Loading...
HomeMy WebLinkAboutApp 15-11P West River Farms TOWN OF SOUTH WINDSOR PLANNING &ZONING COMMISSION APPLICATION FORM Application Number: Official Receipt Date:: ate: o�- Munis Application #: _ /, Q®/%� tt3 U W ' SOUTH W►NDSOR PLANNING DEPT APPLICANT: W'e-�� �tt.�V� �0.1'1tV� (,,..G PROJECT NAME: Wca T J1L\vCr_ COMPLETE LOCATION OF PROPERTY: ??—?_3?j� N�'hc_ Q`1 r ek& U)(,,d f ar OWNER OF RECORD``O,,N LAND RECORDS: wes.� Pkvtr Farms t_L<z_ OWNER ADDRESS: -/O ,.R. Q.uSsn �- 4"DC►. r 1 0h4Ak Iza ttks7 C I a�o�Rd 8 GIS PIN# 2 5 z00 0-q ZONE M NAME, ADDRESS, TELEPHONE &EMAIL ADDRESS OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: 1- vrc� S ee,�� J• . iakj SSa 1- ACSO C7, , j �ca�t�c u� Rr!- � '!� (its, s o^ CT 8(on—�vZ3 —65 C (h ' (U`j 2 51 :77 Estimated presentation time:—N2 W. THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone Change to (Public Hearing and Certificate of Mailing Required) ❑ Open Space Subdivision/Resubdivision (Public Hearing and Certificate of Mailing Required) ❑ Subdivision ❑ Minor ❑ Major ❑ Resubdivision (Public Hearing Required) ❑ Minor ❑ Major ❑ Conditional Subdivision [� Special Exception to Table (Public Hearing and Certificate of Mailing Required) [$[ Site Plan of Development ❑ New Modification Building(s) Sq Ft ❑ General Plan of Development ❑ Dept of Motor Vehicle License - State Hearing per Section 14-55 for ❑ Earth Filling (Sec. 7.6) and/or Earth Removal (Sec. 7.16) (Public Hearing and Certificate of Mailing Required) ❑ Regulation Amendment ❑ Zoning ❑ Subdivision-Attach proposed amendment (Public Hearing Required) ❑ Temporary and Conditional Permit (Public Hearing Required) for ❑ Temporary and Conditional Permit Renewal for ❑ Detached In Law Apartment or❑Accessory Apartment (Public Hearing and Certificate of Mailing Required) ❑ Major Home Occupation (Certificate of Mailing Required) for ❑ Other (explain in detail) *An Application Pendi Sign is required to be posted on the property for all applications ten (10) days prior to being heard by the Comrssion. :Sign?aytu�re of pp cant Signature of Pro rty Owner Ze s ter' Print Name of Applicant Print Name f Property Owner Revised 2/2014 LETTER OF TRANSMITTAL RUSSO SURVEYORS•ENGINEERS DATE: JOB NO. I Shoham Rd-East Windsor,CT06088 ATTN: j Ch CT: (860) 623-0569 RE: MA: (413) 785-1158 TO '-Tvwrn O-F S«.�h wj eyj,<pe, rm IS 4b SU I i imun ho WE ARE SENDING YOU ❑ Attached ❑ Under separate cover Via the following items: ❑ Cover Letter ❑ Paper Prints ❑ Mylars ❑ Specifications ❑ Report ❑ Other COPIES DATE SHEET NO. DESCRIPTION 2 2 f to ► S t 5 I-5 I I - ! i - Z C,- 4 13 c4 rns (act L,> S �I ZW5 THESE ARE TRANSMITTED (as checked below): ❑ For approval ❑ For your use ❑ For review and comment ❑ As requested ❑ For signature ❑ For your records ❑ Returned after loan to us ❑ For bids due REMARKS: cc: SENT BY: Page 1 of 1 RUSSO SURVEYORS•ENGINEERS February 10, 2015E(:E6VE® Town of South Windsor Planning Department gp1W►NpS ��° 1540 Sullivan Avenue South Windsor, CT 06074 Re: West River Farms - Open Space Dedication Along the Scantic River (329, 339 &341 Scantic Road, East Windsor, CT) Dear Ms. Lipe, On behalf of our client,West River Farms LLC,we have enclosed with this cover letter the applicable land use applications for Open Space Dedication&site improvements associated with the West River Farms Subdivision on Scantic Road in East Windsor, including: 1. Minor Modification to Inland Wetlands,Watercourses and Conservation Approval 2. Special Exception for Open Space recreational park not operated for profit 3. Site Plan Modification for drainage and gravel access road improvements On October 3, 2012,the South Windsor Inland Wetlands Agency/Conservation Commission approved application #12-40W-West River Farms LLC - 329 &341 Scantic Road, East Windsor. The approval was to construct a gravel access road and stormwater control structures including a stormwater quality basin and outlet along the north bank of the Scantic River. These improvements were proposed in association with a 58-Lot residential subdivision development along Scantic Road in East Windsor known as West River Farms. The applicant has since modified its development plans incorporating an additional parcel of land (339 Scantic Road) and proposing a 69-Lot subdivision. As before,the subdivision is contained entirely within the boundaries of East Windsor, and the applicant proposes to dedicate the remaining land as open space. The proposed open space parcel contains approximately 19.5 acres with 17 acres in South Windsor along the Scantic River and 2.5 acres in East Windsor. The open space parcel includes a private roadway off of Scantic Road known as Schanck Road which will serve as the primary access for the open space. The applicant proposes to deed the open space parcel in fee to the East Windsor Boy Scout Building Committee. The Boy Scouts are enthusiastic about this opportunity and look forward to attending the PZC Special Exception hearing to explain their interest in owning and maintaining the property. They have indicated that in addition to Boy Scout use,the parcel will be open to the general public. The proposed changes to the residential development in East Windsor do not require any modification to the approved improvements in South Windsor, but in response to preliminary comments from your 1 Shoham Rd.East Windsor CT 06088.wwwirrusso.com.CT 86C f.623.0569.MA 413.785.1158 SERVING CONNECTICUT & MASSACHUSETTS Re: West River Farms - Open Space Dedication Along the Scantic River (329, 339 &341 Scantic Road, East Windsor, CT) M emergency services staff,we have revised the plans to 1) widen the gravel access road from 10 feet (8'at the wetland crossing) to a standard 18'width and 2) add a hammerhead turnaround area near the South Windsor town line. The wider access road results in 303 s.f of wetland disturbance at the wetland crossing. Alternatives to this disturbance include 1) leaving the access road as previously approved or 2) narrowing the access road at the crossing, but both of these alternatives would deviate from recommendations from your emergency services staff. The applicant is agreeable to whichever alternative the IWWA deems most prudent. We were recently informed that in addition to a wetland permit, PZC requires a special exception permit for the open space use and a site plan modification application for the proposed improvements. We have enclosed four sets of the applicable sheets from our development plans along with the applications and fees. Please let us know when we can present this proposal to IWWA and PZC. Thank you for your assistance in this matter. If you have any questions, or need additional information, please let us know. Sincerely, i�56 Dana Steele, P.E. J.R. Russo &Associates, LLC Enclosures cc: West River Farms LLC Atty. Len Jacobs Page 2 of 2 t RMrV�ff�irii/ - Drainage & Water Quality Design West River Farms FEB 1 o `015 69 Lot Single Family Residential Open Space Subidivision(PRD SOUTHWINDSORPLANN�► DEPT Scantic Road, East Windsor, CT November 17, 2014 NARRATIVE: West River Farms, LLC proposes to construct a 69-Lot residential open space subdivision on a 41± acre parcel of land which is bisected by the East Windsor/South Windsor town line. The parcel contains approximately 24 acres in East Windsor with access to Scantic Road in East Windsor, Connecticut. The rear of the parcel contains approximately 17 acres in South Windsor bounded to the east by the Scantic River. All 69 of the building lots are located in East Windsor, while all of the South Windsor portion and part of the East Windsor property will be deeded as open space to the DEEP, the respective towns or an approved land trust. The southwest corner of the parcel includes a private roadway known as Schanck Road which serves the abutters southwest of the subject parcel. The proposed development in East Windsor consists of approximately 3,800 feet of new public roadways to be maintained by the Town of East Windsor. The project includes a stormwater collection system for the new roadways and a portion of Scantic Road and Schanck Road. The applicant proposes to construct a wet pond within the open space property in South Windsor. The proposed storm drainage system will be piped to a new wet pond within the open space parcel in South Windsor for stormwater treatment prior to discharge to the Scantic River. An easement in favor of the Town of East Windsor will be provided over Schanck Road to the wet pond for rights to discharge and maintenance of the stormwater system. Drainage System Sizing The proposed storm drainage system was sized for a 10-year storm event. Contributing. watershed areas (A)to each catch basin were delineated as shown on the attached Drainage Area Map. Peak flow rates were computed using the Rational Method: Q =AxCxi Runoff Coefficients (C) were taken from Table 6-3 of the CT DOT Drainage Manual (DOT), see attached. The Hartford County Soil Survey identifies the on-site soils as mostly Windsor loamy fine sand and Penwood loamy sand which are classified as type A soils. According to -1- Table 6-3, C values for these soils range from .04 to .18 depending on slope of the topography. We conservatively assumed a constant C of 0.15 for all pervious areas and 0.9 for impervious areas. Rainfall intensity(i) for the 10-year storm event was taken from the DOT Table B-2.1 assuming a duration equal to the Time of Concentration (Tc). The Tc represents the time it takes for runoff to travel from the most remote point in the watershed to the discharge point. The Tc for each subcatchment was determined using methodology recommended by the DOT. Flow paths for the largest subcatchments are also shown on the Drainage Area Map. The TR- 55 method of combining sheet, shallow concentrated, and open channel flow times was considered for determining specific Tc, but the results were highly dependent on the assumed length of sheet flow. This methodology was developed based on research of large drainage areas of 200 acres or more. For small watersheds such as this one, sheet flow areas that comprise more than 80% of Tc may not actually contribute to the subcatchment's peak flow rate. Rather than attempt to exclude the sheet flow areas from the watershed,we conservatively assume minimum Tc for each subcatchment. DOT recommends a minimum Tc of 5 minutes for paved areas and 10 minutes for grassed areas. Travel Time (Tt)between structures was estimated using Manning's Formula assuming pipes flowing full or half full. This is also conservative as the velocities during the Tc development would not yet reach their peak rates. Dividing the length of flow by the velocity produced the Tt. The subcatchment Tc was compared to the upstream combination of Tc +Tt. The larger of the two values was used to computed the design Tc continuing downstream. A summary of this analysis is showing on the attached Pipe Sizing Chart. The results demonstrate that each pipe in the proposed network has a full flow capacity in excess of the 10-year design storm. Gutter Flow Analysis Each drainage inlet grate was sized in accordance with Table 11-2 of the DOT Drainage Manual for Local Roads with<3,000 ADT except that a 10-year design storm was used for non-sag conditions rather than a 5-year storm. Table 11-2 permits an allowable design spread of no more than %Z lane width(6.5' assuming no shoulder and up to 8' assuming a 10' lane with 3' shoulder) for non-sag conditions. For sag conditions, Table 11-2 permits a maximum spread of"all except one lane width" (combined left and right spread no more than 13 feet assuming no shoulder and up to 16' assuming a 10' lane with 3' shoulder). To achieve these requirements, some drainage structures were changed to double grates. Using Manning's Formula, the actual gutter flow width(T) can be computed given a known flow rate (Qlo),roughness coefficient(n=0.013 for smooth texture asphalt pavement), -2- longitudinal slope (S) and cross slope (SX 3.125%). The following formula was taken from the DOT Drainage Manual Figure 11-1.1, solving for T: T= [Q x n/(0.56 x SX1.67 x 50.5)(1/2.67) The flow rate (Q)to each grate inlet is a combination of the overland flow within the structure's watershed, and the bypass flow from the upstream structures. The overland flow is determined by Rational Method (A x C x i). A rainfall intensity(i) of 4.8 in/hr was used for watersheds with significant pervious areas, while watersheds of mostly impervious area (>50%) used an intensity of 6.0 in/hr. Once a structure in the chain was identified at the lower intensity, all subsequent downstream structures were also computed by the lower intensity. This methodology is conservative because it neglects travel time along the gutter(since the bypass flow represents only a portion of the total flow to the inlet). Bypass gutter flow is proportional to the cross sectional flow area beyond the grate width(W). The attached Gutter Flow Analysis Chart computes the flow(Q) and width(T) for each structure and demonstrates that the maximum spread requirements are met. CB#4 & CB#5 were excluded because their contributing watershed was assumed to be insignificant. CB#23- 25 were also excluded because they are in existing Scantic Road which has no curbing. Any gutter flow relief(such as when winter snow banks create a berm condition) will be an improvement over existing conditions. For structures in sag condition, equation 11.7 from the DOT Drainage Manual, was used to compute the gutter spread(T) during weir flow conditions (<0.4 ft depth), by dividing the depth (d) by the cross slope(SX): T= [QCFS/(CP)]2/3/SX where: Q =flow rate into grate opening(cfs) P =perimeter of grate excluding bar widths and the side against the curb, 5.02 ft. for single grates and 7.33 for double grates C =weir coefficient, 3.0 CFS =factor of safety for clogging, 1.0 with curb inlet SX=cross slope(ft/ft) This analysis required selection of Type II double grate structures at CB#22, 21, 11, 2 and 1. Due to the extent of bypass to CB#2, upstream structures CB#6 & CB#8 were converted to Type I double grates. This reduced the spread at CB#2 to 6.7 feet. Combining this with the spread at CB#1 of 6.3 feet, a full lane width of(26—6.7—6.3) 13 feet is maintained. -3- Wet Pond Sizing The stormwater basin is designed as an in-line wet pond to provide water quality treatment for the project before discharging to a new riprap scour hole along the edge of the Scantic River. The wet pond was designed in accordance with the 2004 Connecticut Stormwater Quality Manual. The required water quality volume (WQV)was computed as follows: WQV = (1")(R)(A)/12 where: WQV = water quality volume (ac-ft) R = volumetric runoff coefficient(0.05+0.009(I)) I = percent impervious cover(%) A = watershed area(acres) The drainage area of the wet pond is 28.3 acres with 7.77 acres of impervious surface (including new roof area). There are 53.5 new roofs within the wet pond watershed. The conceptual plan shows an average roof footprint of 2,000 s.f. Since at least 75% of these roofs will be infiltrated,the impervious area needing treatment can be reduced as followed: 53.5 x 75% x 2,000 s.f. /43,560 s.f./ac. = 1.84 acres Our net treatable impervious coverage within the wet pond watershed is therefore: 7.77— 1.84 =5.93 acres or 20.9% Therefore,the WQV was computed as follows: WQV = (1)(0.05+0.009(20.9))(28.3)/12 =0.562 acre-ft x 43,560 sf/ac=24,460 cf The pond forebay was sized to contain 10% of the WQV plus sediment storage. The annual sediment load was computed as follows: Sed. = 28.3 ac. x 1.0 tons/ac./yr. x 2000 lb/ton/85 lb/cf=665 cf/yr The proposed pond has the following capacity: Forebay: Elev. Area(sf) Inc. Vol. (cf) Total Vol. (cf) 26.5 861 0 0 (bottom) 28 1,785 1,943 1,943 29.5 2,877 3,464 5,407 (forebay volume) -4- Wet Pond(Including Forebay): Elev. Area(sf) Inc. Vol. (cf) Total Vol. (cfl 26.5 2,41.6 0 0 (bottom) 28 4,855 5,348 5,348 29.5 7,630 9,286 14,634 29.5 10,585 0 14,634 30 11,691 5,567 20,200 30.5 12,729 6,103 26,303 (permanent pool volume) The forebay therefore has the following sediment capacity: 5,407 c.f. —(24,460 c.f. x 10%) =2,961 c.f/665 c.f/yr=4.5 years Groundwater Recharge Individual StormTech SC-740 chambers are proposed to infiltrate runoff. The StormTech chambers are sized to accommodate the first 1"of runoff from the roofs. Each SC-740 unit provides 45.9 c.f. of storage. The smallest conceptual building footprint shown is 1,540 s.f. These houses would require: 1,540 x 1"/12/45.9=3 chambers The largest foreseeable footprint(based on max. building coverage)would be 2,500 s.f., which would require: 2,500 x F712/45.9=5 chambers Therefore, 3 to 5 infiltration chambers will be installed on at least 41 of the 54 units within the wet pond watershed, where suitable soils and water table depths are found. Preliminary investigations indicate this is a feasible quantity for the site. Outlet Protection Outlet velocities to the forebay will be minimized by use of a drop manhole structure. Intermediate riprap is proposed to armor the slope from the outlet to the bottom of the forebay. The discharge point for the wet pond will be armored with a preformed scour hole designed in accordance with the CT DOT Drainage Manual. A scour hole size of 15'xl8'xl.5' was selected from Table 8-8.1 for a 36"pipe. =5- Riprap was sized for a 10-year storm event assuming a conservative tailwater depth of 0.5'. Since the scour hole is in a floodplain, the actual tailwater depth will likely be greater. The results of the riprap sizing are as follows: Qlo=33.3 cfs Sp =Rp=3 d50 =(0.0125Rp2/TW)(Qlo/Rp2.5)1.33 _ (0.0125(3)2/0.5)(33.3/(3)2.5)'-" =0.62' <0.67 (int. riprap) Conclusion Due to the proximity of the project to the Scantic River, detention of stormwater is not advisable. Detaining runoff would delay the peak discharge to coincide with peaks from upstream flows,potentially resulting in impacts downstream. Infiltration of roof runoff will be utilized where soil conditions permit to encourage recharge and mitigate increases in runoff volume. The proposed wet pond will provide stormwater quality treatment including removal of at least 80% of total suspended solids (TSS). The proposed drainage system is designed in accordance will accepted engineer practices and in our opinion will not adversely impact downstream properties. 00 �pwuctauaaay •'Y" Of ON -6- No.21492 :'tu r �a PIPE SIZING CHART WEST RIVER FARMS SUBDIVISION, SCANTIC ROAD, EAST WINDSOR, CT STRUCTURE AREA IMP. AxC T. Tt i'o Q10 PIPE GEOMETRY FROM TO (ac.) (%) INC TOTAL (min.) (min.) (in/hr) (cfs) DIA. Length Slope Qfull Vfull YD7 CB32 0.36 27.0 0.127 0.127 10.0 0.1 4.8 0.6 12 30 1.00 3.9 4.9 CB32 CB31 0.19 47.4 0.096 0.223 10.1 0.2 4.8 1.1 15 48 0.50 5.0 4.0 CB31 C1330 0.49 48.2 0.251 0.474 10.3 0.1 4.8 2.3 15 21 1.00 7.0 5.7 CB30 CB28 0.05 66.8 0.033 0.506 10.4 1.1 4.8 2.4 15 275 . 0.50 5.0 4.0 CB29 CB28 0.89 24.5 0.297 0.297 13.5 0.1 4.3 1.3 15 21 1.00 7.0 5.7 CB28 5B26 0.13 71.9 0.090 0.893 13.5 0.8 4.3 3.8 15 187 0.50 5.0 4.0 C627 CB26 1.36 5.8 0.263 0.263 12.6 0.1 4.4 1.2 15 21 1.00 7.0 5.7 CB26 CB25 0.09 74.7 0.064 1.220 14.3 0.1 4.2 5.1 15 47 1.00 7.0 5.7 CB25 CB24 0.06 100.0 0.054 1.274 14.4 0.9 4.2 5.4 15 324 1.00 7.0 5.7 YD6 CB24 3.41 13.0 0.844 0.300 10.0 0.1 4.8 1.4 8 28 1.00 1.3 3.8 CB24 CB23 0.09 100.0 0.081 1.655 15.4 0.8 3.9 6.5 18 207 0.50 8.1 4.6 CB23 CB4 0.05 000.0 0.045 1.700 16.1 0.2 3.9 6.6 18 46 0.50 8.1 4.6 FE1 CB4 0.91 8.6 0.195 0.195 10.0 0.1 4.8 0.9 12 26 1.00 3.9 4.9 FE2 C135 0.22 2.8 0.038 0.038 10.0 0.1 4.8 0.2 12 33 1.00 3.9 4.9 CB5 CB4 0.03 56.9 0.017 0.055 10.1 0.1 4.8 0.3 15 21 1.00 7.0 5.7 CB4 CB3 0.03 56.9 0.017 1.967 16.3 0.9 3.9 7.7 18 242 0.50 8.1 4.6 YD1 CB3 4.55 11.2 1.065 1.065 10.3 0.1 4.8 5.1 15 35 1.00 7.0 5.7 CB3 CB2 0.13 68.6 0.086 3.118 77.2 0.2 3.8 11.8 24 79 0.50 17.4 5.5 CB9 CB8 0.34 51.7 0.183 0.183 5.0 0.1 6.0 1.1 15 21 1.00 7.0 5.7 CB8 CB6 0.45 37.5 0.194 0.377 5.1 0.6 6.0 2.3 15 290 2.00 9.9 8.1 CB7 CB6 0.32 49.9 0.168 0.168 5.0 0.1 6.0 1.0 15 21 1.00 7.0 5.7 CB6 CB2 0.47 47.6 0.238 0.783 5.7 0.9 5.9 4.6 15 292 1.00 7.0 5.7 CB2 C131 0.69 47.3 0.348 4.250 17.4 0.0 3.8 16.1 24 21 1.00 24.6 7.8 CB1 DMH10 0.56 49.9 0.294 4.543 17.5 0.4 3.8 17.3 24 166 0.90 23.3 7.4 DMH10 DMH9 1.59 20.2 0.479 5.023 17.8 0.6 3.8 19.1 30 235 0.50 31.5 6.4 DMH9 DMH8 0.86 26.3 0.299 5.321 18.4 0.6 3.8 20.2 30 235 0.50 31.5 6.4 DMH8 DMH7 1.98 24.9 0.667 5.988 19.1 0.6 3.7 22.2 30 241 0.50 31.5 6.4 DMH7 DMH6 0.000 5.988 19.7 0.6 3.6 21.6 30 225 0.50 31.5 6.4 DMH6 DMHS 0.000 5.988 20.3 0.7 3.6 21.6 30 253 0.50 31.5 6.4 DMH5 DMH4 0.84 18.2 0.241 6.229 20.9 0.2 3.5 21.8 30 219 3.15 79.0 16.1 CB19 CB18 0.21 58.8 0.124 0.124 5.0 0.1 6.0 0.7 15 21 1.00 7.0 5.7 CB18 CB17 0.36 50.8 0.191 0.315 5.1 0.6 6.0 1.9 15 211 1.00 7.0 5.7 CB22 CB21 0.64 45.9 0.316 0.316 10.0 0.1 4.8 1.5 15 21 1.00 7.0 5.7 CB21 DMH11 0.72 48.1 0.368 0.684 10.1 0.5 4.8 3.3 15 119 0.50 5.0 4.0 YD5 DMH11 0.74 24.0 0.244 0.244 .10.0 0.2 4.8 1.2 12 53 1.00 3.9 4.9 DMH11 CB17 0.000 0.928 10.6 0.6 4.7 4.4 15 150 0.50 5.0 4.0 J.R. Russo Associates, LLC Sheet 1 of 2 11/17/14 PIPE SIZING CHART WEST RIVER FARMS SUBDIVISION, SCANTIC ROAD, EAST WINDSOR, CT STRUCTURE AREA IMP. AxC T, Tt ilo Quo PIPE GEOMETRY FROM TO (ac.) (%) INC TOTAL (min.) (min.) (in/hr) (cfs) DIA. Length Slope Qfull Vfull CB20 CB17 0.11 54.3 0.061 0.061 5.0 0.1 6.0 0.4 15 31 0.50 j 5.0 4.0 CB17 CB15 0.11 55.8 0.063 1.367 11.2 0.2 4.7 6.4 15 154 5.00 j 15.7 12.8 CB16 CB15 0.22 65.7 0.141 0.141 5.0 0.1 6.0 0.8 15 21 1.00 7.0 5.7 CB15 CB14 0.42 37.8 0.182 1.691 11.4 0.1 4.6 7.8 15 36 2.00 9.9 8.1 CB14 CB13 0.04 69.5 0.027 1.718 11.4 0.3 4.6 7.9 15 234 5.00 15.7 12.8 CB13 CB12 0.33 48.8 0.170 1.888 11.8 0.0 4.5 8.5 18 21 2.00 16.1 9.1 CB12 CB10 0.31 52.0 0.167 2.055 11.8 0.2 4.5 9.2 18 130 5.00 25.5 14.4 YD4 CB11 1.11 22.5 0.354 0.354 10.0 0.1 4.8 1.7 12 21 1.00 3.9 4.9 CB11 CB10 0.61 57.4 0.354 0.708 10.1 0.4 4.8 1 3.4 15 86 0.50 5.0 4.0 CB10 DMH12 0.17 47.3 0.086 2.849 11.9 0.1 4.5 12.8 ! 18 41 2.00 16.1 9.1 DMH12 DMH4 0.000 2.849 12.0 0.3 4.5 12.8 18 303 7.92 32.1 18.2 DMH4 DMH3 0.000 9.078 21.2 0.2 j 3.5 31.8 30 251 4.86 98.2 20.0 DMH3 DMH2 O.000 9.078 21.4 0.3 3.5 31.8 30 186 1.02 45.0 9.2 DMH2 DMH1 0.000 9.078 21.7 0.4 3.5 31.8 30 991 0.96 43.6 8.9 DMH1 WP 0.000 9.078 22.1 0.1 3.5 31.8 30 50 0.60 34.5 7.0 WP D OUT 1.07 36.0 0.449 9.527 22.2 0.1 3.5 33.3 30 160 4.06 89.7 18.3 DMH1A OUT 0.000 9.527 22.3 0.1 3.5 33.3 36 30 0.50 51.2 7.2 28.31 J.R. Russo Associates, LLC Sheet 2 of 2 11/17/14 GUTTER FLOW ANALYSIS West River Farms Subdivision (PRD) Cross Sectional Bypass Area AC Total Rainfall Flow Rate Long- Roughness Flow Area Sag Grate (BA)= Bypass AC AC to Inlet (ACT)= Intensity (Qio)= itudinal Cross Slope Coefficient Gutter Flow (FA)= Grate Width Perimeter (T-W)Z (BAC)= Structure (ACI) ACI+BAC (i) ACT x i Slope(5) (Sx) (n) Width(T) (Tz x SJ/2 (W) (P) x S,/2 ACT x BA/FA CB16 0.141 0.141 6.0 0.8 5.00% 3.13% CB8 0.013 3.5 0.194 1.35 0.073 0.053 0.194 0.247 4.8 1.2 3.80% 3.13% 0.013 4.2 0.277 2.71 C66 0.238 0 269 4 8 0 0 0.035 0.031 1.3 1.53/0 3.13/0 0.013 5.2 0.415 2.71 0.093 0.061 CB3 0.086 0.086 6.0 0.5 1.00% 3.13% 0.013 4.0 0.244 1.35 CB2 0.348 0.446 4.8 2.1 0 0.106 0.037 3.13/ 6.7 7.33 C69 0.183 0.183 6.0 1.1 3.80% 3.13% 0.013 4.1 0.261 1.35 C67 0.168 0.250 4.8 1.2 3.80% 3.13% 0.013 4.2 0.279 1.35 0.117 0.082 C61 0.294 0.409 4.8 2.0 3.13% 6 3 0.129 0.115 7.33 C619 0.124 0.124 6.0 0.7 1 3.13% 4.3 5.02 CB18 0.191 0.191 6.0 1.1 3.13% 5.7 5.02 CB22 0.316 0.316 4.8 1.5 3.13% 5.3 7.33 CB21 0.368 0.368 4.8 1.8 3.13% 5.9 7.33 CB32 0.096 0.096 4.8 0.5 2.92% 3.13% 0.013 3.1 0.150 1.35 0.048 0.030 CB31 0.251 0.281 4.8 1.4 5.95% 3.13% 0.013 4.1 0.258 1.35 0.114 0.125 C629 0.297 0.422 4.8 2.0 59591. 3.13% 0.013 4.7 0.349 1.35 0.178 0.215 CB27 0.263 0.478 4.8 2.3 2.41% 3.13% 0.013 5.9 0.538 1.35 0.318 0.283 CB30 0.033 0.033 6.0 0.2 2.41% 3.13% 0.013 1 2.3 0.086 1.35 0.015 0.006 C628 0.090 0.096 6.0 0.6. 