 ASBESTOS -CEMENT OR PE 1r'nC
a PIPE a 90• BEND AS CRDERED ,
\ FILL EXCAVATi D SPACE GUTS;DE ,1 r✓
MANHOLE a UNCER PIPE: WITH
CCriCRETZ OR MASJ^.NRY FOR "X
'•••''; .. 'VDTH CF a' EACH SIDE CF =1r%K' �•• _
• . - - - MIN. WIDTH 22" cr..
...._.S=CTICN-A-•A+ �6" OF --14" C;;L•St;ED S70NE—'
FOUNCA-;CN
NARRATIVE
.The nrgposed site development for'Peter D'Engenis is located'.on. the north
side of Nutmeg Road South .in South Windsor,Connecticut. The site is
located in Zone I.R. and the lot size is 2.02 acres. The lot -.is bounded
to the north by May Department Stores Co. Inc. ,,west- by S.ta�idard Print:ir�g
and east by land. of Savin Brothers, Inc., A. I., Savin .and Hartford Jewris'j�
Federation.. .
Two-typesof soil.are'underlying the site; Walpole `Sandy Loam', Ninigrec..
ine.Sandy'Loam. The first being classified inland wetland type soil..,!
o 9100 sq, ft. buildings`parkinglot and truck loading docks are to bei'conscructed
in. an area of approximatelyll.28 acres of Lila 2.02 acre lot Any disturbed areas' within
the development not to -be built or. paved on is to be permenently'seedeo as.des-cribad
later in the narrative. Total impervious coverage of the -site will be; ;,approxinaeely
3. 8%.
e site is serviced by public sewer,'water.and electricity. .Theeutilp:Eie's servicing,'
the site shall be'underground._The'storm drainage system has been'despgned co.. connect
o the existing storm sewer .manhole at the. southwest corner of. the loci.; Refer to -the':
rainage study for specific details and runoff values .for the proposed,,,site-'de�,e,lopr�-czt.,
e site development for Peter D'Engenis Is buildings'' will. 'begin Lipo.�1',appreval e.
be site -plan or shortly thereafter. Prior to any construction accivi ies,-const.uc
ion exit pads are to be installed at the 1'ocation ,designated on `plans' is ollawing the
tallation of the construction exit pads, sediment control praccices;,ani measures
hall be installed at .the, location desingated•.on the approved 61',plan.
ybales are to, be in the ;area of construction' at 'the base of coat and fiill . slopes
rior --to any -lanai disturbance. Haybales and all. erosion and Sediment �'oncrol 'Prac ice:,
re to be installed:, applied and maintained throughout the ' proj ect in �Iccvrdar.ce d r'n
he guidelines as described on page 3 of 3 of the Palmberg &,Russo Pl.a�s..
-
The first.major land' disturbance on the site of Peter D'Enge- s will be �he-stripping.of
topsoil`in the immediate area, of construction.' Prior to any stripping oetopsoil•hay-
bales are to be installed`.in area of construction as designated on the pans. ;All erosion
and sediment control practices are to be repaired, replaced and maintain d throughout the
project by the developer in accordance. to the requirements outlined on:P"ge•3-of 3 or un-,
tit all disturbed areas have become permanently stabilized' The topsosl;is .to -be ,stock
.piled• at the location designated on the plans. Haybales are to be insta;led along per-
imeter of the stockpile to form a sediment barrier Temporary seeding a!,,topsoil stock-
piles shall be completed within 15 days of its formation'as outlined in the guidelines
for temporary vegetative cover on page 3 of',3 of the -plans by Palmberg & Russo., ,If -the
formation of the topsoil stockpile does I not occur 'during the 'seeding data (i.e. . winter
months - September 15 through April l) the topsoil stockpile shall be tly.mu1che dPorari
as outlines on the page 3 of 3 of the plans by Palmberg & Russo until a tjemporary veget
ative cover can be established. Topsoil shall not -,be placed while in a ifrozen or muddy
condition or when the subgrade is excessively wet
The next step in the cons truction' sequence is the. grading required'for the construction ;.
