Loading...
HomeMy WebLinkAboutApplication Files_93681_pg0013 Mr.,Jeff Folger—Town of South Windsor Dzen Tree Farm Subdivision- Remedial Action Plan Mich$�2008 Page 3 of 3 mixed into the affected soil, or the affected soil`clean'topsoil. will be placed below six inches of Phase N-Some or all of the soil within lots 55,56,57, 59,60, 61, 62,63,64,and the two open space lots_include contaminated soil to approximately eight inches deep. Additionally, some of soil within lots 63, 64, and the proposed open space lots includes contaminated soil to approximately 20 inches deep. These areas will be treatedusing phytoremediation. In May (year to be determined) a mixture of either ryegrass or tall fescues will be applied to-the affected areas by hydroseeding along with fertilizer and soil binding agent. Through hydroseeding,,it is anticipated that a dense,uniform lay"of , the y grass will, be quickly established allowing pesticide contaminants to be reduced by rhizodegradation processes (stimulated by the grass root zone). Although slower than soil mixing and anaerobic dehalogenation(it can take a.few growing seasons to seethe desired results), this type of phytoremediation process will not cause as much site disruption, provides an effective soil erosion and sedimentation control,and is more aesthetically pleasing: At the close of each growing season, (approximately November),several soil samples will be collected and analyzed for target pesticides and arsenic. The analytical results will be evaluated to measure the remediation progress of the-previous.:Pre growing:season. Based on this evaluation, if needed,the.remedial strategy for Phase IV may be revised to more quickly decrease target contaminant concentrations. The proposed remedial actions are depicted on the remedial action siteplan included as Figure 2. A remedial action implementation schedule will be provided once the proposed subdivision plans have been approved and the develop er is set to begin Phase.TI of the development. Remediation of Phases III and IV will begin one year before the proposed road is constructed. Please contact me at 860-436-4901 or Rob Mannarino at Mannarino Builders, Inc. if you have 'any questions. Sincerely, Zuvic Associates,Inc. Robert J. Carr,P.E.,�LEP��' Vice President C: Robert Mannarino-Mannarino Builders,Inc. Attachments—Figure 1 Figure 2 Remedial Action Plan 030308