2.41% 3.13% 0.013 3.5 0.191 1.35 0.072 0.036 CB26 0.064 0.100 6.0 0.6 2.41% 3.13% 0.013 3.5 0.197 1.35 0.076 0.038 CB20 0.061 0.061 6.0 0.4 3.68% 3.13% 0.013 2.7 0.116 1.35 0.029 0.015 063 CB17 0.182 0.078 6.0 0.5 6.68% 3.13% 0.013 2.7 0.112 1.35 0.027 0.019 C615 0.182 0.201 4.8 1.0 5.00% 3.13% 0.013 3.7 0.214 1.35 0.086 0.081 CB 0.027 0.108 4.8 0.5 2.80% 3.13% 0.013 3.3 0.166 1.35 0.057 0.037 CB13 0.170 0.207 4.8 1.0 3.80% '3.13% 0.013 3.9 0.242 1.35 0.104 0.089 C612 0.167 0.256 6.0 1.5 3.80% 3.13% 0.013 4.6 0.336 1.35 0.168 0.128 C610 0.086 0.214 4.8 1.0 2.70% 3.13% 0.013 4.3 0.282 1.35 0.131 0.099 C611 0.354 0.542 4.8 2.6 3.80% 6.3 7.33 11-17-14 ' 12 I FADE 0"2 b 2 ARer reco � r+eknn w• 3265 �- - 0 50: 002084040002 Typo; LAN @o K 219o5W'; 282 - 2e9 Kahan Kerensky & Capossela, LLP Kl�e�` 9285 45 Hartford Tpke. Vernon, CT 06066 OUFT-CLAIM DEED ROCKVILLE BANK,a Connecticut corporation,having its principal place of business at 1645 Ellington Road,South Windsor,Connecticut for the considesntion of ONE HUNDRED FIFTY SEVEN THOUSAND and OQ1100 DOLLARS($157,000.00)paid,does hereby give..Z=4 bargain, sell and confirm unto WEST RIPER FARMS,LLC,a.Connecticut limited liability ccmpauy;with an address of 172 Aatston Road,Colchester;Connecticut with QUIT-CLAIM COVENANTS,the Ted PfOPOAY situated in the Towns of East Windsor and"South Windsor,County of Hartford and State of Connecticut,known as 341 Scantic Road, as more particularly bounded-and described on edule A attached hereto. Being the same pmaises dambed in the Foreclosure By Sate Comrnittee Deed dated July 13,2009 and recorded in Volume 2155 at Page 139 of the South Windsor Land Records and in Volume 348 at Page 57 9 of the East Windsor Lan d Records. Ai Signed as of the 10 day of June,2011. Witnessed by: ROCKVEUE BANK William DeMore Its Vice President STATE OF CONNECTICUT - COUNTY OF TOLLAND as: Vernon On the lam'day of June,2011,before me,the',underjM ofgcer,personally appeared, William DeMore,who acknowledged himselfto be the Vice PresidentofRockville Baal,and that as such Vice President,being authorized so to do,executed the foregoing insu=ent for the purposes therein contained. --, Brian J.DudKk Commissioner of the Superior Court aoibss ta9K�a►.t CONVEYANCE TAXAECEtVED SbI STATES t i o I LOCAL$-'-z5 .._p& YR 2 1 0 PARE 0 2 b 3 SCHEDULE A A certain piece or parcrl o:'land.with all the btuldings thereon.a;nd.appurtenancesthereto,located in tlic Towns of East Windsor,md South W a&or,Coaaty ofHartford and State of Cotraeetleut, being more particularly bounded and desenbed.as follows: Lacginning at an iron pain in the southeasterly line ofScantle Rou4,10 the Town of 134st Win.dsor,which pinalso marks the southwesterly comer of abutting land now or formerly of Schank;TIiENCS proceeding S•591.53'14".W along the private rigFit ofway commonly knower.as Schank Mond; 27,lt6'to a point;'!HENCE prooeedatg S•SS'491I20.5 along laird.n/f Schank. 4.04.66`to an iron pin;TMCE proceeding 557708'32"-E along lands rt/fChagnot rind Charest 'and»If Lovett, 83 43T to a poiirt..She last two eour6ea also Eoltow tins sautbcs'ty liac o>'Schank hood,and the last com.a crosses the South Wirtdsor/But WindsocTown Lune;TMCS proccex3:ing S�Bb"t}4'30''�E along land n/f Cbhgnat aad Cl .art,450.3x'to au.iratt p'a THENCE ii,ocmeding.5=06°49'18=W through a scxtian af5chankRatil,202.a1`io a.poini;Ti3F1VCE ;r,occeding 5=68°g0'ti2"-E along tend o/f Cltagrrot attd.Charest,:1,3.8?:04'.W A point on the ,A,cstrsly shore.of the Scande River;T,IMNCE proceediag itt a getural oordicriy diaction along said westuxly shore ofthc.Scandakiver approximately 5.01..17to a point,THETICE proceeding N-13°26'03"-W along lnnd ttlf D'Ancona.3G6,73'to a:poittt l!IEN-CE.proceading N-tr$°iTI.O"- w along land n/f D'.Ancona..1.1:03:g0'to a point-thc.last.courso crosses thO South Windsor/Sast. Windsor Town Line;7I3ENM N 5S046'S 1-W along land xOD'Aiteouk 23.93'to a PoW,, V-3ENCE.proct;eding 5-47'31'02-W al.oug land o/tFaith Tabernacle Chu rck Iaa,319,77'to a point;THENCE procoading N-42028',5$"-W alung_laad.Wf.Uth Tabernaclo Ctiumk Inc.,455.0' to a point;THENCE proceeding N-47*31'0.2"-S along land n/fFxith Tabernacle Clrurcit,Inc, 1.2.0'to a point;73.3E:NCE proceeding N-6I*:828-W atop&land dfMulkA,5.41.R0'to point; THENCE:pro=ding.S-40'37'1.4°»W along land.a/fSmvy,109423'to ita rron.pic,THENCE proceeding N-46°0436-W along land nXBravy,j6935I tp a-poir9 7TjENCE groceeding.N S 1a33'56"-W along laad MfBr6y,100.741to an iron pint in the southeasterly lina ofSCaudc Road; TI•I.ENCE proceeding S-59'53'10-W along the southeasterly line.ofStaddo Road,51..53'to an iron pin marlc'ng the northeasterly corner ofabutting lead ofDcborah L.Anasto;T,f MC.E proceeding 311..67'to a:point in.a southeasterly dlst Watt along lead ofDeborah 4 Amato; 113ENCE along_a radius of42"00'00"'for a distanca of150'so a south=ste y-direction along Und of Deborah L.Amato to a point;Tf1ENCE along a soythwestarlyradlus of 100 1i a.dirwd6n of 4290900"for a length of?3.30'to.a point along land of D-aborah L.Amato;11-MNCE proceeding 5-76"00'0W.P,for a distance.of 105.611to an iron pin being cite souduasterly comer of of Deborah L. Amato,Tj-MMa proceeding 5-5953'14-W.for a distarica of.102.8:1'along laird n/f DeborAh L Asrtato.to an uon_pin,TUNCE proceeding 5-59°53'l4=W along said land riff Scha& 80.00'to a.point in thc:ao tlierlyline ofScl:ankMad;THENCE:proceediag N 56°17 5',1 W along said:Lod_a/.f.Sobeak and along Oa nortbarly line of Scbm*Road;312.00'to the point and place ofbegirirtistg.. . t`^ t � � -- 1 I �. tlttop r anw a.n s t/ (I? r r j !lC ;O oz / J --•�I _ �� �''�- CIs 'aV—~,a"'°°' aue.a.ams �� i ( r i xRn• (/ J I— �,.-:' --, ` r•�~'b !! -`r.- ...__ \' � .. r.rrrs rxaaar �� .r«.•'<a. 7 .. + r J 'r i?i)j Jt%;.;+7%%i, Jl t •\ �`I ,r '� r,� � rr�� Jr IY ti li t. t A N? 1 ��, r / Q� r�,'xr, ?i• � �i 7 ras'�Q�'7 �; ri r t, 5' - l! t !r i t:J , r !r% , ara•.n `•\ - r t 1 ..�J r ... s r t r ; %1 ri/i l i J;:J i t NtOMa+N'%• yy vrvrt / mmo en.. s t' .J 4 ��� ' .0 11,r,rili�%J�, rtr 'r: ,' �..'r.r,r'i+ :jt� ;17i:'i�%f�1%/''';tJ:%i'i'or.'rr•.���.rt �t Of % f{ ri. i ,� (c /;. C•'`•• - '_ r' %, Ji< ,tt ! y+r,' ;t' i1 Jr;�i! :.li;iJ'i?i/Jr /i r+ !"> 'r'•L .f(; % / `� .'.�' .� d. —� iJii I �•,+,prrorG�1'appl spice DILRL %: ; Fr' �+ �� �., /' :r ,, +.ra 't;�:4: ;r t J ;:•:. um.�ROuot 9,.011 fR7t Iola J ( l l';� R across r�wrrRr f�' r� y'?v /o iRxom auar�rarmr ''r )' �''•.• •/j `• r I r' ! aw-+acres s, ( !r °° t! Il r! inia.'mtaisAua'ic va l / usr.am as.a wra a r \4.� ./ 'S6`,` �4'iJ I/y i J r; 1(r r• !NmlaU t r i J JJl:�e, m lMar ONoaaa .. ♦ ♦ ,+ % i t t .f S i•r..... . ... ! r loRno aa.aN Rrl awa-' i i + : o y 2t/ i �� 5 f i r 11, i f ;+ r ' t; I t r ;i Ji:; +F a ) i d O ' ''•; i`11 t+litrlt' ili t !t 'h-•./ d � t>% •'�.E'f;>'Xw,rht.'1'zI >V. }\ -q r f 'l � 11 �4 ,n. ;ix��S„?��`��T'.tJPJi :1-.-''Y'`r' '�* tia. '�..>�3.:,r„1=it,Y•:t;. r i ss3 r..,f. 6:_a. Ji J ;•.�t;ti�.ic --• �.�� I !I� .i� � � ar amr„�'4� � r-`«`��:i,".:x-.' �'w}ir' �'--J''' 1� •��'°J1f'%J''�+'�"t .f$- f �1. r 7.. uu• �..,..,� Riverside-Way so �. of �----- - - �- � � '', � � •,%,ji,,:fJr7.J i,i;` i .Ji !1 J t`J� �,a`r.:;ifiL"s�.Xt"� r�in .... .. r .• �31'y f/'`� i r r ,i +r !' u�'` aa;�` '� N,nvo'.. I tr r I ..i•. } (�, '1� rl; "^� �� *�Y +c f y J 7 % 1 J r t` r'' ! 1 '�ae�din�r xn i 87i i 88 85 i 18�. 82' .. ,,i. S„''.yrN►7s7e�irr lJi irJ'i JII,' / +1 1'1 l, i kcuEa' ..` c�.i?" ''``"�' A+i"'ram. t:r ♦=7-•j nn �:tr j _. 'f tr'I tr-1; •, y� ro P' ,zt a 't Jt) J f r•',f '1 :i ., :ow. am�+' H ut-wh . f xne m a4eh � iwt.p ognrrat K.�u ac —Yee.1Yna N//• aIq /Nw B�Mmlet i Mi-��N. Jf—k CHO.o+bus ,•N eeamua i I ISO St N/r I ` :t 1 I p SO twr r.chw c \ 4 PAYMENT SUMMARY RECEIPT TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVENUE SOUTH WINDSOR CT 06074 DATE: 02/10/15 CUSTOMER#: 000000000 TIME: 12:29 CLERK: laurenlz RECPT#: 20769168 PREV BAL: TP/YR: MS/2015 AMT PAID: 470.00 BILL: ADJSTMNT: EFF DT: 02/10/15 BAL DUE: PERMITS/INSP PAYMENT -----------------TOTALS----------------- PRINCIPAL PAID: 470.00 INTEREST PAID: .00 ADJUSTMENTS: .00 DISC TAKEN: .00 AMT TENDERED: 470.00 AMT APPLIED: 470.00 CHANGE: .00 PAID BY: PAYMENT METH: MULTIPLE PAYMENT REF: tOW N 3 4 col 70� /"}./�/�S_a� /v�-/�/,VI W 9 � _. • �� z�z� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 r�Osog-co TELEPHONE(860) 644-2511 CERTIFIED MAIL#70111570 0000 63371198 Joanne Slater, CCTC,Town Clerk Town of East Windsor 11 Rye Street Broad Brook, CT 06016 Dear Ms. Slater: Re: Notice to Adjoining Municipalities In accordance with Connecticut General Statutes concerning notification to municipalities regarding Planning & Zoning Commission applications that could affect the abutting town, we hereby notify you of the Application 15-11P, West River Farms request for a Special Exception and Site Plan of Development for the creation of a private open space recreational area (associated with West River Farms Subdivision in East Windsor. This property is located southerly of Scantic Road and easterly of Schanck Road,RR zone. This application is tentatively scheduled to be heard by the Planning & Zoning Commission on March 10, 2015 in the Council Chambers of the Town Hall. If you have any question, please feel free to contact the Planning Department at 860-644- 2511, ext. 253. Very truly yours, Michele R. Lipe, AICP Director of Planning MRL/llz PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: 2/11/14 TO: Matt Galligan, Fred Shaw, Michael Gantick, Walter Summers, Jeff Doolittle Ray Favreau, Mark Owens, Chris Dougan, Heather Oatis, Ron Asselin, John Caldwell, Andrea Confrancesco, Glen Buonanducci FROM: Michele Lipe, AICP, Director of Planning The Planning &Engineering Departments have received plans for the following projects: Appl 15-11P, West River Farms Private Open Space Location: East of Schank Road, south of Scantic Road,north of Scantic River ® Site Plan ❑ Subdivision No. Acres 17+ Zone RR ❑ Industrial ❑ Commercial ® Residential No. Lots/Units Water: ® Public ❑ Private Well Sewerage: ® Public ❑ Septic System Project Description: Private open space with access road from Schank Road Future Town-owned property involved? ❑ Yes ® No ❑ new street(s) ❑new detention area ❑ new open space/recreation area ❑ active ❑passive Planning Department notes: Open space associated with East Windsor subdivision Please comment by 2/24/15 and return to the Planning Department. Page 1 of 1 Lipe, Michele From: Buonanducci, Glenn Sent: Tuesday, January 06, 2015 11:51 AM To: Lipe, Michele Cc: Custer, Scott; Hoover, Stephen; Laporte, Kyle Subject: West River Farms Camp I spoke with the Chief and we will be responsible for emergency services to this location. As discussed it will need a South Windsor address for our CAD. Thank you. "These things we do,that others may live." Sergeant Glenn Buonanducci 156 South Windsor Police Department Support Services Division — Traffic Unit 151 Sand Hill Rd. South Windsor, CT 06074 This transmission is intended for the sole use of the individual or entity to whom it is addressed,and may contain information that is for official use only,law enforcement sensitive,privileged,confidential and/or exempt from disclosure under applicable law.You are hereby notified that any dissemination,distribution or duplication of this transmission by someone other than the intended addressee or its designated agent is strictly prohibited.If your receipt of this transmission is in error,please reply to the sender of this transmission. 3/2/2015 Page 1 of 1 Zarambo, Lauren L. From: Buonanducci, Glenn Sent: Wednesday, February 11, 2015 5:33 PM To: Zarambo, Lauren L. Cc: Custer, Scott Subject: Re: In House Referral Form I previously noted our concerns with Michele relative to addresses and emergency vehicle access. SGT. Glenn Buonanducci 156 Sent from my Whone On Feb 11, 2015, at 16:29, Zarambo, Lauren L. <Lauren.Zarambo(&,,southwindsor.or-a>wrote: Please find attached In House Referral Form for Appl. 15-11 P, West River Farms Private Open Space. Please forward any comments or question to the Planning Department. Thank you, Lauren L Zarambo Planning Department Secretary Town of South Windsor 1540 Sullivan Avenue South Windsor,CT o6074 860.644.2511 ext 253 <Inl4ouseRef 15-11P.pdf> 2/17/2015 LETTER OF TRANSMITTAL RUSSO SURVEYORS-ENGINEERS DATE: 2-19-15 JOB NO. 2011-011 1 Shoham Rd East Windsor,CT05088 ATTN: Michele Lipe CT: (860)623-0569 RE: West River Farms MA: (413) 785-1158 TO Town of South Windsor Plannign Department WE ARE SENDING YOU ® Attached ❑ Under separate cover Via Deliver the following items: ® Cover Letter ❑ Paper Prints ❑ Mylars ❑ Specifications ❑ Report p ®� Other COPIES DATE SHEET NO. DESCRIPTION 7 2/19/15 Certificate of Mailing Receipts 7 2/19/15 Copy of Notification Letters Jac -mac aaa111 �' Sol% \,, THESE ARE TRANSMITTED (as checked below): ❑ For approval ® For your use ❑ For review and comment ® As requested ❑ For signature ❑ For your records ❑ Returned after loan to us ❑ For bids due REMARKS: cc: SENT BY: Page 1 of 1 Name and Address of Sender Check type of mail or service: ASSOCIATES Adult Signature Required ❑ Ad0It Signature Restricted Delivery Affix Stamp Here �. R. RU$SO _ ❑❑ Certified Mail ❑ Recorded Delivery(International) (If issued as a 1 SHOHAM ROAD ❑ COD ❑ Registered certificate of mailing ❑ Delivery Confirmation ❑ Return Receipt for Merchandise or for additional EAST WINDSOR, CT 0608� rY P copies of this bill) ❑ Express Mail ❑ Signature Confirmation ❑ Insured Postmark and Date of Receipt Article Number Addressee(Name,Street,City,State,& ZipCodeTM) Postage Fee Handling Actual Value Insured Due Sender ASR ASRD DC SC SH RD RR Charge if Registered Value if COD Fee Fee Fee Fee Fee Fee Fee Carlos & Manela Cristovao — 12 Schanck Road — East Windsor, CT 06088 2' Louis P. Chagnot 21 South River Road Tolland, CT 06084 TT 3. Aslan Enterprises, LLC 29 Horseshoe Lane Somers, CT 06071 4. — William H. & Cira M. Conley— > a d — 235 Farnham Road — South Windsor, CT 06074 — U.S. POSTAGE\��'_-' = 0) .o 0 0 5• AwnEAST WINDSOR.CT —Maria F. Dacosta -- 06088 _ 0 'Q = uaIrsa FFR iq, 1513 0 h.—234 Farnham Road srares _ O E L. _ nosra— Lsr ERU�E AMOUNT _ -South Windsor, CT 060743.29 _ s. Dayna M. Smith nnnasgQ,_ns o C ay. 0 0 N 4' v '0 201 Scantic Meadow — 01: d c d L 0 i a. —South Windsor, CT 06074 L � v = N 7. 0 Victory Outreach Ministries, Inc. c _ _ c/o Kevin Saunders LM ? __ 3 Kingston Drive ) N N 8. East Hartford, CT 06118 +� Z � Q Q Total Number of Pieces Total Nu er 'eces Postmaster,Per(Name of receiving employee) 4 Listed by Sender Receiv (rice PS Form 3877, June 201 1 of 2) Complete by Typewriter,Ink, r Ball(I{'n, See Privacy Act Statement on Reverse Oe� 9g RUSSO SURVEYORS-ENGINEERS February 19, 2015 Carlos &Manela Cristovao 12 Schanck Road East Windsor, CT 06088 CERTIFICATE OF MAILING Dear Property Owner: Re: West River Farms Scantic Road&Schanck Road In accordance with Section 3.20 of the "Town of South Windsor Zoning Regulations", please be advised that an application has been filed on the property abutting yours and is subject to hearings by the Inland Wetlands Agency/Conservation Commission on March 4, 2015 and the Planning& Zoning Commission on March 10, 2015. The application and plans are on file with the South Windsor Planning Department. You are invited to the hearing to ask questions and/or provide comments. You may also submit written comments regarding the application prior to the hearing if so desire. For further information regarding this application please contact the Planning Department, 860-644-2511, ext. 253. Sincerely, Dana P. Steele, P.E. J.R. Russo & Associates, LLC 1 Shoham Rd.East Windsor,CT06088.www.irrusso.com.CT860.623.0569.MA 413.785.1158 SERVING CONNECTICUT & MASSACHUSETTS RUSSO SURVEYORS-ENGINEERS February 19, 2015 Louis P. Chagnot 21 South River Road Tolland, CT 06084 CERTIFICATE OF MAILING Dear Property Owner: Re: West River Farms Scantic Road &Schanck Road In accordance with Section 3.20 of the "Town of South Windsor Zoning Regulations", please be advised that an application has been filed on the property abutting yours and is subject to hearings by the Inland Wetlands Agency/Conservation Commission on March 4, 2015 and the Planning & Zoning Commission on March 10, 2015. The application and plans are on file with the South Windsor Planning Department. You are invited to the hearing to ask questions and/or provide comments. You may also submit written comments regarding the application prior to the hearing if so desire. For further information regarding this application please contact the Planning Department, 860-644-2511, ext. 253. Sincerely, Dana P. Steele, P.E. J.R. Russo & Associates, LLC 1 Shoham Rd.East Windsor,CT 06088.wwwjrrusso.com.CT 860.623.0569.MA 413.785.1158 SERVING CONNECTICUT & MASSACHUSETTS RUSSO SURVEYORS•ENGINEERS February 19, 2015 Aslan Enterprises, LLC 29 Horseshoe Lane Somers, CT 06071 CERTIFICATE OF MAILING Dear Property Owner: Re: West River Farms Scantic Road&Schanck Road In accordance with Section 3.20 of the "Town of South Windsor Zoning Regulations", please be advised that an application has been filed on the property abutting yours and is subject to hearings by the Inland Wetlands Agency/Conservation Commission on March 4, 2015 and the Planning& Zoning Commission on March 10, 2015. The application and plans are on file with the South Windsor Planning Department. You are invited to the hearing to ask questions and/or provide comments. You may also submit written comments regarding the application prior to the hearing if so desire. For further information regarding this application please contact the Planning Department, 860-644-2511, ext. 253. Sincerely, dztq- Dana P. Steele, P.E. J.R. Russo & Associates, LLC 1 Shoham Rd.East Windsor,CT 06088.wwwjrrusso.com.CT 860.623.0569.MA 413785.1158 SERVING CONNECTICUT & MASSACHUSETTS RUSSO SURVEYORS•ENGINEERS February 19, 2015 William H. &Cira M. Conley 235 Farnham Road South Windsor, CT 06074 CERTIFICATE OF MAILING Dear Property Owner: Re: West River Farms Scantic Road &Schanck Road In accordance with Section 3.20 of the "Town of South Windsor Zoning Regulations", please be advised that an application has been filed on the property abutting yours and is subject to hearings by the Inland Wetlands Agency/Conservation Commission on March 4, 2015 and the Planning& Zoning Commission on March 10, 2015. The application and plans are on file with the South Windsor Planning Department. You are invited to the hearing to ask questions and/or provide comments. You may also submit written comments regarding the application prior to the hearing if so desire. For further information regarding this application please contact the Planning Department, 860-644-2511, ext. 253. Sincerely, Dana P. Steele, P.E. J.R. Russo &Associates,LLC 1 Shoham Rd_East Windsor,CT 06088.wwwjrrusso.com.CT 860.623.0569.MA 413.785.1158 SERVING CONNECTICUT & MASSACHUSETTS RUSSO SURVEYORS-ENGINEERS February 19, 2015 Maria F. Dacosta 234 Farnham Road South Windsor, CT 06074 CERTIFICATE OF MAILING Dear Property Owner: Re: West River Farms Scantic Road&Schanck Road In accordance with Section 3.20 of the "Town of South Windsor Zoning Regulations", please be advised that an application has been filed on the property abutting yours and is subject to hearings by the Inland Wetlands Agency/Conservation Commission on March 4, 2015 and the Planning& Zoning Commission on March 10, 2015. The application and plans are on file with the South Windsor Planning Department. You are invited to the hearing to ask questions and/or provide comments. You may also submit written comments regarding the application prior to the hearing if so desire. For further information regarding this application please contact the Planning Department, 860-644-2511, ext. 253. Sincerely, Dana P. Steele, P.E. J.R. Russo & Associates,LLC 1 Shoham Rd.East Windsor,CT 05088.www.irrusso.com.CT 860.623.0569.MA 413.785.1158 SERVING CONNECTICUT & MASSACHUSETTS 7 RUSSO SURVEYORS•ENGINEERS February 19, 2015 Dayna M. Smith 201 Scantic Meadow South Windsor, CT 06074 CERTIFICATE OF MAILING Dear Property Owner: Re: West River Farms Scantic Road&Schanck Road In accordance with Section 3.20 of the "Town of South Windsor Zoning Regulations", please be advised that an application has been filed on the property abutting yours and is subject to hearings by the Inland Wetlands Agency/Conservation Commission on March 4, 2015 and the Planning & Zoning Commission on March 10, 2015. The application and plans are on file with the South Windsor Planning Department. You are invited to the hearing to ask questions and/or provide comments. You may also submit written comments regarding the application prior to the hearing if so desire. For further information regarding this application please contact the Planning Department, 860-644-2511, ext. 253. Sincerely, 66"- Dana P. Steele, P.E. J.R. Russo & Associates, LLC 1 Shoham Rd.East Windsor,CT 06088.www.irrusso.com.CT 860.623.0569.MA 413.785.1158 SERVING CONNECTICUT & MASSACHUSETTS r RUSSO SURVEYORS-ENGINEERS February 19, 2015 Victory Outreach Ministries, Inc. c/o Kevin Saunders 3 Kingston Drive East Hartford CT 06118 CERTIFICATE OF MAILING Dear Property Owner: Re: West River Farms Scantic Road&Schanck Road In accordance with Section 3.20 of the "Town of South Windsor Zoning Regulations",please be advised that an application has been filed on the property abutting yours and is subject to hearings by the Inland Wetlands Agency/Conservation Commission on March 4, 2015 and the Planning& Zoning Commission on March 10, 2015. The application and plans are on file with the South Windsor Planning Department. You are invited to the hearing to ask questions and/or provide comments. You may also submit written comments regarding the application prior to the hearing if so desire. For further information regarding this application please contact the Planning Department, 860-644-2511, ext. 253. Sincerely, -,z56"- Dana P. Steele, P.E. J.R. Russo & Associates, LLC I Shoham Rd•East Windsor.CT 06088.www.irrusso.com.CT 860.623.0569.MA 413.785.1158 SERVING CONNECTICUT & MASSACHUSETTS SpW N S'N 0 " r' F a 7-0v� 074C s-ate V&U&ot 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 SOR-CO � TELEPHONE(860) 644-2511 February 24, 2015 Dana Steele J. R. Russo &Associates, LLC 1 Shoham Road East Windsor, CT 06088 Dear Mr. Steele: Re: Appl. 15-11P, West River Farms - request for a special exception to Section 3.1.1.A and site plan of development for the creation of a private open space recreational area (associated with West River Farms Subdivision in East Windsor), on property located southerly of Scantic Road and easterly of Schanck Road, RR zone Please be advised that the Public Hearing of the Planning & Zoning Commission in the above referenced matter has been scheduled for Tuesday, March 10, 2015 at 7:30 PM in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue. Someone must be present at the hearing to represent the application. One sign advertising the meeting must be posted on the property for ten (10) consecutive days prior to the meeting and must be clearly visible from a town street. The sign must be posted on Schanck Road by Friday, February 27, 2015. Signs can be obtained in the Planning Department, Monday through Friday, 8:00 a.m. - 4:30 p.m. If you have any questions regarding this letter, please call 860-644- 2511, Ext 253. Sincerely, Lauren Zarambo Administrative Secretary JACOBS, WALKER, RICE &BARRY, LLC ATTORNEYS AT LAW 146 MAIN STREET MANCHESTER, CONNECTICUT 05042 RONALD JACOBS TELEPHONE (860) 646-0121 MAILING ADDRESS LEONARD JACOBS FAX (860) 645-6228 P.O. BOX 480 MICHAEL J. RICE MANCHESTER, CONNECTICUT DAVID M. BARRY, JR. 06045-0480 ALEXANDRA B. RICEVIENS February 27, 2015 Town of South Windsor Attention: Michele Lipe 1540 Sullivan Avenue South Windsor CT 06074 Re: West River Farms, LLC Dear Michele: I am sending this letter to you and to Jeff Folger, because I think it is of general interest to the Town of South Windsor and of particular interest to the Inland Wetlands Commission. I am the attorney for West River Farms, LLC, which presently has an application pending before the Inland Wetlands Commission of the Town of South Windsor. At the Inland Wetland Commission meeting, questions came up regarding the ownership of the property that my client owns in South Windsor within the area regulated by the Inland Wetland Commission of the Town of South Windsor. I am only writing this letter to discuss one aspect of the proposal. Apparently, at the previous Inland Wetland Commission meeting, questions came up regarding the ownership of the open space. First of all, 1 do not believe that the question of the ownership of the open space is a matter that would come under the jurisdiction of the Inland Wetland Commission. The Inland Wetland Commission regulates activities rather than ownership. However, that said, we do feel very comfortable in advising you that the open space will come under the ownership of the East Windsor Scout Hall Building Committee, Inc. This organization is a non-profit charitable organization that has been in existence in the Town of East Windsor for over twenty years. Although this organization is youth oriented and was created initially to provide a facility for the Boy Scouts, this organization operates and maintains other properties which are used for activities in the Town of East Windsor. Therefore, this organization is a logical organization to own the open space, both because of the purpose for its existence and because of its good track record. Just for your information, at this point, the group not only operates and maintains a 6,000 square foot facility which was opened in the year 2000, and the organization has acquired other properties, including a 22 acre parcel on Scantic Road in East Windsor. The Town of East Windsor has expressed its desire to have this organization own the open space, and we believe it is a good and proper organization to do so. I am writing this letter with the hope that it will be helpful to the Inland Wetland Commission in South Windsor. Very t y y ccur , a b LJ:sm cc. Jeffrey Folger, Senior Environmental Planner J. R. Russo South Windsor Volunteer Fire Department 1175 Ellington Road South Windsor, CT 06074 860-644-8547 Kevin E. Cooney— Fire Chief www.southwindsorfire.org March 3, 2015 Leonard Jacobs, Attorney Jacobs, Walker, Rice & Barry, LLC Attorneys at Law 146 Main Street Manchester, CT 06040 Re: Scantic Road Project Attorney Jacobs, I am in receipt of your letter dated February 27th regarding the access driveway width. There appears to be a question of 8 feet vs. 18 feet and the question as to whom requested the 18' width. I have reviewed the project with Walter Summer, South Windsor Fire Marshal. He is the one that originally proposed the 18 foot width based on his concerns for the Fire Department. After review of the plans, I also contacted the Warehouse Point Fire Chief, James Barton regarding the project. As you indicated, the housing portion of the project is all in East Windsor, protected by the Warehouse Point Fire District while the access driveway and park along the Scantic River is all in South Windsor. The two Fire Departments will be meeting at a later date to discuss response coverage. To get back to the access driveway width, we all (SW Fire Chief, SW Fire Marshal and WHPT Fire Chief) agree that the width should be 16 feet. Should there be a need for fire apparatus or other emergency vehicle access, 16 feet would give us the needed space, less than the original quote of 18 feet and even less than the business fire lane requirement of 20 feet. Should you have any questions, please feel free to contact me. Kevin E. Cooney, Fire Chief kcooney@southwindsorfire.org Over 75 Years of Dedicated Community Service - 1938- MEMORANDUM To: Michele Lipe, Director of Planning From: Jeffrey Doolittle, Town Engineer ,f� Date: 3/9/15 RE: Application 15-11 P—West River Farms, Scantic Road, East Windsor, CT Engineering has reviewed the site plan for the above application and has the following comments: 1. Show where the proposed gravel access drive will begin (at the end of Schanck Road) and label this drive and its proposed width on all plans where it appears. 