of the parking area, access drives and exposed areas. The soil erosion and ;sediment con-
trol measures and practices implemented prior to the .stripping of topsoils,should be 'in-
spected for repair, replacement and, maintenance, prior to any land distuib-Ance'activities
commence upon completion of final grading, all graded.'or disturbed areas'hot to be,built
or paved on shall be permanently stabilized. If seeding cannot be ,accomplished during
the recommended seeding dates ,(April l through June..1 and `August.l5 thio;jh"Septembtr 1.5)
the disturbed and graded areas are to be temporarily mulched to stabilize "the soil until
seeding can be accomplished during the next "recommended seeding period. 'If rough or final
grading is to be delayed for more than 30 days after land disturbance activities have
ceased, the disturbed areas are to'be temporarily vegetated or temporarily mulched if
seeding cannot be accomplished' within the recommended seeding' dates.'` When 'land disturb-
ance activities occur between the months of September 15 to April 1, spear:ial`attention
should be taken in assuring that the exposed and disturbed areas are sufficiently mulched
immediately after final grading, until seeding can be accomplished during the'next,re-
commended seeding dates and all sediment barriers -shall be checked periodically for any•
need of repair, replacement and maintenance until the disturbed areas have been permanently
stabilized. Upon final grading, haybales are to be installed at -the base',,of-cut,and fill
slopes as designated on the approved soil erosion -and sediment control p1?n.
The construction of -the building should begin after the site has been rough.graded. Areas::
to be filled shall be stripped of topsoil, vegetation, roots, rocks and:drher objectionable
material that would result in the construction of unsatisfactory fills !Fill should be
placed and compacted in layers not to exceed 8" in depth and shall .be,fr4e,of.brush.'
rubbish, stumps, logs, timber, racks, building debris and other objecti64able'material that
would result in the construction of unsatisfactory' fills: Fill should bei'placed and., -
compacted -as required to prevent erosion, slippage, settlement,;eXcess s4turation.and other'
related problems. Frozen material shall not' be -used fore till nor shall Rill be placed and.
compacted on frozen ground. The fill required for the construction of ttie building shall. ;
be placed and compacted in accordance with local and state requirements atd;codes.
l
The parking area and access drives are'to be surfaced with fbituminus.pav4ment`at the'com-
pletion of final grading The construction of:the.building.shou,1d be co4pleted prior to'
the surfacing of the parking area and access drive with bituminus pavement.
The erosion and sediment control measures implemented throughout the projPact, 'shall be
maintained after the development of the site until the disturt d areas hs-re'been
permanently stabilized and vegetation has been established. Not until the disturbed
areas have become permenenlly stabilized in accordance to the final erosion and sediment
control plan shall any control measures be removed.
s
,ZEV /O -g- 8,6
0 *4,
A
PLAN
TH13 DiMENS10H MAY BE
INCREASED TO11/rx( THE
DIRECTION OF THE ENGINEE-/7
41)K
A CO"CRETE
P1 PLACE
FiRIECAST CONCRETE
H`'i
7$
PONIVIOull RAWILL ABOVE
T14 3,
..lr3 ELEVATION W"WKN
I S. , 101.1
0
T-P -N SANOY—SOK-S
MMY4 WALLS
ODUICCKRMCLA LUftN"A
TYK J�. *0ooT
R
Sn
PARft04ECTIONe SHALL XXEMD INVDE OF
�O%A& on 4% 4" LIMITS HUM IrY A Or
Ky
99CTION A -A 3ZCTiOt1 0-0
$E�T IONS
WHILN HEIIINT EXIC11"11 10% STRUSYURE WILL K
Pr`E114" TT yF;R9CM
MY A' 10 OW Of
WIN.
A&
DWI TO WVJMN
IM --7CC CATCH BAST TW- SAM.
straw bale
trench - 1. Excavate a trench stake 2., iiack and stake
4" deep and the straw bales.
width of a straw binding .1 J 1. two stakes per
'�fba e bale. wire or
width twine bale.
packed
strawy 3. Wedge loose straw compacted 4. Backfill and
plan I.., backftli between bales to compact the
create a continuous excavated soil
barrier. as shown on the
uphill side of
the barrier to
prevent piping.
n
HAY RALLY - •.':,':I,
J
•1 Gcowo
T ---� `
T U rl7U
210L VICW
91,
q" �-H �-,.
milli.
--�. �16rlll
IT Pkc)
11 81T CONC., Clc,qsls IT
Z" 13)T. ccvic- C."Ass T
11
PECC-ESSE-0 3TC0,3E
1z" GZAVEI- 8,4se
:OMPACrp-z SU&CP-ACE-
. TYPICAL SECTION
PARKING LOT PAVING AND
BITUMINOUS CONCRETE LIP CURB,
No-r TO SCALE
1:r($1 r -Mi'mim
RAAX 46-44A. VAX.
J C *P(q rT
BACA Of WkLK
/7
ACC Of C(Ag WRWrrG
S1fl�'•WA K RA P iYP
�-)XJZIW&
TYPE a MANHOLCE
B
%0, FLA
RE CU.