2. Show any gate and signs that will be installed along the proposed gravel access drive. 3. 1 understand the proposed gravel access drive will be privately owned. Who will maintain this gravel access drive? It is likely there will be ruts, potholes, bumps, etc that form on the slopes and other places on this gravel drive due to storm water runoff, frost, etc. Significant erosion of the gravel from this road could affect the roadside areas. This drive will need regular maintenance so there is not significant erosion and it remains passable for passenger vehicles. 4. According to the Drainage report, the wet pond was sized to treat the net impervious surface expected in this development. This may need to be adjusted if the number of infiltration systems for individual units is less than expected and the WQV increases. I think this can be done by raising the weir in the wet pond outlet structure to about elevation 31.0. This is easy to adjust before or during construction. Please contact me if you have any questions. 1 Original sent Via USPS Certified Mail 7012 2210 000017915383 Copy Hand Delivered Wednesday, March 04, 2015 Virtorp Outreacb Alintotrtfvq, Int. Mailing Address:c/o P.O.Box 1496,South Windsor,Connecticut 06074 Wednesday, March 04,2015 Town of South Windsor c/o Planning&Zoning Commission Inland Wetlands Agency—Conservation Commission 1540 Sullivan Avenue South Windsor,CT 06074 Phone:860.644.2511 ext.253 RE: Applications made by West River Farms LLC reaardina Scantic Road&Schank Road Dear Commission Members, It has been brought to my/our attention that an application for development on land located off the Scantic and Schank Roads has been made by a development company called West River Farms,LLC. and its agents.This application has been submitted fraudulently since the ownership of this land has been and still is being disputed.Victory Outreach Ministries Inc, Board of Directors have been victims of Bank Fraud.There is a case currently pending in the Federal Courts of Appeals For the Second Circuit bearing case Number 14-3808CV and a Brief has recently been filed with the Court Clerk. Until this case has been decided or any future litigation is decided and until this matter of land ownership is fully resolved,The Town of South Windsor and its Agencies and/or Commissions should table ALL activity regarding this land. Please be advised that until the Board of Directors of the VOM have had a proper due course of law,we will continue to pursue every and all options to find remedy,whatever timeline it takes. Until then NO PERMITS should be allowed to continue, period. It is requested/demanded that this letter be entered and read into the record as evidence for any applications regarding this land. 1, Kevin R.Saunders Sr. have both a personal legal interest in this land and am a member of the Board of Directors of the Victory Outreach Ministries, Inc.. Please forward any and all correspondence to the above address. Sincerely Yours, RECEIVED L�- LL � Kevin Ralph Saunders, MARK 0 4 s 15 Personal and Authorized Agent for VOM $QUTtIWINDSOR plANNINGDEPT. cc: Mayor The"sA II jnir i Planning&Zoning Inland Wetland Commission J.R Russo&Associates RECEIVED Page 1 of 1 MAR 0 4 2015 sa,(h MOW WAND WETLANDS AGENCY CONSERVATION COMMMSION Memorandum To: Planning &Zoning Commission From: Elizabeth Warren, Chair IWA/CC Date: March 9, 2015 Re: West River Farms Appl. #15-11P At the March 4, 2015 meeting of the Inland Wetlands/Conservation Commission (IWA/CC), the Commission approved Appl. #15-11P, West River Farms, for a modification of said application. All of the concerns of the IWA/CC were addressed with information provided by South Windsor Town Staff, Jeff Folger, Fire Marshal Walter Summers, South Windsor Fire Chief Kevin Cooney and the East Windsor Conservation Commission; along with input from members of the East Windsor Scout Hall Building Committee and 'Attorney Leonard Jacobs, representing the applicant. The Commission was pleased with the information provided and the assurance that cooperation between East Windsor and South Windsor commissions will continue. The applicant and the East Windsor Scout Hall Building Committee welcome ongoing participation from South Windsor commissions and any interested volunteers. Scout leaders from South Windsor (members of the Commission) expressed interest in working on any projects that may be brought forward for the open space. The Conservation Commission is in favor of a positive outcome by the Planning and Zoning Commission on Appl. #15-11P - request for special exception to section 3.1.1.A and site plan of development for the creation of a private open space recreational area. cc: Michele Lipe Jeff Folger Walter Summers Ray Favreau IWA/CC JR Russo for West River Farms Attorney Leonard Jacobs 1 rage i or i Zarambo, Lauren L. From: Robert Dickinson[ridickinson@snetnet] Sent: Friday, March 06, 2015 8:23 PM To: Lipe, Michele Cc: Zarambo, Lauren L. Subject: Fw: Input for March 10 2015 P&Z commission Public Hearing and Regular meeting Please ignore the previous E-mail as it got sent incomplete & unedited. Full intended E-mail follows: ke o make the following comment for the Planning &Zoning March 10, 2015 Pu iq H*: _-Reference Public Hearing on AppL.15-11P,West River Farms: _ I would encourage that a provision be provided for public access into the private open space recreation area to provide public access to the Scantic River. I like t make the following comment at the Planning &Zoning March 10, 2015 Fgular Meeting nder Public Participation. . .. Re item: Appl.14-58P,SuWvan-.Avenue Industrial Park Request from Scannell properties to modify Subdivision approval condition#2 to reflect the construction of a 10 foot multi-use path I would state that I support the modification of the Subdivision approval to reflect the construction of a 10 foot multi-use path. Sincerely Robert Dickinson 19 Birch Road, South Windsor, CT 3/9/2015 �0%4 SF4 A %Wn olle siou� ?d&U&Ot • w; 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 OR-CO TELEPHONE (860) 644-2511 Certified #7011 1570 0000 6332 8345 March 10, 2015 West River Farms, LLC c/o J.R. Russo&Associates, LLC ATTN: Dana P. Steele, PE 1 Shoham Road East Windsor, CT 06088 RE: Appl. #15-11 P—West River Farms Dear Mr. Steele: At the March 4, 2015 regular meeting, the Inland Wetlands Agency/Conservation Commission approved App. #15-11 P Modification to application#12-40W—West River Farms—329 Scantic Road—Inland Wetland/Conservation Commission application for regulated activities in connection with the relocation of a stormwater system for a 69 lot residential development, on property located southerly of Scantic Road. Rural Residential Zone, with the following conditions: 1. The final approved copy of the entire set of plans and this letter reproduced thereon must be submitted to the Planning Department. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning &Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on March 4, 2020. It is the land own ers)/appIicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 4. Bonds shall be collected in the amount of $25,000.00 to ensure proper placement and maintenance of erosion and sediment controls; $50,000.00 for construction of stormwater system; $20,000.00 for removal of invasive plants. 5. All approvals required must be obtained and submitted prior to any activity on the site. 6. A contact person shall be identified on the plans. 7. The property located in South Windsor must be designated as open space with an appropriate steward'identified. 8. A plan for the removal of invasive plants must be submitted by the consulting biologist. The plan must add'iess the removal/control of Phragmites, Autumn Olive and Multiflora Rose; including mowing the woody vegetation and treating the stumps for the Autumn Olive in the upland area. The plan must be approved by town staff. 9. Upon stabilization of the stormwater pond, the pond must be stocked with appropriate species of native minnows for the purpose of mosquito control. 10. Responsibility for basin and stormwater structure maintenance will be established that is acceptable to the Town of South Windsor. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION Elizabeth Warren, Chairperson EW/dt cc: Director of Planning Chief Building Official pW N SC4 co �R 7_0- 0s� � • co 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 OR-co�'� TELEPHONE(860) 644-2511 CERTIFIED MAIL 70111570 0000 63371280 March 12, 2015 Dana Steele J. R. Russo &Associates, LLC 1 Shoham Road East Windsor, CT 06088 Dear Mr. Steele: Re: Appl. 15-11P, West River Farms—request for a special exception to Section 3.1.LA and site plan of development for the creation of a private open space recreational area(associated with West River Farms Subdivision in East Windsor), on property located southerly of Scantic Road and easterly of Schanck Road, RR zone We are pleased to advise you-that the Planning & Zoning Commission voted on March 10, 2015 to approve with modifications the above referenced application for a special exception to Section 3.1.LA and a site plan of development. This approval is for West River Farms for the creation of a private open space recreational area(associated with West River Farms Subdivision in East Windsor)to be operated by a non-profit, on property located southerly of Scantic Road and easterly of Schanck Road, RR zone, as shown on plans prepared by J. R. Russo and Associates, LLC, dated 11/17/15 as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including bonds in the amount of $25,000 to ensure proper placement and maintenance of erosion and sediment controls; $50,000 for construction of stormwater system; $20,000 for removal of invasive plants. 3. All bonds must be in one of the forms described in the enclosed Bond Policy. 4. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 5. The building street number must be included on the final plan. 6. All free standing signs and/or building signs require the issuance of a sign permit before they are erected. 7. Engineering comments dated 3/9/15 must be incorporated into the final plans. A black and white transparent mylar of Sheet # 4 with the above modifications, together with three blueprint copies of the entire set of plans as revised must be submitted to this Commission within 30 days to be stamped and signed. The letter of approval of this Commission must be reproduced on the mylar. After the mylar has been signed by the Commission, it will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. The attached Special Exception form must be completed and filed in the Town Clerk's office. The special exception will take effect upon filing. Sincerely, Bart Pacekonis, Chairman Planning and Zoning Commission BP/llz cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal Health Department The Special Exception will take effect upon filing of this form. I, Bart Pacekonis, Chairman of the South Windsor Planning & Zoning Commission, hereby certify that on March 10, 2015 the Planning and Zoning Commission granted to West River Farms, LLC a Special Exception to Section 3.1.1.A of the Zoning Regulations for the creation of a private open space recreational area (associated with West River Farms Subdivision in East Windsor) to be operated by a non-profit, on property located southerly of Scantic Road and easterly of Schanck Road, RR zone, as shown on plans prepared by J. R. Russo &Associates,LLC,Project No. 2011-011 as revised. This approval is subject to the following conditions: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including bonds in the amount of $25,000.00 to ensure proper placement and maintenance of erosion and sediment controls; $50,000.00 for construction of stormwater system; $20,000.00 for removal of invasive plants. 3. All bonds must be in one of the forms described in the enclosed Bond Policy. 4. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 5. The building street number must be included on the final plan. 6. All free standing signs and/or building signs require the issuance of a sign permit before they are erected. 7. Engineering comments dated 3/9/15 must be incorporated into the final plans. GIS Pin 252OR009 Property Description: A certain pit;ce or parcel of land, with all the buildings thereon and appurtenances thereto, located in the Towns of Fast Windsor and South Windsor, County of Hartford and State of Connecticut, being more particularly bounded and described as follows: B c g;rviing at an iron pits in the southeasterly line of Staudt Road, in the Town of East Windsor,which pin also marks the southwesterly comer of abutting land now or formerly of Schank; 7TIENCE proceeding 5-59°53'14"-W along the private right of way commonly known as 5chank Road, 27.86' to a point; THENCE proceeding S-55°49'I2"-E along laud nIf Schank, 4 t1.66' to an iron pin; THENCE proceeding S-57"08'32"-B along lands n/f Chagnot and Charest ,and ii/f Lovett, 834,73' to a point- the last two courses a.1so follow the southerly lint of Schank koad, and the last course crosses the South Windsor/East Windsor Town Line;THENCE f'roct ceding S-86°04`30"-E along Land nIf Chagnot and Charest,4$0.32.' to an iron pin; 'THENCE lei ocucding S-06"49'18"-W through a section of Schank Road, 202.01' to a point; TRIENCE p,oceeding S-68°40'02"-E along land n/f Chagnot and Chariest, 1,387.04' to a point an the vvesteriy shore of the Scantic River, -MEEN+:l;proceeding in a general northerly direrxion along said wesru•ly shore of the Scantic River approximately 50I.17 io a point; THLNCE proceeding N- 13"26'03"-W along land tVf D'Ancona, 266.73' to a point; THENCE proceeding N-68'171 D"- W along land n/f D'A.ncorta, 1,IO5.40' to a,point- the last course crosses the South Windsor/East Windsor Town Line; THENCE N-55°46'5I"-W along land n1fD'Anooru% 73.93' to a point; THENCE prcxeed ng S47°31'02"-W along land a/fFalth Tabernacle Church Inc,, 318,77' to a point; THENCE proceeding N-42*28'58`-W along land n/f Faith Tahernatclo Church, Inc,, 455.0' to a point; T]:1ENCE proceeding N-4731'02"-E along land n1fFaith Tabemacle Church, Inc., 1,20' to a point; THENCE proceeding N-61'38'28"-W along land alfMulka, 541.00'to point; THENCE proceeding S40°37114°-W along land n/fBravy, 169.251to an ironpin; 'ONCE procecding N-46°04'36"-W along land n/fBravy, 169.35'to a point; THENCE proceeding N- 8 I°33'56"-W along land n/fBravy, 100,74' to an iron pin in the southeasterly line of S=dc Road; THENCE proceeding S-59°53'14"-W along the southeasterly Una of Scantic Road, 51,53' to an iron pin marldng the northeasterly corner of abuning land of Debarah L, Amato;THENCE proceeding 31.67` to a point in a southeasterly direction along land ofDeborah L. Amato; THENCI, along a radius of42"OD'OQ" for a distance of150'in a southeasterly direction along land of Deborah L. Amato to a point;THENCE fdong a soythwesterly radius of IWin a direction of 42'00'00" for a length of 73.30' to a point along land ofbeborah L. Amato; THENCE pro=ding S-76"00'00"-E for a distance of 105.6l'to arc iron pin being the southeasterly cornet of land'of Deborah L. Amato; THHENCE proceeding S-59°53'14"W for a distance of l 02.81' along land n/f Deborah L. Amato to an iron pin; TI-MNCE proceeding S-59`'S3'14"-W along sand 14nd n!f Schank, 80.00' to a point in the northerly Zinc: of Schaak Road; TI•IEICE proceeding N- 5 6°1751 "-W along said land n/f Sahatlk and along the northerly line of Schank Road, 312.00' to :he point and place of beginning. OWNER OF RECORD: West River Farms, LLC Dated at South Windsor, Connecticut this 12t'day of March, 2015. In accordance with CGS Section 8-3d ti Chairman Bart Pacekonis Planning&Zoning Commission Received for record this day of , 200 at South Windsor, Connecticut ATTEST: SUMMONS - CIVIL STATE OF CONNECTICUT JD-CV-1 Rev.9-14 SUPERIOR COURT See other side for instructions C.G.S.§§51-346,51-347,51-349,51-350,52-45a, www.jud.ct.gov 52-259, P.B.Secs.3-1 through 3-21,8-1 "X"if amount,legal interest or property in demand, not including interest and TO:Any proper officer;BY AUTHORITY OF THE costs is less than$2,500. STATE OF CONNECTICUT,you are hereby n "X"if amount, legal interest or property in demand, not including interest and commanded to make due and legal service of costs is$2,500 or more. this Summons and attached Complaint. "X"if claiming other relief in addition to or in lieu of money or damages. Address of court clerk where writ and other papers shall be filed (Number,street,town and zip code) Telephone number of clerk(with Return Date (Must be a Tuesday) (C.G.S.§§51-346,51-350) area code) 95 Washington Street, Hartford,CT 06106 ( 860 )548-2700 MAY 12 , 2 015 Month -Day— Judicial District G.A. At (Town in which writ is returnable)(C.G.S.§§51-346,51-349) Case type code (See list on page 2) ❑ Housing Session Number: 1HARTFORD Major: P90 Minor: C90 For the Plaintiff(s) please enter the appearance of: Name and address of attorney,law firm or plaintiff if self-represented (Number,street,town and zip code) Juris number(to be entered byattomeyonly) Kevin R Saunders Sr Self Represented Telephone number (with area code) Signaturepf Plai iff (If eff-re esented (860 ) 798-7871 (/�. The attorney or law firm appearing for the plaintiff,or the plaintiff if Email address for delivery of papers under Section 10-13(if agreed to) self-represented,agrees to accept papers(service)electronically in Yes ❑X No NIA this case under Section 10-13 of the Connecticut Practice Book. Number of Plaintiffs: 1 Number of Defendants: 12 Xx Form JD-CV-2 attached for additional parties Parties Name (Last,First,Middle Initial)and Address of Each party(Number;Street;P.O.Box;Town;State;Zip;Country,if not USA) First Name: Kevin R Saunders Sr. P-01 Plaintiff Address:P.O.Box 1496,South Windsor,CT 06074 Additional Name: P-02 Plaintiff Address: First Name: Town of East Windsor D-01 Defendant Address:11 Rye Street,Broad Brook,CT 06106 Additional Name: East Windsor Planning 8r Zoning D-02 Defendant Address:I I Rye Street,Broad Brook,CT 06106 Additional Name: East Windsor Inland Wetlands D-03 Defendant Address:11 Rye Street,Broad Brook,CT 06106 Additional Name: Laurie P Whitten,Town Planner D-04 Defendant Address.11 Rye Street,Broad Brook,CT 06106 Notice to Each Defendant 1.YOU ARE BEING SUED.This paper is a Summons in a lawsuit.The complaint attached to these papers states the claims that each plaintiff is making against you in this lawsuit. 2.To be notified of further proceedings,you or your attorney must file a form called an"Appearance"with the clerk of the above-named Court at the above Court address on or before the second day after the above Return Date.The Return Date is not a hearing date.You do not have to come to court on the Return Date unless you receive a separate notice telling you to come to court. 3.If you or your attorney do not file a written"Appearance"form on time,a judgment may be entered against you by default.The"Appearance"form may be obtained at the Court address above or at www.jud.ct.gov under"Court Forms." 4.If you believe that you have insurance that may cover the claim that is being made against you in this lawsuit,you should immediately contact your insurance representative.Other action you may have to take is described in the Connecticut Practice Book which may be found in a superior court law library or on-line at www.jud.ct.gov under"Court Rules." 5. If you have questions about the Summons and Complaint,you should talk to an attorney quickly. The Clerk of Court is not allowed to give advice on legal questions. Signed r(S and"X"proper boxt J El Commissioner of the Name of Person si�gninLeft Date sigped uperior Court ` Assistant Clerk j A If this; u ons is signed by a Clerk: For Court Only a.The igning has been done so that the Plaintiff(s)will not be denied access to the courts. File Date b. It is the responsibility of the Plaintiff(s)to see that service is made in the manner provided by law. c.The Clerk is not permitted to give any legal advice in connection with any lawsuit. d.The Clerk signing this Summons at the request of the Plaintiff(s)is not responsible in any way for any errors or omissions in the Summons,any allegations contained in the Complaint,or the service of the Summons or Complaint. T OP I certify I have read and Signed elf-Represented laintifo Date understand the above: 03/23/2015 - Name and address of person recognized lo prosecute in the amount of$250 ( o nneciicu. �Ft! Ir different Pei;,,)n Signed (Official taking recognizance,X"proper box) Commissioner of the Date Docket Number Superior Court t f ❑Assistant Clerk (�t°'t�l"fjj_C)-a{.11 �fCt -p (Page 1 of 2) Instructions 1. Type or print legibly,sign summons. 2. Prepare or photocopy a summons for each defendant. 3. Attach the original summons to the original complaint, and attach a copy of the summons to each copy of the complaint. Also, if there are more than 2 plaintiffs or more than 4 defendants prepare form JD-CV-2 and attach it to the original and all copies of the complaint. 4. After service has been made by a proper officer, file original papers and officer's return with the clerk of court. 5. The party recognized to pay costs must appear personally before the authority taking the recognizance. 6. Do not use this form for the following actions: (a) Family matters(for example divorce, child (d) Probate appeals. support, custody,paternity, and visitation (e)Administrative appeals. matters). (o Proceedings pertaining to arbitration. (b) Summary process actions. (g)Any actions or proceedings in which an attachment, c Applications O App ations for change of name. garnishment or replevy is sought. ADA NOTICE The Judicial Branch of the State of Connecticut complies with the Americans with Disabilities Act(ADA). If you need a reasonable accommodation in accordance with the ADA, contact a court clerk or an ADA contact person listed at www.jud.ct.gov/ADA. Case Type Codes Codes Codes Major Description Major/ Minor Description Major Description Major/ Minor Description Minor Minor Contracts C 00 Construction-All other Torts(Other than T 02 Defective Premises-Private-Snow or Ice CIO Construction-State and Local Vehicular) T 03 Defective Premises-Private-Other C 20 Insurance Policy T 11 Defective Premises-Public-Snow or Ice C 30 Specific Performance T 12 Defective Premises-Public-Other C 40 Collections T 20 Products Liability-Other than Vehicular C 90 All other T 28 Malpractice-Medical Eminent Domain E 00 State Highway Condemnation T 29 Malpractice-Legal E 10 Redevelopment Condemnation T 30 Malpractice-All other E 20 Other State or Municipal Agencies T 40 Assault and Battery E 30 Public Utilities&Gas Transmission Companies T 50 Defamation E 90 All other T 61 Animals-Dog T 69 Animals-Other Miscellaneous M 00 Injunction T 70 False Arrest M 10 Receivership T 71 Fire Damage M 20 Mandamus T 90 All other M 30 Habeas Corpus(extradition,release from Penal Vehicular Torts Vol Motor Vehicles`-Driver and/or Passenger(s)vs. Institution) Driver(s) M 40 Arbitration V 04 Motor Vehicles"`-Pedestrian vs.Driver M 50 Declaratory Judgment V 05 Motor Vehicles`-Property Damage only M 63 Bar Discipline V 06 Motor Vehicle`-Products Liability Including Warranty M 66 Department of Labor Unemployment Compensation V 09 Motor Vehicle'-All other Enforcement V 10 Boats M 68 Bar Discipline-Inactive Status V 20 Airplanes M 70 Municipal Ordinance and Regulation Enforcement V 30 Railroads M 80 Foreign Civil Judgments-C.G.S.52-604&C.G.S.50a-30 V 40 Snowmobiles M 82 Housing Civil Matters V 90 All other M 83 Small Claims Transfer to Regular Docket `Motor Vehicles include cars,trucks,motorcycles, M 84 Foreign Protective Order and motor scooters. M 90 All other Property P 00 Foreclosure P 10 Partition Wills,Estates W 10 Construction of Wills and Trusts P 20 Quiet Title/Discharge of Mortgage or Lien and Trusts W 90 All other P 30 Asset Forfeiture P 90 All other JD-CV-1 Rev.9-14(Back/Page 2) (Page 2 of 2) CIVIL SUMMONS STATE OF CONNECTICUT CONTINUATION OF PARTIES SUPERIOR COURT JD-CV-2 Rev.9-12 First named Plaintiff (Last,First,Middle Initial) Kevin R Saunders Sr. First named Defendant (Last,First,Middle Initial) Town of East Windsor Additional Plaintiffs Name (Last,First,Middle Initial,if individual) Address (Number,Street, Town and Zip Code) CODE 03 04 05 06 07 08 09 10 11 12 13 Additional Defendants Name (Last First,Middle Initial,if individual) Address (Number,Street, Town and Zip Code) CODE Town of South Windsor 1540 Sullivan Avenue,South Windsor CT 06074 05 South Windsor Planning&Zoning 1540 Sullivan Avenue,South Windsor,CT 06074 06 South Windsor Inland Wetlands 1540 Sullivan Avenue,South Windsor,CT 06074 07 Michele R Lipe, Director of Planning 1540 Sullivan Avenue,South Windsor,CT 06074 08 West River Farms LLC c/o Jacobs Walker,Rice&Barry 146 Main Street,Manchester,CT 06042 09 Rockville Bank et al c/o Gerald Garlick Esq,of Krasow,Garlick,&Hadley, LLC 1 Financial Plaza, Hartford,CT 06103 10 J.R Russo&Associates 1 Shoham Road, East Windsor,CT 06088 11 Dana Steele 1 Shoham Road, East Windsor,CT 06088 FOR COURT USE ONLY-File Date 12 13 14 Docket number CIVIL SUMMONS-Continuation DOCKET NO. SUPERIOR COURT Kevin R. Saunders Sr. J.D OF HARTFORD Plaintiff AT HARTFORD V. TOWN OF EAST WINDSOR, Return Date: MAY 12, 2015 EAST WINDSOR PLANNING AND ZONING EAST WINDSOR INLAND WETLANDS LAURIE P. WHITTEN, TOWN PLANNER TOWN OF SOUTH WINDSOR; SOUTH WINDSOR PLANNING DEPARTMENT SOUTH WINDSOR INLAND WETLANDS MICHELE R. LIPE, DIRECTOR OF PLANNING WEST RIVER FARMS LLC, ROCKVILLE BANK ET AL, J.R. RUSSO &ASSOCIATES DANA STEELE JANE DOE 1-20, JOHN DOE 1-20 Defendants COMPLAINT Injunction to Restrain Zoning Ordinance Violation The plaintiff Kevin R Saunders SR. party of legal interest and Senior Pastor and a member Board of Director of the Victory Outreach Ministries Inc. et al is seeking Page 1 of 4 injunction pursuant Sec. 52-480. Injunction against malicious erection of structure & Sec. 52-474. Interested persons may appear and be heard. Citing Sec. 52-480. Injunction against malicious erection of structure An injunction may be granted against the malicious erection, by or with the consent of an owner, lessee or person entitled to the possession of land, of any structure upon it, intended to annoy and injure any owner or lessee of adjacent land in respect to his use or disposition of the same. The plaintiff Kevin R Saunders SR. and Victory Outreach Ministries Inc. et al is at all time the rightful owner and is entitled to the possession of the land and the intended development is at all-time a nuisance to private property. Sec. 52-474. Interested persons may appear and be heard. Any person who may be directly or indirectly interested in, or affected by, the granting of any temporary or permanent injunction, may appear and be heard with regard to granting or dissolving the same. The plaintiff Kevin R Saunders SR. and Victory Outreach Ministries Inc. et al is at all- time are directly interested in, and affected by, defendant's collusion with the planning and zoning department of The Towns of East Windsor and South Windsor. 1. The plaintiff Kevin R Saunders SR. and Victory Outreach Ministries Inc. et al is and for a long time has been the owner in fee simple of a certain tract of land with a dwelling house thereon located on 329, 331, 333, 341 Scantic Road, East Windsor and Crow Park Road, South Windsor which premises he has occupied a private dwelling for himself and his family and church. 2. The defendants Town of East Windsor, East Windsor Planning and Zoning, East Windsor Inland Wetlands, East Windsor Planner Laurie P Whitten, Town of South Windsor, South Windsor Planning Department, South Windsor Inland Wetlands, Director of Planning Michele R Lipe, West River Farms, LLC, Rockville Bank et al, J.R. Russo & Associates, Dana Steele, Jane Doe 1-20, John Doe 1- Page 2 of 4 20, is attempting to make unlawful (illegal) development on property situated on 329, 331, 333, 341 Scantic Road, East Windsor and Crow Park Road, South Windsor. The defendant failed to properly convey title ultimately making the foreclosure and the zoning enforcement null and void. The defendant never had authority to contract a mortgage on the subject matter property with the plaintiff and or the board of directors of the church. The Towns of East Windsor and South Windsor does not have jurisdiction to grant the zoning commissions to conduct business on the subject matter property while the subject matter issues are being appealed accompanied with request for injunction and injunctive relief. 3. The Towns of East Windsor and South Windsor Planning and Zoning Department unlawfully adopted various building and zone regulations which, among other things are violation of plaintiff constitutional rights article III standing law involving injured and aggrieved party's issues to be remedied with redress and recourse... 4. After the adoption of the regulations the defendants have attempted to cause further harm without providing remedy and recourse to be addressed by all aggrieved parties. The defendants attempt to file for a plan of development of subject matter property. At all-time herein plaintiff objects to the defendants development plan. At all-time plaintiff objects to the improper conveyance of title. Herein Plaintiff at no time consents to the defendants request for development. 5. The defendants' et al intends to unlawfully develop upon plaintiff's private owned premise. The plaintiff notified him that its construction was in violation of the plaintiff right and the building and zone regulations are in violation, and unless it desisted, the plaintiff would seek proper legal redress. 6. The plaintiff, herein, requests for injunctions and Restraining Orders 52- zoning commissions of the Towns, whose duty it is to enforce the regulations, to take steps to prevent the unlawful construction and use of the building, and has Page 3 of 4 awaited action by it, but the commission has neglected and refused to take any action or proceedings whatsoever in the matter. 7. By reason of the use of the plaintiffs property is being developed without plaintiff consent by the Town of East Windsor and South Windsor, committee and zoning departments. The defendants' et al attempt at all times does disturb the peace, and comfort of the plaintiff. These conditions constitute a nuisance to the plaintiff; the value of his premises as a dwelling place is greatly impaired, and if they continue will be destroyed; and the plaintiff will suffer an irreparable injury for which he has no adequate remedy at law. The plaintiff claims: 1. An injunction restraining the defendants' et al and each of them from using or permitting to be used for business purposes the land and buildings owned by the plaintiff owner as above set forth. Plaintiff is still the rightful owner and taxpayer on said land and parcel. Defendant contract is null and void because plaintiff did not have all necessary Board of Directors permission and or necessary signature to contract and or convey title for said mortgage. 2. Damages. Redemption in equity, declarative relief, punitive damages, entitled to recover expenses, court fees and finding of interest and deficiency against defendant. Plaintiff request that the Court reverse the prior decision in question and provide equitable relief as fits. r--- ()--v , Litigant: Kevin R. Saunders Sr. P.O. BOX1496 South Windsor, Connecticut 06074 A E=C . Gonnecticu. :,,,,aishai Indifferent Penaon Page 4 of 4 DOCKET NO. SUPERIOR COURT Kevin R. Saunders Sr. J.D OF HARTFORD Plaintiff AT HARTFORD V. TOWN OF EAST WINDSOR, Return Date: MAY 12, 2015 EAST WINDSOR PLANNING AND ZONING EAST WINDSOR INLAND WETLANDS LAURIE P. WHIT-FEN, TOWN PLANNER TOWN OF SOUTH WINDSOR, SOUTH WINDSOR PLANNING DEPARTMENT SOUTH WINDSOR INLANDS WETLAND MICHELE R. LIPE, DIRECTOR OF PLANNING WEST RIVER FARMS LLC, ROCKVILLE BANK ET AL, J.R. RUSSO &ASSOCIATES DANA STEELE JANE DOE 1-20, JOHN DOE 1-20 Defendants MOTION FOR PRELIMINARY INJUNCTION STAYING ENFORCEMENT OF DEVELOPMENT UNTIL FURTHER ORDER OF THIS COURT Petitioner Kevin R Saunders SR party of legal interest and Senior Pastor/Board of Director of the Victory Outreach Ministries Inc. moves the Court for a preliminary injunction staying enforcement of developmental plan pending further order of this Court. Civ.R. 65(B). The reasons supporting this motion are set forth herein. Page 1 of 2 I. Relief Requested and Applicable Standard This Court should immediately issue a preliminary injunction staying the enforcement of developmental plan until after this Court rules upon Petitioner's challenge to the developmental plan application To grant a preliminary injunction, the court examines four factors: 1. whether there is a substantial likelihood that plaintiff will prevail on the merits; 2. whether the plaintiff will suffer irreparable injury if the injunction is not granted; 3. whether no third parties will be unjustifiably harmed if the injunction is granted; and 4. whether the public interest will be served by the injunction. Vanguard Transp. Sys., Inc. v. Edwards Transfer& Storage Co II. Petitioner is likely to succeed on the merits of his challenge petition. 111. An injunction is necessary to provide Petitioner a meaningful opportunity to challenge his reclassification under the developmental plan and the bill as it is voted on. IV. This Court should grant Petitioner' emergency motion because Petitioner will suffer irreparable harm if developmental plan is enforced before this Court rules upon Petitioner's challenge to his reclassification under remedy, redress, recourse and resolution. V. No third parties will be unjustifiably harmed if the injunction is granted, and the public interest will be served. Litigant: Kevin R. Saunders � V,X—J, P.O. BOX1496 South Windsor, Connecticut 06074 Page g Gonnectic,u. indifferent Pei s011 DOCKET NO. SUPERIOR COURT Kevin R. Saunders Sr. J.D OF HARTFORD Plaintiff AT HARTFORD V. TOWN OF EAST WINDSOR, Return Date: MAY 12, 2015 EAST WINDSOR PLANNING AND ZONING EAST WINDSOR INLAND WETLANDS LAURIE P. WHITTEN, TOWN PLANNER TOWN OF SOUTH WINDSOR, SOUTH WINDSOR PLANNING DEPARTMENT SOUTH WINDSOR INLANDS WETLAND MICHELE R. LIPE, DIRECTOR OF PLANNING WEST RIVER FARMS LLC, ROCKVILLE BANK ET AL, J.R. RUSSO &ASSOCIATES DANA STEELE JANE DOE 1-20, JOHN DOE 1-20 Defendants MEMORANDUM IN SUPPORT OF MOTION FOR INJUNCTION Injunction to Restrain Zoning Ordinance Violation The plaintiff Kevin R Saunders SR. party of legal interest and Senior Pastor and a member Board of Director of the Victory Outreach Ministries Inc. and is seeking Page 1 of 4 injunction pursuant Sec. 52-480. Injunction against malicious erection of structure & Sec. 52-474. Interested persons may appear and be heard. Citing Sec. 52-480. Injunction against malicious erection of structure An injunction may be granted against the malicious erection, by or with the consent of an owner, lessee or person entitled to the possession of land, of any structure upon it, intended to annoy and injure any owner or lessee of adjacent land in respect to his use or disposition of the same. The plaintiff Kevin R Saunders SR. and Victory Outreach Ministries Inc. et al is at all time the rightful owner and is entitled to the possession of the land and the intended development is at all-time a nuisance to private property. Sec. 52-474. Interested persons may appear and be heard. Any person who may be directly or indirectly interested in, or affected by, the granting of any temporary or permanent injunction, may appear and be heard with regard to granting or dissolving the same. The plaintiff Kevin R Saunders SR. and Victory Outreach Ministries Inc. et al is at all- time are directly interested in, and affected by, defendants collusion with the planning and zoning department of The Town of East Windsor and The Town of South Windsor. 1. The plaintiff Kevin R Saunders SR. and Victory Outreach Ministries Inc. et al is and for a long time has been the owner in fee simple of a certain tract of land with a dwelling house thereon located on 329, 331, 333, 341 Scantic Road, East Windsor and Crow Park Road, South Windsor which premises he has occupied a private dwelling for himself and his family and church. 2. The defendants Town of East Windsor, East Windsor Planning and Zoning, East Windsor Inland Wetlands, East Windsor Planner Laurie P Whitten, Town of South Windsor, South Windsor Planning Department, South Windsor Inland Page 2 of 4 Wetlands, Director of Planning Michele R Lipe, West River Farms, LLC, Rockville Bank et al, J.R. Russo & Associates, Dana Steele, Jane Doe 1-20, John Doe 1- 20, is attempting to Make unlawful (illegal) development on property situated on 329, 331, 333, 341 Scantic Road, East Windsor and Crow Park Road, South Windsor. The defendant failed to properly convey title ultimately making the foreclosure and the zoning enforcement null and void. The defendant never had authority to contract a mortgage on the subject matter property with the plaintiff and or the board of directors of the church. The Town of East Windsor and South Windsor does not have jurisdiction to grant the zoning commission to conduct business on the subject matter property while the subject matter issues are being appealed accompanied with request for injunction and injunctive relief. 3. The Towns of East Windsor and South Windsor Planning and Zoning Department unlawfully adopted various building and zone regulations which, among other things are violation of plaintiff constitutional rights article III standing law involving injured and aggrieved party's issues to be remedied with redress and recourse... . 4. After the adoption of the regulations the defendants have attempted to cause further harm without providing remedy and recourse to be addressed by all aggrieved party's. The defendants attempt to file for a plan of development of subject matter property. At all-time herein plaintiff objects to the defendants development plan. At all-time plaintiff objects to the improper conveyance of title. Herein Plaintiff at no time consents to the defendants request for development. 5. The defendants' et al intends to unlawfully develop upon plaintiff private owned premise. The plaintiff notified defendants that its construction was in violation of the plaintiff right and the building and zone regulations are in violation, and unless it desisted, the plaintiff would seek proper legal redress. Page 3 of 4 i 6. The plaintiff, herein, requests for injunctions and Restraining Orders-42 zoning commission of the town, whose duty it is to enforce the regulations, to take steps to prevent the unlawful construction and use of the building, and has awaited action by it, but the commission has neglected and refused to take any action or proceedings whatsoever in the matter. 7. By reason of the use of the plaintiffs property is being developed without plaintiff consent by the Town of East Windsor and South Windsor, Committee and Zoning department heads. The defendants' et al attempt at all times does disturb the peace, and comfort of the plaintiff. These conditions constitute a nuisance to the plaintiff; the value of his premises as a dwelling place is greatly impaired, and if they continue will be destroyed; and the plaintiff will suffer an irreparable injury for which he has no adequate remedy at law. The plaintiff claims: 1. An injunction restraining the defendants' et al and each of them from using or permitting to be used for business purposes the land and buildings owned by the plaintiff owner as above set forth. Plaintiff is still the rightful owner and taxpayer on said land and parcel. Defendant contract is null and void because plaintiff did not have all necessary Board of Directors permission and or necessary signature to contract and or convey title for said mortgage. 2. Damages. Redemption in equity, declarative relief, punitive damages, entitled to recover expenses, court fees and finding of interest and deficiency against defendant. Plaintiff request that the Court reverse the prior decision in question and provide equitable relief as fits. Litigant- Kevin R. Saunders Sr. t�t._ k J , P.O. BOX1496 South Windsor, Connecti ut 6074 r+ TT Page 4 of 4 " + -77 ConneCN a ;,:,,z,hal Indifferent Person CERTIFICATE OF SERVICE I hereby certify that a copy of the foregoing document has been sent via USPS first class mail to the following named Defendant(s) or Counsel to Defendant(s) and Original Documents sent via USPS Certified Mail, Return Receipt Court Clerk. 1. TOWN OF EAST WINDSOR, EAST WINDSOR PLANNING AND ZONING, EAST WINDSOR INLAND WETLANDS, TOWN PLANNER,LAURIE P.WHITTEN. 11 Rye Street Broad Brook, CT 06106 2. TOWN OF SOUTH WINDSOR, SOUTH WINDSOR PLANNING DEPARTMENT, SOUTH WINDSOR INLANDS WETLAND, DIRECTOR OF PLANNING, MICHELE R. LIPE. 1540 Sullivan Avenue South Windsor, CT 06074 3. WEST RIVER FARMS LLC C/O Jacobs, Walker, Rice& Barry 146 Main Street Manchester, CT 06042 4. ROCKVILLE BANK ET AL C/O Gerald Garlic, Esq. of Krasow, Garlick& Hadley, LLC One Financial Plaza Hartford, CT 06103 5. J.R. RUSSO&ASSOCIATES, DANA STEELE 1 Shoham Road East Windsor, CT 06088 J , O Respectfully, submitted 23`d day of March, 2015 By Lit ant: K in Ralph SVnders .Re r addr s fcthe laP. . 1 6So sor, Co cticRepublic JAsT: Page 5 of 5 �,E;� -- Connecticut :>hal Indifferent Pei wil STORMWATER POLLUTION CONTROL PLAN Prepared in accordance with: Connecticut Department of Energy & Environmental Protection, Bureau of Materials Management & Compliance Assurance, Water Permitting & Enforcement Division General Permit for the Discharge of Stormwater and Dewatering Wastewaters Associated with Construction Activities at: West River Farms 69-Lot Planned Residential Development Subdivision 329-341 Scantic Road East Windsor, Connecticut Prepared for: West River Farms, LLC 833 Glenn Drive Woodmere, NY 11598 January 21, 2016 Prepared by: Russo J.R. Russo & Associates Land Surveyors&Professional Engineers 1 Shoham Road, East Windsor, Connecticut 06088 P: (860) 623-0569, F: (860) 623-2485 STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut TABLE OF CONTENTS I. Project Directory II. Project Summary III. General Permit Authorization IV. Development and Contents of Plan A. Design Standards B. Content of Plan i. Site Plan ii. Site Description a. Construction Narrative b. Total Area of Disturbance C. Average Runoff Coefficient d. Receiving Waters e_ Wetland Acerage iii. Construction Sequencing iv. Control Measures a. TSS Removal Calculations b. Velocity Dissipation Calculations (Outlet Protection) V. Runoff Reduction and Low Impact Development (LID) Information vi. Inspector Assignments & Qualifications a. Plan Implementation Inspector b. Routine Inspector(s) vii. Monitoring a. Turbidity Monitoring Requirements 1. Monitoring Frequency 2. Sample Collection 3. Sampling Locations 4. Sampling Analysis 5. Turbidity Values b. Stormwater Monitoring Reports viii_ Contractors ix. Impaired Waters V. Stormwater Control Measures A. Erosion and Sediment Controls i. Soil Stabilization and Protection -2- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut ii. Structural Measures iii. Maintenance B. Dewatering Wastewaters C. Post-Construction Stormwater Management i. Post-Construction Performance Standards ii. Post-Construction Control Measures a. Runoff Reduction and Low Impact Development ("LID") Practices b. Suspended Solids and Floatables Removal c_ Velocity Dissipation D. Other Controls i. Waste Disposal ii. Washout Areas iii. Dust Control iv. Construction Closeout V. Hazardous Material Storage VI. Additional Control Measures for Impaired Waters VI I. Inspections A. Plan Implementation Inspections B. Routine Inspections VIII. Keeping Plan Current A. Permittee Initiated Changes B. DEEP Directed Changes IX. Failure to Prepare, Maintain or Amend Plan X. Record Keeping XI. Certifications XI I. Termination Requirements A. Post Construction Inspection B. Final Stabilization Inspection -3- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut APPENDIX A. General Permit Registration Form for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, effective 10/1/13 (non-electronic form). B. State of Connecticut, Department of Energy & Environmental Protection, Bureau of Materials Management & Compliance Assurance, Water Permitting & Enforcement Division: General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, Issued: August 21, 2013, Effective: October 1, 2013. C. Drainage Report D. Inspection Log Sheets E. Stormwater Monitoring Report (SMR) Form F. Contractor Certification Statement G. Natural Diversity Database Correspondence H. Subdivision Construction Plan Set (Sheets 1-25) I. Notice of Termination Form -4- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut I. Project Directory Registrant/ West River Farms, LLC (their heirs and assigns) Permittee: 833 Glenn Drive Woodmere, NY 11598 Contact: Jeff Respler, 646-321-9290 Preparer/ J.R. Russo & Associates, LLC Engineer: 1 Shoham Road East Windsor, CT 06088 Contact: Dana Steele, P.E., 860-623-0569 Reviewer/ Reynolds Engineering Services, LLC Engineer 68 Bogg Lane Lebanon, CT, 06249 Contact: Mark Reynolds, P.E., 860-423-0358 Contractor: II. Project Summary West River Farms, LLC proposes to construct a Planned Residential Development (PRD) subdivision identified as "West River Farms" at 329- 341 Scantic Road on a 41.1 acre parcel with frontage on the south/east side of Scantic Road in East Windsor, Connecticut and extending into South Windsor to the banks of the Scantic River. The development consists of 69 single family subdivision lots to be constructed in up to 4 phases. The lots will be serviced by underground utilities, public sewer and water and approximately 3,800 feet of new public roadway all located within 21.6 acres exclusively within the Town of East Windsor. The remaining 19.5 acres including land in both East Windsor and South Windsor to the Scantic River will be dedicated as open space. The open space parcel will include a stormwater management basin and discharge to the Scantic River that will be maintained by the Town of East Windsor. -5- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut III. General Permit Authorization The Connecticut Department of Energy & Environmental Protection regulates the discharge of stormwater from construction activities by requiring all projects disturbing one or more acre of land to register under the General Permit for the Discharge of Stormwater & Dewatering Wastewaters from Construction Activities. Since this project disturbs more than one