A -A PORTICN CF STRAP ENCASED
IN MASONRY SHALL BE IL t=ATED *RMrI 3ITUMASTIC-
-J OR ZINC CHROMATE PAINT
22"MIN.
ALUMINUM STRAP
(6061 T6 ALUM.)
LB SET TCPOFPIPE
TO SERVE AS I. —A]
SECTION� BAFFLE
PIPES To m '10
CCNNECTIOI�OF LE WALL
TO BE MADE WITH BRICK OR CONCRETE ]i tP'PE 14".10" FCAGED ALUMINUM -
TO LASTOMERICTYPECF I SAFETY RUNG MtNWCLE
NRY,CRAN E L STEPS 16 .1 ac
SEAL. APPROVED BY THE ENGINEER. '
I I
MDC -STANDARD FRAME .a REMOVE PORTION OF DROP STEP DETAIL
COVER" OR AS SPECIFIES PIPE TO CONNECTAS SHOWN
TOP . STEP TO BE BAFFLE QFTAIL
4" BELcw I FRAME BRICK VARIES FROM 6"TO 18"
P/4- 71A.
fit,REINFORCED CONCRETE MANHOLE
SECTIONS CONFORMING WCFORMIG TO ASM
n 1.111
I
C47
a WTTH "0" RING JOINTS CON-
FORMING TO AZT.% C443
ECCENTRIC PRECASTREINFORCED
MHCONE
SEE BAFFLE YLI
F 7.7
LAY PIPE TO UNDISTUPSED SOIL 41 T
C e'-S"-OR 10" SEWER, CAP END IF
C
ORDERED
PRICK CR
CCNC-RET-
V,
MATE 41 1 3/8" DIA. ALUMINUM PIPE STRAPS,
R TA rL f' SEI AS ORDERED tl
8" ASBESTOS CEMENT OR PLAS 7-C
:;6, MAX- PIPE a 90* BE,'JD AS CRUERE-11
\FIL' EXCAVA" iTS;DE !,:; L
TED SPACE C1
MANHOLE a UNCER PIPE WITH
CONCRETE ORMASONRY F
WIDTH CF 6' EACH SIDE IF PIPE
22"
OF CPUSHEO S-ONE---
SECTICN A -A 10 N 06- E3
FOUNC.".CN
NARIUI'IVE
Mw,-grwposed site development for"Peterlj'Engenis is lo'cated'.on.:tbe north
side of Nutmeg Road South -in South Windsor, Connecticut,. The site 1S
located in Zone I.P'. and the lot size is 2.02 acres. The lot -.is bounded
to the north by May Department Stores Co. Inc., west- by Staodaid-Printing
and east by land. of Savin Brothers, Inc., A. I.,.Savin and Hartford Jeiwish
Federation.
Two -types of soil are'underlying the site, Walpole Sandy Loam, 1% i n i g r eit'..
Fine. Sandy'Loam. The first being classified inland wetland type soil.
rwo 9100 sq, ft. buildings parkinglot, and truck loading docks are to bed constructed
cred
in. an area of approximately 11. 28 acres of the 2.02 acre lot. AnydiSEur..Oed areas vithin'
the development not to -be built or paved on is to be permenently seeded 'as, des-cribed,'
later in the narrative. Total impervious coverage of t,he-'s'ite will'be�.-a'pprominac:'elvI...,.,.:;�
3.8Z.
.7
rhe site is serviced by public sewer, Water. and clecrrici . cy. The uE il:iEies' "Serviting,
the site shall be "underground. The'storm drainage system has been designed co...c'onnect
to theexisting storm sewer at the -southwest corner of,the-loci. Refer to -tile I
drainage study for specific details and, runoff values for -the proposed site'de,vel-606cni.;
The site development for Peter DEngenis's buildings, < will begin upd'b' approval: c, -
he siteplanor shortly thereafter. Prior to any construction activities, construe-
ion exit -pads, are to beinstalledat the location designated Oatplanslw folloL:ing tile
tallation of the construction exit pads, sediment control practices,J and measures,,
h
e s ta
hall be installed at the, location desingated,. on th.e' alporoved sediment,;: control plan.
y :ales are to. be in' the' Area of construction' at the base of cut and fill slopes
rior-to any land disturbance. Haybales and all. erosion an'd-s-edimenE tontrol 'practices
r ro t
e to be installed ') applied and maintained throughout the project in .'accp1rdance v.;. r-h
he guidelines as described on page 3 of 3 of the Palmberg b,Russo P la,PS .