acre of land, the construction activities are eligible for permitting through this general permit process. Furthermore, the project conforms to the general permit's requirements for authorization: A. This project is not within a Costal Boundary and therefore does not cause adverse impacts to coastal resources as defined in section 22a-93(15) of the Connecticut General Statutes (CGS). B. This project does not threaten the continued existence of any species listed pursuant to section 26-306 of the CGS as endangered or threatened and does not result in the destruction or adverse modification of habitat designated as essential to such species. A request was sent within the past 12 months to the Natural Diversity Database (NDDB) to inquire about potential species of concern. Two bat species were identified as potentially present on site. The DEEP biologists Elaine Hinsch made the following recommendation: Recommendations: Tree cutting should be conducted in the winter when the bats are not in the area, specifically work should not be conducted after April 15th through September 30th. Long- term impacts can be minimized by retaining large diameter coniferous and deciduous trees whenever possible. If these bats are found, please report the information to the Wildlife Division. Correspondence related to this determination are provided in Appendix G. C. This project is not located within an aquifer protection area as mapped under section 22a-354b of the CGS. D. This project is not a mining operation (standard industrial classification 10-14). -6- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut E. The stormwater from this project is not discharged to a Publicly Owned treatment Works (POTW). F. The stormwater from this project is not discharged entirely to groundwater (up to and including a 100-year, 24-hour rainfall event). G. This project does not discharge to a river component or tributary designated as Wild and Scenic by the United States Congress. H. The registrant and preparer have signed the certification on Party VII of the registration form. See note below. I. The professional engineer has signed the certification on Part VIII of the registration form. See note below. Note: For all certifications, it is understood that the words Certify/Certifier/Certification by a Design Professional are to be defined as a Design Professional's opinion based on his/her observation of conditions, knowledge, information and beliefs. It is expressly understood that the Design Professional's certification of a condition's existence relieves no other party of any responsibility or obligation he/she has accepted by contract or custom. J. The reviewing qualified professional has signed the certification on Part IX of the registration form. See note below. K. The project does not discharge directly to an impaired water, as indicated in the State's Integrated Water Quality Report. Specifically, the Scantic River is not listed as Impaired Waters in the latest 2014 report. Therefore, since this project meets the requirements for authorization under the general permit, a registration may be submitted as a "Locally Approvable Project" at least sixty (60) days prior to the planned commencement of the construction activity. The project qualifies as "locally approvable" because it is not a municipal, state or federal funded project and it required municipal approval. Submittal of the registration form and $650 fee is required because the project has a total disturbance of more than five (5) acres of land. And because this project has a total disturbance of fifteen (15) or more acres of land, it requires an independent third party Plan Review Certification. -7- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut This document, including all appendix and attachments constitutes a complete Stormwater Pollution Control Plan (SWPCP) or simply "Plan" as required by the General Permit. The permittee and his/her designated agents (i.e. contractors) are responsible for implementing, inspecting, monitoring and maintaining all measures identified in the Plan and complying with all conditions and requirements outlined in the General Permit. The permittee shall retain an updated copy of the complete SWPCP at the job site from the date construction is initiated at the site until the date construction at the site is completed. Since the SWPCP is a living document, it will require continual and consistent maintenance (updates) and additional information from the registrant and contractors/subcontractors. All contractors and subcontractors are required to familiarize themselves with the content of the Plan and shall sign the certification statement contained herein. All erosion and sediment control measures shall be installed and maintained in accordance with the Plan and the Connecticut Guidelines for Soil Erosion and Sediment Control, latest edition ("Guidelines"). The permittee is responsible for insuring that proper inspection records are kept on site and are available for review by governing authorities. The permittee shall provide copies of the Plan to governing authorities upon request. The permittee or his/her contractor shall also be responsible for monthly turbidity monitoring and reporting during construction. Finally, the permittee is also required to file a Notice of Termination with the DEEP once the site has been stabilized for at least three (3) months following cessation of the construction activities. For five (5) years following the Notice of Termination, the permittee shall retain copies of the Plan and all reports required by this general permit, and records of all data used to complete the registration for this general permit, unless the DEEP specifies another time period in writing. The provisions of the General Permit shall expire on September 30, 2018. -8- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut IV. Development and Contents of Plan This SWPCP is designed to minimize 1) pollution caused by soil erosion and sedimentation during and after construction; and 2) stormwater pollution caused by use of the site after construction is complete. A. Design Standards The Plan, including the Subdivision Construction Plan Set, latest revision has been prepared in accordance with sound engineering practices and consistent with the Guidelines and the 2004 Connecticut Stormwater Quality Manual. There are no other known remedial action plans, closure plans or other plans required by any other DEEP permit. B. Plan Content i. Site Plan The Subdivision Construction Plan Set, particularly sheet 5 — Phasing & Soil Erosion Control Plan, provides an overview of the key components of the SWPCP. Drainage patterns can be perceived from the available topographic contours and watershed areas are depicted on the Drainage Area Map found in the attached Drainage Report. Limits of soil disturbance are defined by tree clearing limits and sediment barriers. Major structural and non-structural controls are indicated by abbreviations noted on the E&S Legend. The plan also indicates locations where stabilization practices are expected to occur, areas which will be vegetated following construction, the monitoring outfall (wet pond outlet), surface waters (wetlands and Scantic River), and locations where stormwater will be discharged to a surface water (Scantic River). ii. Site Description a. Construction Narrative The proposed construction includes, but is not necessarily limited to the following activities: 1. Clearing and grubbing -9- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut 2. Striping and stockpiling topsoil 3. Mass earth moving, cuts and fills 4. Installation of storm, sanitary, water, electric, and other utilities 5. Roadway construction with associated features 6. Single family residential home construction (1 and 2 story wood frame structures with full concrete basements) 7. Construction and maintenance of erosion and sediment control measures and both temporary and permanent water quality measures. For a more detailed description of the construction activities, refer to the Subdivision Construction Plan Set. b. Total Area of Disturbance The existing site consists of 3 parcels totaling approximately 41.1± acres including 17± acres in South Windsor. The proposed development includes the subdivision of these properties into 69 single family lots and public roadways in East Windsor and a remaining 19.5 acre open space parcel in East Windsor and South Windsor. Most of the construction activity will occur in East Windsor. The stormwater outlet and post-construction water quality treatment area for the stormwater drainage system is located on the remaining 19.5± acre open space parcel. The total area of disturbance is approximately 26± acres. The project has been divided into four phases to limit the amount of disturbance: Phase I disturbance = 11 acres Phase 2 disturbance = 6 acres Phase 3 disturbance = 2.5 acres Phase 4 disturbance = 6.5 acres These phases will be further broken into sub-phases to limit the area of active disturbance to no more than 5 acres at a time and in most cases less than 2 acres at a time. This will be accomplished in phase 1 by constructing the wet pond and outlet pipe first. All phases will see limited disturbance by constructing -l 0- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut the roadway before disturbing most of the lots for house construction. C. Average Runoff Coefficient According to the NRCS Web Soil Survey, the on-site soils in the area of the development are predominately Windsor loamy fine sand designated as HSG A. Existing runoff coefficients for these soils were assumed to be C=0.15 based on CT DOT Drainage Manual Tables (see Drainage Report). The rear portion of the parcel in South Windsor, where the stormwater discharge will occur is predominately Elmwood sandy loam and Buxton silt loam, type C soils. The soils delineations are shown on the attached Soils Map in the Drainage Report. The post- development runoff coefficient for the 28.3 acre site drainage system watershed is 0.33. d. Receiving Waters All stormwater from this development is collected and discharged into the Scantic River, which is the immediate receiving waters for this development. The Scantic River ultimately discharges to the Connecticut River. e. Wetland Acerage The on-site wetlands were delineated by flagging and located by field survey. The total area on site designated as wetlands is 4.7 acres. Most of these wetlands are in the South Windsor portion of the site and all of them are within the Open Space Parcel. iii. Construction Sequencing The goal of the project's construction sequence is to complete the utility, roadway and drainage improvements in each phase as soon as possible to limit the total amount of disturbance on site during construction of individual residences. While some residential units may be constructed concurrently with the road and utility installation, the intent is that most of the units will be constructed after -11- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut the binder course of pavement has been installed on the roadway, and in no case shall there be allowed more than five (5) acres of disturbance at a time. The actual construction sequence is described in detail on the Phasing & Erosion Control Plan, sheet 5 of the Subdivision Construction Plan Set. iv. Control Measures a. TSS Removal Calculations The goal of 80% removal of total suspended solids (TSS) is met by the implementation of a wet pond in accordance with CT DEP Stormwater Quality Manual. Wet Ponds are an approved "Primary Treatment Practice" which as the Manual indicates is capable of removing at least 80% of the average annual TSS load and at least 80% of floatable debris, including oil and petroleum products. b. Velocity Dissipation Calculations (Outlet Protection) The wet pond outlet to the Scantic River is designed with a Preformed Scour Hole in accordance with the CT DOT Drainage Manual. Design calculations are included in the attached Drainage Report. V. Runoff Reduction and Low Impact Development (LID) Information This project utilizes LID measures to infiltrate roof and lawn runoff on a lot by lot basis before collecting and discharging runoff to a downstream stormwater basin near the Scantic River along the southeastern boundary of the site. A portion of the property is located within a floodplain of the Scantic River as indicated on the plans. Wetland boundaries throughout the site are also delineated on the plans as field located by a Soil Scientist. The wetlands and floodplains and their immediate surrounding areas are not suitable for infiltration. The infiltration systems include an infiltration basin on Lot 1 which collects roof and lawn runoff from Lots 1-17. A -12- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut second infiltration trench is proposed along Schanck Road to collect roof and lawn runoff from Lots 56-69. The remaining 38 lots were evaluated for individual subsurface roof infiltration chambers. Lots 39-49 were deemed unsuitable for infiltration. The remaining 27 lots will include roof infiltration to collect and retain at least '/2 of the WQV (0.5 inch rainfall). Calculations, and a more detailed description can be found in the attached Drainage Report under Groundwater Recharge. The purpose of the roof infiltration systems is to recharge groundwater. In order to achieve this goal, the receiving soils must remain permeable. Sediment deposits from erosion or other sources can clog receiving soils. Therefore erosion stabilization within the system's watershed is critical to long-term performance. Compaction of the receiving soils can also reduce permeability. Therefore vehicle traffic should be restricted in these areas. Because these areas are located in the yards of the residential lots, long term traffic and compaction should be minimal. vi. Inspector Assignments & Qualifications The following personnel have been assigned to conduct the required inspections. The inspector's qualifications shall conform to the requirements specified in the General Permit. Resumes documenting required license/certification and/or experience shall be attached to the Plan. a. Plan Implementation Inspector Name: License/Certification: E&S Planning/Design Experience: years (min. 8) E&S Responsible Charge Experience: years (min. 4) b. Routine Inspector(s) Name: Related License/Certification: -13- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut or, E&S Review/Install Experience: years (min. 5) Name: Related License/Certification: or, E&S Review/Install Experience: years (min. 5) Name: Related License/Certification: or, E&S Review/Install Experience: years (min. 5) vii. Monitoring Stormwater monitoring and reporting is an integral part of the Plan to verify that the E&S design and implementation is meeting the required goals for protecting downstream receiving waters. Water samples are taken at the designated sampling location and sent to a qualified testing laboratory for analysis. The test results are then entered onto the DEEP Stormwater Monitoring Report (SMR) form and submitted electronically. Permittee's Monitoring Designee: Site Normal Working Hours: a. Turbidity Monitoring Requirements 1. Monitoring Frequency (Monthly) 2. Sample Collection During a storm event that results in a discharge, the Designee shall grab a sample from the sampling location at least three separate times during the storm event in order to capture an accurate representation of the flow and characteristics of the discharge. The -14- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut first sample shall be taken within the first hour of the stormwater discharge. In cases where samples are collected outside of normal working hours, the first sample shall be taken at the start of normal working hours. Normal working hours shall include at a minimum, Monday through Friday, 8.00 AM to 6.00 PM. If the sample includes snow or ice melt, it must be so noted on the SMR form. Samples containing exclusively snow or ice melt are not valid. 3. Sampling Locations Sampling is required at all point source discharges of stormwater from disturbed areas. Since the entire site discharges to a single point source location, only one sampling location is required at the 36" RCP outlet at the Scantic River. If the river flow is backing up into 36" pipe, a sample may be taken from the inlet to the upstream drop manhole structure. The sampling location shall be clearly marked in the field with a flag, stake or other visible marker. 4. Sampling Analysis Sampling and analysis shall be prescribed by 40 CFR Part 136. 5. Turbidity Values The reported turbidity value shall be the average of all turbidity samples taken at the sampling point during a given storm. b. Stormwater Monitoring Reports Within 30 calendar days following the end of each month, the permittee shall enter the stormwater sampling results on the prescribed SMR and submit it to DEEP using their web-based tool called NetDMR. -15- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut If there was no discharge during the previous month, the permittee shall submit the form as required with the words "no discharge" entered in place of the monitoring results. Typically only one storm per month is required to be monitored, but if additional storms are monitored, all results shall be submitted. When sampling protocols are modified due to the limitations of normal working hours or unsafe conditions as described in the General Permit, a description of and reason for the modifications shall be included with the SMR. On or before 15 days after the issuance of this permit, the Permittee shall contact the DEEP at deep.netdmr(cDct.gov and initiate the Net DMR subscription process for electronic submission of SMR information. On or before 90 days after the issuance of this permit, the Permittee shall submit a signed and notarized copy of the NetDMR Subscriber Agreement to the DEEP. viii. Contractors Each contractor and subcontractor that will perform construction activities on the site that have the potential to cause pollution of the waters of the State (i.e. Scantic River) shall sign the "Contractor Certification Statement" found in Appendix E. Each certification shall be made a part of the Plan. If lots in the subdivision are sold off to other parties, the contractors and subcontractors working on those lots shall also be required to sign the certifications. The Permittee shall give each contractor a copy of the complete Plan and shall retain their certifications as part of the Plan. ix. Impaired Waters The Scantic River is not identified as an impaired water, therefore the requirements for discharge to impaired waters do not apply to this project. -16- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut V. Stormwater Control Measures A. Erosion and Sediment Controls i. Soil Stabilization and Protection Prior to earthwork, perimeter silt fence (GSF) or straw wattles (SW) shall be installed downgradient of construction activities. Care shall be taken to ensure that existing vegetation is preserved where attainable and that disturbed portions of the site are stabilized as soon as possible. Silt fence shall be maintained until the disturbed areas are stabilized with vegetative cover. Where construction activities have permanently ceased or have temporarily been suspended for more than seven days, or when final grades are reached in any portion of the site, additional stabilization practices shall be implemented within three days. Practices shall include temporary seeding (TS), permanent seeding (PS), and mulch for seed (MS) as shown on the Construction Plans. If field conditions warrant, the Engineer may require additional control measures such as erosion control blankets (ECB), permanent turf reinforcement mats (TRM) or sodding (SO) for soil stabilization. Areas which remain disturbed but inactive for at least thirty (30) days shall receive temporary seeding (TS) in accordance with the Guidelines. ii. Structural Measures A construction entrance (CE) shall be installed at each site entrance to prevent tracking of sediment into the adjacent roadway system. The stormwater basin (SB) and riprap (RR) preformed scour hole (OP) shall be installed first to provide sediment removal and treatment area for collected site runoff prior to discharge to the Scantic River. Once the basin and outlet controls are in place, the storm drainage system will be installed up to the area of the subdivision lots in Phase 1. -17- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut Silt Sacks will be installed at each catch basin inlet to provide inlet protection (IP) from sediment entering the piped drainage system. All runoff from the disturbed areas of the site will be piped to this remote treatment area to bypass more sensitive and erosion prone wetland areas. However, disturbed areas will be limited in most cases to less than 2 acres at a time by phasing of the construction work. Therefore, no further structural measures are required. The stormwater basin (SB) therefore does not need to be designed as a Sediment Basin, but it will provide additional settling treatment during construction. If disturbed areas exceed 2 acres, temporary sediment traps (TST) will be installed prior to discharge to the piped drainage system. According to the CT Guidelines for Soil Erosion and Sediment Control, the required capacity of a sediment trap is 134 cubic yards per acre of contributing area, half as wet storage below the primary outlet, and half as dry storage between the primary outlet and overflow. The wet and dry storage requirements of the sediment traps will be determined by the Engineer as an "Engineered Corrective Action". Two potential TST locations are depicted on the E&S Plan (sheet 5 of the Construction Plans). iii. Maintenance All erosion and sediment control measures, including vegetation, and all other protective measures identified on the plans, shall be maintained by the Permittee or his/her designated agent (Contractor) in accordance with the Guidelines and the Construction Plans. Specific details regarding maintenance of erosion and sediment control measures are provided on the Erosion Notes and Details (sheets 20-25 of the Construction Plans). B. Dewatering Wastewaters If required, dewatering shall be performed in accordance with section 5-13 of the Guidelines. Dewatering wastewater shall be discharged to temporary settling basins (PSB) or portable sediment bags to allow sediment to settle before discharging to vegetated -l 8- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut areas. Pumping settling basins, if required, shall be constructed in accordance with the Guidelines. C. Post-Construction Stormwater Management As detailed in the Drainage Report (Appendix C), this development is designed to minimize the discharge of pollutants in stormwater discharges that will occur after construction operations have been completed. Post-construction stormwater management measures include individual lot subsurface infiltration of roof runoff, multi-lot roof/lawn infiltration basins, and a stormwater basin (SB) near the discharge point at the Scantic River. The stormwater basin is designed as a Wet Pond in accordance with the Stormwater Quality Manual. i. Post-Construction Performance Standards The stormwater basin is sized to treat the full water quality volume of the project watershed. ii. Post-Construction Control Measures a. Runoff Reduction and Low Impact Development ("LID") Practices This project incorporates subsurface roof infiltration on individual lots and multi-lot roof and lawn infiltration basins. These LID practices are designed to reduce runoff and promote groundwater recharge. b. Suspended Solids and Floatables Removal Implementation of the stormwater wet pond with forebay meets the goal of 80% removal of the annual sediment load. The Stormwater Quality Manual indicates that this BMP meets the removal goal. C. Velocity Dissipation The outlet to the Scantic River is designed in accordance with the CT DOT Drainage Manual as a Preformed Scour Hole. A drop manhole structure was also added to reduce energy and velocity at the outlet. -l 9- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut D. Other Controls i. Waste Disposal Best Management Practices (BMP's) shall be utilized at the site to ensure that no litter, debris, building materials, or similar materials are discharged to waters of the State. The site shall be kept neat and clean after each workday. A construction waste dumpster shall be provided for proper disposal of waste materials. A portable sanitary facility shall be provided and maintained at the site during construction activities. ii. Washout Areas The Contractor shall provide a designated washout area for concrete trucks and shall note the location on the E&S Plan (sheet 5). The washout area shall consist of an excavated pit sized such that waste materials will be contained and allowed to solidify in place with no surface discharge of washout wastewaters from the area. A sign shall be installed adjacent to each washout area to inform concrete equipment operators to utilize the proper facilities. Washout areas shall be inspected weekly to assess the holding capacity and functionality of the area. Hardened concrete shall be removed when the concrete has reached '/2 the height of the pit or as necessary to avoid overflows. The washout area shall not be located within 150' from any wetland or watercourse and shall not be located in an area designated for infiltration of stormwater. iii. Dust Control A construction entrance (CE) pad shall be installed at the site entrances off of Scantic Road prior to any work occurring in the relevant project phases. The purpose of the entrance pad is to prevent sediment from tracking onto town roads. Dust control (DC) measures shall be implemented as required to limit dust on the site. This shall include a watering truck to keep soils moist during windy dry periods. iv. Construction Closeout -20- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut All post-construction stormwater structures shall be cleaned of construction sediment and any remaining silt fence or Silt Sacks shall be removed upon stabilization of the site. V. Hazardous Material Storage There shall be no storage containers for chemicals or petroleum products on site. This restriction is intended to protect areas along Scantic Road and Schanck Road with private wells (many of which are shallow). VI. Additional Control Measures for Impaired Waters This project does not discharge directly to an impaired water, therefore the General Permit requirements related to impaired waters do not apply. VI I. Inspections All construction activities shall be inspected initially for Plan Implementation and then weekly for routine inspections. A. Plan Implementation Inspections shall be conducted by a qualified soil erosion and sediment control professional or a qualified professional engineer within 90 days of the start of construction. The Plan Implementation inspector cannot be an employee of the registrant, the Plan preparer, or employed by the Plan preparer, or have any ownership interest in the project. B. Routine Inspections shall be conducted by the permittee in the following manner: i. Maintain a rain gauge on-site to document rainfall amounts. ii_ A qualified inspector as defined in the General Permit shall perform routine inspections every week and within 24 hours of the end of a storm that generates a discharge for evidence of, or the potential for, pollutants entering the drainage system and impacts to the receiving waters (Scantic River). Storms less than 0.5 inches which end after normal working hours shall occur immediately upon the start of the subsequent normal working hours. Routine inspections shall including at a minimum, the following: a. Disturbed areas not finally stabilized -2 l- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut b. All E&S control measures C. The stormwater basin d. Infiltration basins for evidence of clogging e. Soil Stockpiles f. Construction entrances for evidence of off-site sediment tracking. iii_ The qualified inspector(s) shall evaluate the effectiveness of E&S controls, the stormwater basin, stabilization practices, and any other controls implemented to control pollution and determine if it is necessary to install, maintain, or repair such controls and/or practices to improve the quality of stormwater discharge. iv. Every inspection shall be documented in a report on the Form included in Appendix D and shall be keep with the Plan for review by DEEP inspectors. V. Non-engineered corrective actions shall be implemented within 3 calendar days of the date of inspection. Engineered corrective actions shall be implemented within 7 calendar days. The Plan shall be updated to reflect the change within 3 days of implementation. Vill. Keeping Plan Current The Permittee is responsible for keeping their Plan in compliance with the General Permit at all times. This may involve updating the plan during the construction process. A. Permittee Initiated Changes The Permittee shall make necessary changes to the Plan i. If the Plan fails to prevent pollution or fails to otherwise comply with any other provision of the General Permit. ii. Whenever there is a change in contractors or subcontractors at the site_ iii_ Whenever there is a change in design, construction, operation or maintenance at the site which has the potential for the discharge of pollutants to the waters of the state (i.e., Scantic River) which has not otherwise been addressed in the Plan. -22- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut B. DEEP Directed Changes i. The commissioner of the DEEP may notify the Permittee at any time that the Plan and/or the site do not meet one or more of the minimum requirements of the General Permit. Within 7 days of such notice, or such other time as the commissioner may allow, the permittee shall make the required changes to the Plan and perform all actions required by such revised Plan. ii_ Within 15 days of such notice, the Permittee shall submit a written certification that the requested changes have been made and implemented. IX. Failure to Prepare, Maintain or Amend Plan In no event shall failure to complete, maintain or update a Plan, relieve a permittee of the responsibility to implement any actions required to protect the waters of the state and to comply with the conditions of the General Permit. X. Record Keeping The permittee shall retain copies of the Plan and all reports required by the General Permit, and records of all data used to complete the registration for a period of at least five years, unless the commissioner specifies another time period in writing. Inspection records must be retained as part of the Plan for a period of 5 years after the date of inspection. The permittee shall retain an updated copy of the Plan at the construction site from the date construction is initiated at the site until the date construction is completed. XI. Certifications Permittee Certification: 1 have personally examined and am familiar with the information submitted in this document and all attachments thereto, and / certify that, based on reasonable investigation, including my inquiry of those individuals responsible for obtaining the information, the submitted information is true, accurate and complete to the best of my knowledge and belief. 1 understand that a false statement made in -23- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut this document or its attachments may be punishable as a criminal offense, in accordance with section 22a-6 of the Connecticut General Statutes, pursuant to section 53a-157b of the Connecticut General Statutes, and in accordance with any other applicable statute. Signature: Date: Printed Name of Person Signing: Title: The required SWPCP Preparer Certification and SWPCP Reviewer Certification are provided on the General Permit Registration Form provided in Appendix A. XI I. Termination Requirements Upon completion of the work and stabilization of the site, the permittee shall complete the Termination Notice found in Appendix I and submit it to the DEEP after the following final inspections are completed: A. Post-Construction Inspection Once all post-construction stormwater measures have been installed and cleaned of any sediment or debris, the registrant shall contact an independent qualified E&S professional (e.g. the Plan Reviewer), who will inspect the site to confirm compliance with the post-construction stormwater requirements of the Plan. B. Final Stabilization Inspection Once the site has been stabilized for at least three months, the registrant shall have the site inspected by an independent qualified E&S professional (e.g. the Plan Reviewer) to confirm final stabilization. -24- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut APPENDIX A General Permit Registration Form for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, effective 10/1/13 (non-electronic form). -25- CPPU USE ONLY • Connecticut Department of App#: Energy & Environmental Protection Doc#: Bureau of Natural Resources Wildlife Division Check#: No fee required Program: Natural Diversity Database Endangered Species Hardcopy Electronic Request for Natural Diversity Data Base (NDDB) State Listed Species Review Please complete this form in accordance with the instructions (DEEP-INST-007)to ensure proper handling of your request. There are no fees associated with NDDB Reviews. Part I: Preliminary Screening & Request Type Before submitting this request, you must review the most current Natural Diversity Data Base "State and Federal Listed Species and Significant Natural Communities Maps" found on the DEEP website. These maps are updated twice a year, usually in June and December. Does your site, including all affected areas, fall in an NDDB Area according to the map instructions: ® Yes ❑ No Enter the date of the map reviewed for pre-screening: December 2014 This form is being submitted for a : ® New NDDB request ❑ New Safe Harbor Determination (optional) must be ❑ Renewal/Extension of a NDDB Request, associated with an application for a GP for the Discharge of without modifications and within one Stormwater and Dewatering Wastewaters from year of issued NDDB determination Construction Activities (no attachments required) ❑ Renewal/Extension of an existing Safe Harbor Determination ❑ With modifications ❑ Without modifications (no attachments required) [CPPU Use Only -NDDB-Listed Species [CPPU Use Only-NDDB-Safe Harbor Determination#1736] Determination#1736] Enter NDDB Determination Number for Enter Safe Harbor Determination Number for Renewal/Extension: Renewal/Extension: DEEP-REQ-APP-007 Page 1 of 6 Rev.04/08/14 Part II: Requester Information *If the requester is a corporation, limited liability company, limited partnership, limited liability partnership, or a statutory trust, it must be registered with the Secretary of State. If applicable, the name shall be stated exactly as it is registered with the Secretary of State. Please note, for those entities registered with the Secretary of State, the registered name will be the name used by DEEP. This information can be accessed at the Secretary of the State's database CONCORD. (w\hw.concord-sots.ct.gov/CONCORD/index.msp) If the requester is an individual,provide the legal name(include suffix)in the following format.First Name;Middle Initial;Last Name;Suffix(Jr, Sr., II, III, etc.). If there are any changes or corrections to your company/facility or individual mailing or billing address or contact information, please complete and submit the Request to Change company/Individual Information to the address indicated on the form. 1. Requester* Company Name: J.R. Russo &Associates, LLC Contact Name: Dana Steele Address: 1 Shoham Road City/Town: East Windsor State: CT Zip Code: 06088 Business Phone: 860-623-0669 ext. **E-mail: dsteele@jrrusso.com **By providing this email address you are agreeing to receive official correspondence from the department, at this electronic address,concerning this request. Please remember to check your security settings to be sure you can receive emails from"ct.gov"addresses.Also, please notify the department if your e-mail address changes a) Requester can best be described as: ❑ Individual ❑ Federal Agency ❑ State agency ❑ Municipality ❑ Tribal ❑ *business entity(* if a business entity complete i through iii): i) Check type ❑ corporation ❑ limited liability company ❑ limited partnership ❑ limited liability partnership ❑ statutory trust ❑ Other: ii) Provide Secretary of the State Business ID#: 0948628 This information can be accessed at the Secretary of the State's database (CONCORD). (www.concord-sots.ct.gov/CONCORD/index.'sp) iii) ❑ Check here if your business is NOT registered with the Secretary of State's office. b) Acting as (Affiliation), pick one: ❑ Property owner ❑ Consultant ® Engineer ❑ Facility owner ❑ Applicant ❑ Biologist ❑ Pesticide Applicator ❑ Other representative: 2. List Primary Contact to receive Natural Diversity Data Base correspondence and inquiries, if different from requester. Company Name: Contact Person: Title: Mailing Address: City/Town: State: Zip Code: Business Phone: ext. **E-mail: DEEP-REQ-APP-007 Page 2 of 6 Rev.04/08/14 Part III: Site Information This request can only be completed for one site. A separate request must be filed for each additional site. 1. SITE NAME AND LOCATION Site Name or Project Name: West River Farms Town(s): East Windsor Street Address or Location Description: 329-341 Scantic Road Size in acres, or site dimensions: 41.1 Latitude and longitude of the center of the site in decimal degrees (e.g., 41.23456 -71.68574): Latitude: 41.871696 Longitude: -72.696131 Method of coordinate determination (check one): ❑ GPS ❑ Photo interpolation using CTECO map viewer ® Other (specify): iTouchmap.com 2a. Describe the current land use and land cover of the site. Residential, forest, and field/grassland b. Check all that apply and enter the size in acres or% of area in the space after each checked category. ❑ Industrial/Commercial ® Residential 8.8 ac. ® Forest 6.4 ac. ® Wetland 9.1 ac. ® Field/grassland 16.8 ac. ❑ Agricultural ❑ Water ❑ Utility Right-of-way ❑ Transportation Right-of-way ❑ Other(specify): Part IV: Project Information 1. PROJECT TYPE: Choose Project Type: Residential development/Subdivision , If other describe: 2. Is the subject activity limited to the maintenance, repair, or improvement of an existing structure within the existing footprint? ❑ Yes ❑ No If yes, explain. DEEP-REQ-APP-007 Page 3 of 6 Rev.04/08/14 Part IV: Project Information (continued) 3. Give a detailed description of the activity which is the subject of this request and describe the methods and equipment that will be used. Include a description of steps that will be taken to minimize impacts to any known listed species. 69 lot subdivision in up to 4 phases with a total of 3,800 linear feet of road construction. Lots will be served by public water and sewer and accessed entirely from Scantic Road in East Windsor. Construction will use standard construction equipment to construct a stormwater wet pond near the Scantic River. An 18'wide gravel access drive with turnaround approximately 1,700 feet in length will be constructed to access the pond and area to be deeded as open space from a private roadway known in East Windsor as Schanck Road. The 69 lots and subdivision roads will be constructed entirely within the Town of East Windsor,while the wet pond and open space will be primarily in South Windsor,with river frontage along the north side of the Scantic River. 4. If this is a renewal or extension of an existing Safe Harbor request with modifications, explain what about the project has changed. This is NOT a renwal or safe harbor request. However, this project received a NDDB determination in 2012 which has lapsed. At that time the project included 61 lots and 3,000 feet of roadway. The subdivision has since been redesigned with 69 lots and 3,800 feet of roadway. These changes are all in East Windsor, about 1,000 feet from the Scantic River. Changes in South Windsor, closer to the river are limited to the widening of the gravel access road from 10'to 18'. 5. Provide a contact for questions about the project details if different from Part II primary contact. Name: Phone: E-mail: DEEP-REQ-APP-007 Page 4 of 6 Rev.04/08/14 Part V: Request Requirements and Associated Application Types Check one box from either Group 1, Group 2 or Group 3, indicating the appropriate category for this request. Group 1. If you check one of these boxes, complete Parts I —VII of this form and submit the required attachments A and B. ❑ Preliminary screening was negative but an NDDB review is still requested ❑ Request regards a municipally regulated or unregulated activity(no state permit/certificate needed) ❑ Request regards a preliminary site assessment or project feasibility study ❑ Request relates to land acquisition or protection ❑ Request is associated with a renewal of an existing permit, with no modifications Group 2. If you check one of these boxes, complete Parts I —VII of this form and submit required attachments A, B, and C. ❑ Request is associated with a new state or federal permit application ❑ Request is associated with modification of an existing permit ❑ Request is associated with a permit enforcement action ❑ Request regards site management or planning, requiring detailed species recommendations ❑ Request regards a state funded project, state agency activity, or CEPA request ❑ Group 3. If you are requesting a Safe Harbor Determination, complete Parts I-VII and submit required attachments A, B, and D. Safe Harbor determinations can only be requested if you are applying for a GP for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities If you are filing this request as part of a state or federal permit application(s) enter the application information below. Permitting Agency and Application Name(s): State DEEP Application Number(s), if known: State DEEP Enforcement Action Number, if known: State DEEP Permit Analyst(s)/Engineer(s), if known: Is this request related to a previously submitted NDDB request? ® Yes ❑ No If yes, provide the previous NDDB Determination Number(s), if known: 201204382 DEEP-REQ-APP-007 Page 5 of 6 Rev.04/08/14 Part VI: Supporting Documents Check each attachment submitted as verification that all applicable attachments have been supplied with this request form. Label each attachment as indicated in this part (e.g., Attachment A, etc.) and be sure to include the requester's name, site name and the date. Please note that Attachments A and B are required for all new requests and Safe Harbor renewals/extensions with modifications. Renewals/Extensions with no modifications do not need to submit any attachments. Attachments C and D are supplied at the end of this form. ® Attachment A: Overview Map: an 8 1/2" X 11" print/copy of the relevant portion of a USGS Topographic Quadrangle Map clearly indicating the exact location of the site. ® Detailed Site Map: fine scaled map showing site boundary and area of work details Attachment B: on aerial imagery with relevant landmarks labeled. (Site and work boundaries in GIS [ESRI ArcView shapefile, in NAD83, State Plane, feet] format can be substituted for detailed maps, see instruction document) ❑ Attachment C: Supplemental Information, Group 2 requirement(attached, DEEP-APP-007C) ❑ Section is Supplemental Site Information and supporting documents ❑ Section ii: Supplemental Project Information and supporting documents ❑ Attachment D: Safe Harbor Report Requirements, Group 3 (attached, DEEP-APP-007D) Part VII: Requester Certification The requester and the individual(s) responsible for actually preparing the request must sign this part. A request will be considered incomplete unless all required signatures are provided. "I have personally examined and am familiar with the information submitted in this document and all attachments thereto, and I certify that based on reasonable investigation, including my inquiry of the individuals responsible for obtaining the information, the submitted information is true, accurate and complete to the best of my knowledge and belief." 7/30/16 Signature of Requester(a typed name will substitute for Date a handwritten signature) Dana Steele Principal Engineer Name of Requester(print or type) Title (if applicable) Signature of Preparer (if different than above) Date Name of Preparer(print or type) Title (if applicable) Note: Please submit the completed Request Form and all Supporting Documents to: CENTRAL PERMIT PROCESSING UNIT DEPARTMENT OF ENERGY & ENVIRONMENTAL PROTECTION 79 ELM STREET HARTFORD, CT 06106-5127 Or email request to: deep.nddbrequest(d_)ct.gov DEEP-REQ-APP-007 Page 6 of 6 Rev.04/08/14 Attachment C: Supplemental Information, Group 2 requirement Section is Supplemental Site Information 1. Existing Conditions Describe all natural and man-made features including wetlands, watercourses, fish and wildlife habitat, floodplains and any existing structures potentially affected by the subject activity. Such features should be depicted and labeled on the site plan that must be submitted. Photographs of current site conditions may be helpful to reviewers. ❑ Site Photographs (optional) attached ❑ Site Plan/sketch of existing conditions attached 2. Biological Surveys Has a biologist visited the site and conducted a biological survey to determine the presence of any endangered, threatened or special concern species ❑ Yes ❑ No If yes, complete the following questions and submit any reports of biological surveys, documentation of the biologist's qualifications, and any NDDB survey forms. Biologist(s) name: Habitat and/or species targeted by survey: Dates when surveys were conducted: ❑ Reports of biological surveys attached ❑ Documentation of biologist's qualifications attached ❑ NDDB Survey forms for any listed species observations attached Section ii: Supplemental Project Information 1. Provide a schedule for all phases of the project including the year, the month and/or season that the proposed activity will be initiated and the duration of the activity. 2. Describe and quantify the proposed changes to existing conditions and describe any on-site or off-site impacts. In addition, provide an annotated site plan detailing the areas of impact and proposed changes to existing conditions. ❑ Annotated Site Plan attached DEEP-APP-007C 1 of 1 Rev.04/08/14 Attachment D: Safe Harbor Report Requirements Submit a report, as Attachment D, that synthesizes and analyzes the information listed below. Those providing synthesis and analysis need appropriate qualifications and experience. A request for a safe harbor determination shall include: 1. Habitat Description and Map(s), including GIS mapping overlays, of a scale appropriate for the site, identifying: wetlands, including wetland cover types; plant community types; topography; soils; bedrock geology; floodplains, if any; land use history; and water quality classifications/criteria. 2. Photographs -The report should include photographs of the site taken from the ground and also all reasonably available aerial or satellite photographs and an analysis of such photographs. 3. Inspection -A visual inspection(s) of the site should be conducted, preferably when the ground is visible, and described in the report. This inspection can be helpful in confirming or further evaluating the items noted above. 4. Biological Surveys - The report should include all biological surveys of the site where construction activity will take place that are reasonably available to a registrant. A registrant shall notify the Department's Wildlife Division of biological studies of the site where construction activity will take place that a registrant is aware of but are not reasonably available to the registrant. 6. Based on items#1 through 4 above, the report shall include a Natural Resources Inventory of the site of the construction activity. This inventory should also include a review of reasonably available scientific literature and any recommendations for minimizing adverse impacts from the proposed construction activity on listed species or their associated habitat. 