The first. major land' disturbance on the site of Peter D'Epgea1'r will be'the ,stripping 'of
topsoil'in the immediate area of construction.` -Prior to any "stripping of topsoil hay
bales Are to be installedlin'a'rea of construction as designated an the 0,lanis.All erosion
and sediment control practic"es are to be repaired, replaced and maintained throughout the
project by the developer in accordancelto the requirements outlined on P.Age .3 of 3 or un-
til all disturbed areas have become permanently stabilized. The topsoil I , is to be stock-
piled at the locat ion. designated on the plans. Haybales are to be installed along per-
imeter of the stockpile to form a sediment barrier.,. Temporary seeding T.topsoil stock---..-..'.:'
pile I s shall be completed within 15 days,of its formation -as outlined in the guidelines
for temporary vegetative cover on page 3 of'3 of thEi.plans by Palmberg Russo. 11f,the
formation of the topsoil stockpile does.not occur during the, -seeding date6 (i.e.,-winter
months - September 15 through April 1),'th6 topsoil stockpile shall b6�,�emporarily. I mulched
as outlines on the page 3 of 3 of the plans by Palmberg & Russo, until'a'!temporary veget-
ative cover can ,be established. Topsoil shall not,be placed while in a frozen or muddy
condition or when the subgrade is excessively wet.
The next step in the construction sequence is the grading required foi't1he' construction
of the parking area,'access drives and exposed areas,.- The soil erosion !and,sediment -con -'
trol measures and practices implemented pr ior to the stripping of topsoil should be -in-
spected for repair, replacement and maintenance prior to any land' disturiiance r activities
commence upon completion of final grading, all gradedor disturbed areas -not tobe built
or paved on shall be permanently stabilized., -"If.seeding cannot be accomplished during
the recommended seeding dates .(April 1 through June-1 and August:15 tbr6ugh'Septeimb-0-Ir 15)
the disturbed and graded areas are to be _temporarily mulched to stabilize ' 'the soil until
seeding can be accomplished during the next recommended seeding period. :.If.rough or final
grading is to be delayed for more than 30 days after land disturbanceactivitieshave
ceased, the disturbed areas are'to 'be temporarily vegetated or temporarily- mulched if
seeding cannot be accomplished -within the recommended ded seeding land ' disturb-.
ance activities occur between the months of September 15 to April 1, special attention
should be taken in assuring that the exposed and disturbed areas are sufficiently, mulched
immediately after final grading, until seeding can'be accomplished during thenext re-
commended seeding dates and all sediment barriers -shall be checked perio dically for -any,
need of repair, replacement and maintenance until the disturbed areas hi.ve been permanently
stabilized. Upon final grading, h4ybales are to be installed at.the,ba4ii,of.cvt,and fill
slopes as designated on the approved soil erosion -and sediment control plan.
The construction ofthe building should begin after the site has been ;rq;169 h.graded. Areas
to be filled shall be stripped of topsoil, vegetation, roots, . rocks., and -,,Other objectionable
material that wouldresult in the construction of unsatisfactory fills ."Fill should be
placed and compacted in layers not to exceed 8" in depth and shall.be-fr,eel.of,brush,
rubbish, stumps,:logs, timber, rocks, building debris and other objectiR.hable material that
would result in the construction - of unsatisfactory tills i Fill should hould be placed 'and.
compacted -as required to prevent erosion, slippage, settlement, excess saturation, and othet.'
related problems. Frozen material shall not be used for,fill not,'Shall1ifill. be placedand,,
compacted on frozen'ground. The fill required ior the construction of the; building shall.
be placed and compacted in accordance with local and state requirements :!and codes.:
The parking area and access drives are to be surfaced with ibitumitlus:pavement,:.At the com-
pletion of final grading. The construction of;the building.should be.completed prior to
the surfacing of the parking area and access drive with bituminus pavement.
The erosion and sediment control measures implemented throughout the project shall be
maintained after the development of the site until the disturbed areas have been
permanently stabilized and -vegetation has been established. Not until the disturbed
areas have become permenently stabilized in accordance to the final erosion and sediment
control plan shall any control measures be removed,
;E!F-V. /0-9-86
CONSERVATION PLAN
PLAN PREPARED FOR
PETER, -VENGENI'S
NUTMEG RQAD SOUTH
SOUTH WINDSOR, CTpQ�M
9
IaND �URV�YOR� & PROf�f f ION
.15 par POND Dw