6. In addition, to the extent the following is available at the time a safe harbor determination is requested, a request for a safe harbor determination shall include and assess: Information on Site Disturbance Estimates/Site Alteration information Vehicular Use Construction Activity Phasing Schedules, if any; and Alteration of Drainage Patterns DEEP-APP-007D 1 of 1 Rev.04/08/14 STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut APPENDIX B State of Connecticut, Department of Energy & Environmental Protection, Bureau of Materials Management & Compliance Assurance, Water Permitting & Enforcement Division: General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, Issued: August 21, 2013, Effective: October 1, 2013. -26- Connecticut Department of `ENERGY & ENVIRONMENTAL PROTECTION 79 Elm Street • Hartford,CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities tT _ 0 Issuance Date: August 21 , 2013 Effective Date: October 1, 2013 Printed on recycled paper BMMCA Rev.8/21/13 DEEP-WPED-GP-015 1 of 45 General Permit for Discharge of Stormwater and Dewatering Wastewaters from Construction Activities Table of Contents Section1. Authority...............................................................................................................................................4 Section2. Definitions.............................................................................................................................................4 Section 3. Authorization Under This General Permit........................................................................................9 (a) Eligible Activities ........................................................................................................................9 (b) Requirements for Authorization...................................................................................................9 (c) Registration................................................................................................................................. 15 (d) Small Construction..................................................................................................................... 17 (e) Geographic Area......................................................................................................................... 17 (f) Effective Date and Expiration Date of this General Permit........................................................ 17 (g) Effective Date of Authorization.................................................................................................. 17 (h) Revocation of an Individual Permit............................................................................................ 18 (1) Issuance of an Individual Permit................................................................................................. 18 Section 4. Registration Requirements................................................................................................................18 (a) Who Must File a Registration..................................................................................................... 18 (b) Scope of Registration.................................................................................................................. 18 (c) Contents of Registration............................................................................................................. 18 (d) Where to File a Registration.......................................................................................................23 (e) Availability of Registration and Plan..........................................................................................23 (f) Additional Information...............................................................................................................24 (g) Additional Notification...............................................................................................................24 (h) Action by Commissioner............................................................................................................24 (1) Transition to New General Permit..............................................................................................24 0) Latest Date to Submit a Registration Under this General Permit...............................................25 Section 5. Conditions of this General Permit....................................................................................................25 (a) Conditions Applicable to Certain Discharges.............................................................................25 (b) Stormwater Pollution Control Plan.............................................................................................26 (c) Monitoring..................................................................................................................................38 (d) Reporting and Record Keeping Requirements............................................................................41 (e) Regulations of Connecticut State Agencies Incorporated into this General Permit...................42 (f) Reliance on Registration.............................................................................................................42 (g) Duty to Correct and Report Violations.......................................................................................42 (h) Duty to Provide Information.......................................................................................................42 (1) Certification of Documents.........................................................................................................42 0) Date of Filing..............................................................................................................................42 (k) False Statements .........................................................................................................................43 (1) Correction of Inaccuracies..........................................................................................................43 (m) Transfer of Authorization...........................................................................................................43 (n) Reopener.....................................................................................................................................43 (o) Other Applicable Law.................................................................................................................43 (p) Other Rights................................................................................................................................43 Section6. Termination Requirements................................................................................................................44 (a) Notice of Termination.................................................................................................................44 BMMCA Rev.8/21/13 DEEP-WPED-GP-015 2 of 45 (b) Termination Form.......................................................................................................................44 (c) Where to File a Termination Form.............................................................................................45 Section7. Commissioner's Powers.....................................................................................................................45 (a) Abatement of Violations.............................................................................................................45 (b) General Permit Revocation, Suspension, or Modification..........................................................45 (c) Filing of an Individual Application.............................................................................................45 Appendix A Endangered and Threatened Species Appendix B Low Impact Development Guidance Information and Fact Sheet Appendix C Aquifer Protection Guidance Information Appendix D Coastal Management Act Determination Form Appendix E Conservation Districts of Connecticut Appendix F Memorandum of Agreement Between DEEP and Conservation Districts Appendix G Historic Preservation Review Appendix H Wild& Scenic Rivers Guidance BMMCA Rev.8/21/13 DEEP-WPED-GP-015 3 of 45 General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities Section 1. Authority This general permit is issued under the authority of section 22a-430b of the Connecticut General Statutes. Section 2. Definitions The definitions of terms used in this general permit shall be the same as the definitions contained in section 22a-423 of the Connecticut General Statutes and section 22a-430-3(a)of the Regulations of Connecticut State Agencies. As used in this general permit,the following definitions shall apply: "x year, 24-hour rainfall event"means the maximum 24-hour precipitation event with a probable recurrence interval of once in the given number of years(i.e. x=2,25 or 100), as defined by the National Weather Service in Technical Paper Number 40,"Rainfall Frequency Atlas of the United States,"May 1961, and subsequent amendments, or equivalent regional or state rainfall probability information developed therefrom. "Annual sediment load"means the total amount of sediment carried by stormwater runoff on an annualized basis. "Aquifer protection area"means aquifer protection area as defined in section 22a-354h of the Connecticut General Statutes. "Best engineering practices"means the design of engineered control measures to control pollution to the maximum extent achievable using measures that are technologically available and economically practicable. "CFR"means the Code of Federal Regulations. "Coastal area"means coastal area as defined in section 22a-93(3)of the Connecticut General Statutes. "Coastal waters"means coastal waters as defined in section 22a-93(5)of the Connecticut General Statutes. "Commissioner"means commissioner as defined in section 22a-2(b)of the Connecticut General Statutes. "Construction activity"means any activity associated with construction at a site including,but not limited to, clearing and grubbing,grading, excavation, and dewatering. "Department"means the Department of Energy&Environmental Protection. "Developer"means a person who or municipality which is responsible,either solely or partially through contract, for the design and construction of a project site. "Dewatering wastewater"means wastewater associated with the construction activity generated from the lowering of the groundwater table,the pumping of accumulated stormwater or uncontaminated groundwater from an excavation,the pumping of surface water from a cofferdam, or pumping of other surface water that has been diverted into a construction site. "District"means a soil and water conservation district established pursuant to section 22a-315 of the Connecticut General Statutes. Appendix E lists the Districts,their geographic delineations, and contact information. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 4 of 45 "Disturbance"means the execution of any of the construction activity(ies)defined in this general permit. "Effective Impervious Cover"is the total area of a site with a Rational Method runoff coefficient of 0.7 or greater(or other equivalent methodology) from which stormwater discharges directly to a surface water or to a storm sewer system. "Engineered stormwater management system"means any control measure and related appurtenances which requires engineering analysis and/or design by a professional engineer. "Erosion"means the detachment and movement of soil or rock fragments by water,wind,ice and gravity. "Fresh-tidal wetland'means a tidal wetland with an average salinity level of less than 0.5 parts per thousand. "Grab sample"means an individual sample collected in less than fifteen minutes. "Groundwater"means those waters of the state that naturally exist or flow below the surface of the ground. "Guidelines"means the 2002 Connecticut Guidelines for Soil Erosion and Sediment Control, as amended, established pursuant to section 22a-328 of the Connecticut General Statutes. "High Quality Waters"means those waters defined as high quality waters in the Connecticut Water Quality Standards published by the Department, as may be amended. "Impaired water(s)"means those surface waters of the state designated by the commissioner as impaired pursuant to Section 303(d)of the Clean Water Act and as identified in the most recent State of Connecticut Integrated Water Quality Report. "In Responsible charge"means professional experience for which the Commissioner determines that a professional's primary duties consistently involve a high level of responsibility and decision making in the planning and designing of engineered stormwater management systems or in the planning and designing of soil erosion and sediment controls for residential and commercial construction projects. The Commissioner shall consider the following in determining whether a professional's experience qualifies as responsible charge experience: (1) the level of independent decision-making exercised; (ii) the number of individuals and the disciplines of the other professionals that the professional supervised or coordinated; (iii) the extent to which a professional's responsibilities consistently involved the review of work performed by other professionals involved the planning and designing of engineered stormwater management systems or the planning and designing of soil erosion and sediment controls for residential and commercial construction projects; (iv) the extent to which a professional's responsibilities consistently involved the planning and designing of engineered stormwater management systems or the planning and designing of soil erosion and sediment controls for residential and commercial construction projects and whether such responsibilities were an integral and substantial component of the professional's position; (v) the nature of a professional's employer's primary business interests and the relation of those interests to planning and designing of engineered stormwater management systems or to planning and designing of soil erosion and sediment controls for residential and commercial construction projects; BMMCA Rev.8/21/13 DEEP-WPED-GP-015 5 of 45 (vi) the extent to which a professional has engaged in the evaluation and selection of scientific or technical methodologies for planning and designing of engineered stormwater management systems or for planning and designing of soil erosion and sediment controls for residential and commercial construction projects; (vii) the extent to which a professional drew technical conclusions,made recommendations, and issued opinions based on the results of planning and designing of engineered stormwater management systems or of planning and designing of soil erosion and sediment controls for residential and commercial construction projects; or (viii) any other factor that the Commissioner deems relevant. "Individual permit"means a permit issued to a specific permittee under section 22a-430 of the Connecticut General Statutes. "Inland wetland"means wetlands as defined in section 22a-38 of the Connecticut General Statutes. "Landscape Architect"means a person with a currently effective license issued in accordance with chapter 396 of the Connecticut General Statutes. "Linear Project"includes the construction of roads,railways,bridges,bikeways, conduits, substructures, pipelines, sewer lines,towers,poles, cables,wires,connectors, switching,regulating and transforming equipment and associated ancillary facilities in a long,narrow area. "Locally approvable project"means a construction activity for which the registration is not for a municipal, state or federal project and is required to obtain municipal approval for the project. "Locally exempt project"means a construction activity for which the registration is for a project authorized under municipal, state or federal authority and may not be required to obtain municipal approval for the project. "Low Impact Development"or"LID"means a site design strategy that maintains,mimics or replicates pre- development hydrology through the use of numerous site design principles and small-scale treatment practices distributed throughout a site to manage runoff volume and water quality at the source. "Minimize",for purposes of implementing the control measures in Section 5(b)(2)of this general permit, means to reduce and/or eliminate to the extent achievable using control measures that are technologically available and economically practicable and achievable in light of best industry practice. "Municipal separate storm sewer system"or"MS4"means conveyances for stormwater(including roads with drainage systems,municipal streets, catch basins,curbs,gutters,ditches,man-made channels or storm drains)owned or operated by any municipality and discharging to surface waters of the state. "Municipality"means a city,town or borough of the state as defined in section 22a-423 of the Connecticut General Statutes. "Nephelometric Turbidity Unit"or"NTU"means a unit measure of turbidity from a calibrated nephelometer. "Normal Working Hours",for the purposes of monitoring under Section 5(c)of this general permit, are considered to be,at a minimum,Monday through Friday,between the hours of 8:00 am and 6:00 pm,unless additional working hours are specified by the permittee. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 6 of 45 "Permittee"means any person who or municipality which initiates, creates or maintains a discharge in accordance with Section 3 of this general permit. "Person"means person as defined in section 22a-423 of the Connecticut General Statutes. "Phase"means a portion of a project possessing a distinct and complete set of activities that have a specific functional goal wherein the work to be completed in the phase is not dependent upon the execution of work in a later phase in order to make it functional. "Point Source"means any discernible,confined and discrete stormwater conveyance(including but not limited to, any pipe, ditch, channel,tunnel, conduit,discrete fissure, container,rolling stock,concentrated animal feeding operation, landfill leachate collection system,vessel or other floating craft)from which pollutants are or may be discharged. "Professional Engineer" or "P.E." means a person with a currently effective license issued in accordance with chapter 391 of the Connecticut General Statutes. "Qualified Inspector"means an individual possessing either(1)a professional license or certification by a professional organization recognized by the commissioner related to agronomy,civil engineering, landscape architecture, soil science, and two years of demonstrable and focused experience in erosion and sediment control plan reading, installation,inspection and/or report writing for residential and commercial construction projects in accordance with the Guidelines; or(2)five years of demonstrable and focused experience in erosion and sediment control plan reading,installation,inspection and/or report writing for residential and commercial construction projects in accordance with the Guidelines; or(3)certification by the Connecticut Department of Transportation(DOT). "Qualified professional engineer"means a professional engineer who has, for a minimum of eight years, engaged in the planning and designing of engineered stormwater management systems for residential and commercial construction projects in accordance with the Guidelines and the Stormwater Quality Manual including,but not limited to, a minimum of four years in responsible charge of the planning and designing of engineered stormwater management systems for such projects. "Qualified soil erosion and sediment control professional"means a landscape architect or a professional engineer who: (1)has for a minimum of eight years engaged in the planning and designing of soil erosion and sediment controls for residential and commercial construction projects in accordance with the Guidelines including,but not limited to, a minimum of four years in responsible charge of the planning and designing of soil erosion and sediment controls for such projects; or(2)is currently certified as a professional in erosion and sediment control as designated by EnviroCert International, Incorporated(or other certifying organization acceptable to the commissioner) and has for a minimum of six years experience engaged in the planning and designing of soil erosion and sediment controls for residential and commercial construction projects in accordance with the Guidelines including,but not limited to, a minimum of four years in responsible charge in the planning and designing of soil erosion and sediment controls for such projects. "Registrant"means a person or municipality that files a registration. "Registration"means a registration form filed with the commissioner pursuant to Section 4 of this general permit. "Regulated Municipal Separate Storm Sewer System"or"Regulated MS4"means the separate storm sewer system of the City of Stamford or any municipally-owned or-operated separate storm sewer system(as defined above)authorized by the most recently issued General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems(MS4 general permit) including all those located partially BMMCA Rev.8/21/13 DEEP-WPED-GP-015 7 of 45 or entirely within an Urbanized Area and those additional municipally-owned or municipally-operated Small MS4s located outside an Urbanized Area as may be designated by the commissioner. "Retain"means to hold runoff on-site to promote vegetative uptake and groundwater recharge through the use of runoff reduction or LID practices or other measures. In addition, it means there shall be no subsequent point source release to surface waters from a storm event defined in this general permit or as approved by the commissioner. "Runoff reduction practices"means those post-construction stormwater management practices used to reduce post-development runoff volume delivered to the receiving water, as defined by retaining the volume of runoff from a storm up to the first half inch or one inch of rainfall in accordance with Sections 5(b)(2)(C)(1)(a)or(b),respectively. Runoff reduction is quantified as the total annual post-development runoff volume reduced through canopy interception, soil amendments, evaporation,rainfall harvesting, engineered infiltration, extended filtration or evapo-transpiration. "Sediment"means solid material, either mineral or organic,that is in suspension, is transported, or has been moved from its site of origin by erosion. "Site"means geographically contiguous land on which a construction activity takes place or on which a construction activity for which authorization is sought under this general permit is proposed to take place. Non-contiguous land or water owned by the same person shall be deemed the same site if such land is part of a linear project(as defined in this section) or is otherwise connected by a right-of-way,which such person controls. "Soil"means any unconsolidated mineral and organic material of any origin. "Stabilize"means the use of measures as outlined in the 2002 Connecticut Guidelines for Soil Erosion and Sediment Control, as amended, or as approved by the commissioner,to prevent the visible movement of soil particles and development of rills. "Structural measure"means a measure constructed for the temporary storage and/or treatment of stormwater runoff. "Standard Industrial Classification Code"or"SIC Code"means those codes provided in the Standard Industrial Classification Manual,Executive Office of the President, Office of Management and Budget 1987. "Standard of care",as used in Section 3(b),means to endeavor to perform in a manner consistent with that degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances. "Stormwater"means waters consisting of rainfall runoff,including snow or ice melt during a rain event. "Stormwater Quality Manual"means the 2004 Connecticut Stormwater Quality Manual published by the Connecticut Department of Energy&Environmental Protection,as amended. "Surface water"means that portion of waters,as the term"waters"is defined in section 22a-423 of the Connecticut General Statutes, located above the ground surface. "Tidal wetland"means a wetland as that term is defined in section 22a-29(2)of the Connecticut General Statutes. "Total disturbance"means the total area on a site where soil will be exposed or susceptible to erosion during the course of all phases of a project. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 8 of 45 "Total Maximum Daily Load"or"TNff)L"means the maximum capacity of a surface water to assimilate a pollutant as established by the commissioner,including pollutants contributed by point and non-point sources and a margin of safety. "Upland soils"means soils which are not designated as poorly drained,very poorly drained, alluvial, or flood plain by the National Cooperative Soils Survey, as may be amended, of the Natural Resources Conservation Service of the United States Department of Agriculture and/or the inland wetlands agency of the municipality in which the project will take place. "Water company"means water company as defined in section 25-32a of the Connecticut General Statutes. "Water Quality Standards or Classifications"means those water quality standards or classifications contained in the Connecticut Water Quality Standards published by the Department, as may be amended. "Water Quality Volume"or"WQV"means the volume of runoff generated by one inch of rainfall on a site as defined in the 2004 Connecticut Stormwater Quality Manual, as amended. Section 3. Authorization Under This General Permit (a) Eligible Activities This general permit authorizes the discharge of stormwater and dewatering wastewaters to surface waters from construction activities on a site,as defined in this general permit,with a total disturbance of one or more acres of land area on a site,regardless of project phasing. In the case of a larger plan of development(such as a subdivision),the estimate of total acres of site disturbance shall include,but is not limited to,road and utility construction, individual lot construction (e.g. house,driveway, septic system, etc.),and all other construction associated with the overall plan, regardless of the individual parties responsible for construction of these various elements. (b) Requirements for Authorization This general permit authorizes the construction activity listed in the"Eligible Activities" section (Section 3(a))of this general permit provided: (1) Coastal Management Act Such construction activity must be consistent with all applicable goals and policies in section 22a- 92 of the Connecticut General Statutes,and must not cause adverse impacts to coastal resources as defined in section 22a-93(15)of the Connecticut General Statutes. Please refer to the Appendix D for additional guidance. (2) Endangered and Threatened Species Such activity must not threaten the continued existence of any species listed pursuant to section 26-306 of the Connecticut General Statutes as endangered or threatened and must not result in the destruction or adverse modification of habitat designated as essential to such species. See Appendix A. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 9 of 45 (3) Aquifer Protection Areas Such construction activity, if it is located within an aquifer protection area as mapped under section 22a-354b of the General Statutes,must comply with regulations adopted pursuant to section 22a-354i of the General Statutes. Please refer to the Appendix C for additional guidance. For any construction activity regulated pursuant to sections 8(c) and 9(b)of the Aquifer Protection Regulations(section 22a-354i(l)-(10)of the Regulations of Connecticut State Agencies),the Stormwater Pollution Control Plan(Plan)must assure that stormwater run-off generated from the regulated construction activity(1)is managed in a manner so as to prevent pollution of groundwater, and(ii)complies with all the requirements of this general permit. (4) Mining Operations Exception The stormwater discharge resulting from an activity classified as Standard Industrial Classification 10 through 14 (the mining industry)is not authorized by this general permit and is regulated under the most recently issued General Permit for the Discharge of Stormwater Associated with Industrial Activity. (5) Discharge to POTW The stormwater is not discharged to a Publicly Owned Treatment Works (POTW). (6) Discharge to Groundwater The stormwater is not discharged entirely to groundwater,meaning a stormwater discharge to a surface water will not occur up to a 100-year,24-hour rainfall event. (7) Such construction activity must be consistent with the Wild and Scenic Rivers Act(16 U.S.C. 1271-1287) for those river components and tributaries which have been designated as Wild and Scenic by the United States Congress. Further, such construction activities must not have a direct and adverse effect on the values for which such river designation was established. Please refer to Appendix H for additional guidance. (8) Certification Requirements for Registrants and other Individuals As part of the registration for this general permit, the registrant and any other individual or individuals responsible for preparing the registration submits to the commissioner a written certification which,at a minimum, complies with the following requirements: (A) The registrant and any other individual or individuals responsible for preparing the registration and signing the certification has completely and thoroughly reviewed, at a minimum, this general permit and the following regarding the activities to be authorized under such general permit: (i) all registration information provided in accordance with Section 4(c)(2) of such general permit; (11) the project site,based on a site inspection; (III) the Stormwater Pollution Control Plan; and (iv) any plans and specifications and any Department approvals regarding such Stormwater Pollution Control Plan; BMMCA Rev.8/21/13 DEEP-WPED-GP-015 10 of 45 (B) The registrant and any other individual or individuals responsible for preparing the registration and signing the certification pursuant to this general permit has, based on the review described in section 3(b)(8)(A) of this general permit, made an affirmative determination to: (i) comply with the terms and conditions of this general permit; (11) maintain compliance with all plans and documents prepared pursuant to this general permit including,but not limited to,the Stormwater Pollution Control Plan; (iii) properly implement and maintain the elements of the Stormwater Pollution Control Plan; and (iv) properly operate and maintain all stormwater management systems in compliance with the terms and conditions of this general permit to protect the waters of the state from pollution; (C) Such registrant and any other individual or individuals responsible for preparing the registration certifies to the following statement: "I hereby certify that I am making this certification in connection with a registration under such general permit, submitted to the commissioner by [INSERT NAME OF REGISTRANT] for an activity located at [INSERT ADDRESS OF PROJECT OR ACTIVITY] and that all terms and conditions of the general permit are being met for all discharges which have been initiated and such activity is eligible for authorization under such permit. I further certify that a system is in place to ensure that all terms and conditions of this general permit will continue to be met for all discharges authorized by this general permit at the site. I certify that the registration filed pursuant to this general permit is on complete and accurate forms as prescribed by the commissioner without alteration of their text. I certify that I have personally examined and am familiar with the information that provides the basis for this certification, including but not limited to all information described in Section 3(b)(8)(A) of such general permit, and I certify, based on reasonable investigation, including my inquiry of those individuals responsible for obtaining such information, that the information upon which this certification is based is true, accurate and complete to the best of my knowledge and belief. I certify that I have made an affirmative determination in accordance with Section 3(b)(8)(B) of this general permit. I understand that the registration filed in connection with such general permit is submitted in accordance with and shall comply with the requirements of Section 22a-430b of Connecticut General Statutes. I also understand that knowingly making any false statement made in the submitted information and in this certification may be punishable as a criminal offense, including the possibility of fine and imprisonment,under section 53a-157b of the Connecticut General Statutes and any other applicable law." (9) The registrant has submitted to the commissioner a written certification by a professional engineer or,where appropriate,a landscape architect licensed in the State of Connecticut for the preparation,planning and design of the Stormwater Pollution Control Plan and stormwater management systems: (A) The professional engineer or landscape architect shall certify to the following statement: "I hereby certify that I am a [professional engineer][landscape architect] licensed in the State of Connecticut. I am making this certification in connection with a registration under such general permit, submitted to the commissioner by[INSERT NAME OF REGISTRANT] for an activity located at [INSERT ADDRESS OF PROJECT OR ACTIVITY]. I certify that I have thoroughly and completely reviewed the Stormwater BMMCA Rev.8/21/13 DEEP-WPED-GP-015 11 of 45 Pollution Control Plan for the project or activity covered by this certification. I further certify,based on such review and on the standard of care for such projects,that the Stormwater Pollution Control Plan has been prepared in accordance with the Connecticut Guidelines for Soil Erosion and Sediment Control, as amended,the Stormwater Quality Manual, as amended, and the conditions of the general permit, and that the controls required for such Plan are appropriate for the site. I further certify,based on reasonable investigation, including my inquiry of those individuals responsible for obtaining such information,that the information upon which this certification is based is true, accurate and complete to the best of my knowledge and belief. I also understand that knowingly making any false statement in this certification may subject me to sanction by the Department and/or be punishable as a criminal offense, including the possibility of fine and imprisonment,under section 53a-157b of the Connecticut General Statutes and any other applicable law." (B) Nothing in this section shall be construed to authorize a professional engineer or a landscape architect to engage in any profession or occupation requiring a license under any other provision of the general statutes without such license. (10) Plan Review and Certification by a District for Locally Approvable Projects For those Plans not reviewed in accordance with Section 3(b)(11), below, the registrant has submitted to the commissioner a written certification by the appropriate regional District for the review of the Stormwater Pollution Control Plan pursuant to Appendix F, which, at a minimum, complies with the following requirements: (A) the Plan Review Certification must be signed by the District. Information on the District review process is outlined in the Memorandum of Agreement provided in Appendix F. In cases where the District is unable to complete review of the Plan within the time limits specified in the Memorandum of Agreement in Appendix F, a notice to that effect signed by the District may be submitted in lieu of the certification. (B) the Stormwater Pollution Control Plan has been prepared in accordance with the requirements of Section 5(b)of the general permit. (C) Nothing in this subsection shall be construed to authorize District personnel to engage in any profession or occupation requiring a license under any other provision of the general statutes without such license. (11) Plan Review and Certification by a Qualified Soil Erosion and Sediment Control Professional and Qualified Professional Engineer for Locally Approvable Projects For those Plans not reviewed in accordance with Section 3(b)(10), above,the registrant has submitted to the commissioner a written certification by a qualified professional engineer or a qualified soil erosion and sediment control professional in accordance with the following requirements: (A) for projects disturbing more than one acre and less than fifteen(15)acres, such qualified soil erosion and sediment control professional or qualified professional engineer: (1) is not an employee, as defined by the Internal Revenue Service in the Internal Revenue Code of 1986, of the registrant; and (11) has no ownership interest of any kind in the project for which the registration is being submitted. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 12 of 45 (B) for projects disturbing fifteen(15) acres or more, such qualified soil erosion and sediment control professional or qualified professional engineer: (i) is not an employee, as defined by the Internal Revenue Service in the Internal Revenue Code of 1986, of the registrant; (ii) did not engage in any activities associated with the preparation,planning,designing or engineering of such plan for soil erosion and sediment control or plan for stormwater management systems on behalf of such registrant; (iii) is not under the same employ as any person who engaged in any activities associated with the preparation,planning, designing or engineering of such plans and specifications for soil erosion and sediment control or plans and specifications for stormwater management systems on behalf of such registrant; and (iv) has no ownership interest of any kind in the project for which the registration is being submitted. (C) The qualified professional engineer or qualified soil erosion and sediment control professional signing the certification has, at a minimum, completely and thoroughly reviewed this general permit and the following regarding the discharges to be authorized under such general permit: (i) all registration information provided in accordance with Section 4(c)(2)of such general permit; (ii) the site,based on a site inspection; (iii) the Stormwater Pollution Control Plan; (iv) the Guidelines; (v) the Stormwater Quality Manual,if applicable; and (vi) all non-engineered and engineered stormwater management systems, including any plans and specifications and any Department approvals regarding such stormwater management systems. (D) Affirmative Determination (1) The qualified soil erosion and sediment control professional signing the certification must have made an affirmative determination,based on the review described in section 3(b)(11)(C)of this general permit that: (a) the Stormwater Pollution Control Plan prepared and certified pursuant to the registration is adequate to assure that the project or activity authorized under this general permit, if implemented in accordance with the Stormwater Pollution Control Plan,will comply with the terms and conditions of such general permit; and (b) all non-engineered stormwater management systems: (1) have been designed to control pollution to the maximum extent achievable using measures that are technologically available and economically BMMCA Rev.8/21/13 DEEP-WPED-GP-015 13 of 45 practicable and that conform to those in the Guidelines and the Stormwater Quality Manual; (2) will function properly as designed; (3) are adequate to ensure compliance with the terms and conditions of this general permit; and (4) will protect the waters of the state from pollution. (ii) The qualified professional engineer signing the certification must have made an affirmative determination,based on the review described in section 3(b)(11)(C) of this general permit that: (a) the Stormwater Pollution Control Plan prepared and certified pursuant to the registration is adequate to assure that the activity authorized under this general permit,if implemented in accordance with the Stormwater Pollution Control Plan,will comply with the terms and conditions of such general permit; and (b) all non-engineered and engineered stormwater management systems: (1) have been designed to control pollution to the maximum extent achievable using measures that are technologically available and economically practicable and that conform to those in the Guidelines and the Stormwater Quality Manual; (2) will function properly as designed; (3) are adequate to ensure compliance with the terms and conditions of this general permit; and (4) will protect the waters of the state from pollution. (E) The qualified professional engineer or qualified soil erosion and sediment control professional shall,provided it is true and accurate,certify to the following statement: "I hereby certify that I am a qualified professional engineer or qualified soil erosion and sediment control professional,or both,as defined in the General Permit for Discharge of Stormwater and Dewatering Wastewaters from Construction Activities and as further specified in sections 3(b)(11)(A)and(B)of such general permit. I am making this certification in connection with a registration under such general permit, submitted to the commissioner by [INSERT NAME OF REGISTRANT] for an activity located at[INSERT ADDRESS OF PROJECT OR ACTIVITY]. I have personally examined and am familiar with the information that provides the basis for this certification,including but not limited to all information described in Section 3(b)(11)(C)of such general permit, and I certify,based on reasonable investigation, including my inquiry of those individuals responsible for obtaining such information,that the information upon which this certification is based is true, accurate and complete to the best of my knowledge and belief. I further certify that I have made the affirmative determination in accordance with Sections 3(b)(11)(D)(1)and(11) of this general permit. I understand that this certification is part of a registration submitted in accordance with Section 22a-430b of Connecticut General Statutes and is subject to the requirements and responsibilities for a qualified professional in such statute. I also understand that knowingly making any false statement in this certification may be BMMCA Rev.8/21/13 DEEP-WPED-GP-015 14 of 45 punishable as a criminal offense, including the possibility of fine and imprisonment,under section 53a-157b of the Connecticut General Statutes and any other applicable law." (F) Nothing in this subsection shall be construed to authorize a qualified soil erosion and sediment control professional or a qualified professional engineer to engage in any profession or occupation requiring a license under any other provision of the general statutes without such license. (12) New Discharges to Impaired Waters New stormwater discharges directly to an impaired water, as indicated in the State's Integrated Water Quality Report,must be in accordance with the following conditions: (A) Stormwater discharges that go directly to impaired waters seeking authorization under this general permit shall comply with the requirements of this subsection(B)below if the indicated cause or potential cause of the impairment is one of the following: • Site Clearance(Land Development or Redevelopment) • Post-Development Erosion and Sedimentation • Source Unknown(if cause of impairment is Sedimentation/Siltation) (B) Such stormwater discharge is authorized if the permittee complies with the requirements of Section 5(b)(3)of this permit and receives a written affirmative determination from the commissioner that the discharge meets the requirements of that section. In such case,the permittee must keep a copy of the written determination onsite with the Plan. If the permittee does not receive such affirmative determination,the construction activity is not authorized by this general permit and must obtain an individual permit. (c) Registration Pursuant to the"Registration Requirements"section(Section 4) of this general permit,a completed registration with respect to the construction activity shall be filed with the commissioner as follows: (1) Locally Approvable Projects The registration must: (A) Be electronically submitted, along with all required elements in subsections(B),(C)and (D),below, at least sixty(60)days prior to the planned commencement of the construction activity. (B) Include the Registration Form(available at www.ct.gov/deep/stormwater). (C) Include any additional forms and information regarding compliance and/or consistency with the Coastal Management Act,Impaired Waters(including TMDL requirements), Endangered and Threatened Species,and Aquifer Protection Areas that may be required pursuant to the"Requirements of Authorization"section(Section 3(b)). (D) Include a Plan Review Certification in accordance with the"Plan Review Certification" (Section 5(b)(8)). Locally Approvable projects may also choose to make their Plan electronically available in accordance with Section 4(c)(2)(N)of this general permit. The 60 day period cited in subsection BMMCA Rev.8/21/13 DEEP-WPED-GP-015 15 of 45 (A),above,will not begin until all required elements have been submitted. Failure to include any of these required submissions shall be grounds to reject the registration. (2) Locally Exempt Projects The registration must: (A) Be electronically submitted, along with all required elements in subsections(B), (C)and (D),below, at least: (i) sixty(60)days prior to the planned commencement of the construction activity if the site has a total disturbed area of between one(1)and twenty(20) acres; or (ii) ninety(90)days prior to the planned commencement of construction activity if the site: (a) has a total disturbed area greater than twenty(20)acres; (b) discharges to a tidal wetland(that is not a fresh-tidal wetland)within 500 feet of the discharge point; or (c) is subject to the impaired waters provisions of Section 3(b)(12). (B) Include the Registration Form(available at www.ct.gov/deep/stormwater). (C) Include any additional forms and information regarding compliance and/or consistency with the Coastal Management Act, Impaired Waters(including TMDL requirements), Endangered and Threatened Species,and Aquifer Protection that may be required pursuant to the"Requirements of Authorization"section(Section 3(b)). (D) Include an electronic copy of the Stormwater Pollution Control Plan(Plan)(or a web address where the electronic Plan can be downloaded)for the commissioner's review. The electronic Plan shall be in AdobeTM PDF format or similar publicly available format in common use. DO NOT INCLUDE in this electronic copy any pages or other material that do not pertain to stormwater management or erosion and sedimentation control(such as electrical and lighting plans,boundary or lot surveys,building plans,non-stormwater related detail sheets, etc.). The 60 or 90 day periods cited in subsections(A), above,will not begin until all required elements have been submitted. Failure to include any of these required submissions shall be grounds to reject the registration. (3) Re-Registration of Existing Projects For sites previously registered under any previous version of the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities and for which no Notice of Termination has been submitted pursuant to the"Termination Requirements"section (Section 6), a Re-Registration Form(available at www.ct.gov/deep/stormwater)pursuant to Section 4(c)(3) shall be submitted on or before February 1,2014. The re-registration fee is payable(or waived)in accordance with Section 4(c)(1)(A)(111). Resubmission of the permittee's Plan is not required unless specifically requested by the commissioner. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 16 of 45 (d) Small Construction For construction projects with a total disturbance of between one and five acres,the permittee shall adhere to the erosion and sediment control land use regulations of the municipality in which the construction activity is conducted, as well as the Guidelines and the Stormwater Quality Manual. No registration or Plan review and certification shall be required for such construction activity provided a land-use commission of the municipality(i.e.planning/zoning,wetland,conservation, etc) reviews and issues a written approval of the proposed erosion and sediment control measures,pursuant to the requirements of section 22a-329 of the Connecticut General Statutes. In the absence of such municipal commission approval,the permittee shall register with the DEEP under the requirements for a Locally Exempt Project and comply with all applicable conditions of this general permit. (e) Geographic Area This general permit applies throughout the State of Connecticut. (f) Effective Date and Expiration Date of this General Permit The registration provisions of Section 3(c)and 4 of this General Permit, including any applicable definitions or provisions referred to in those sections insofar as they facilitate submission of a registration, shall be effective September 1,2013. All remaining provisions of this General Permit shall be effective on October 1,2013. The provisions of this General Permit shall expire on September 30,2018. (g) Effective Date of Authorization A construction activity is authorized by this general permit at such time as specified in subsections(1) and(2),below. (1) Authorization Timelines The activity is authorized based on the following timelines unless superseded by subsection(2), below: (A) for locally approvable projects, sixty(60)days after the submission of the registration form required by Section 4(c), or (B) for locally exempt projects under 20 acres, sixty(60)days after the submission of the registration form required by Section 4(c), or (C) for locally exempt projects over 20 acres,ninety(90)days after the submission of the registration form required by Section 4(c). (2) Alternate Authorization Timelines If one of the following conditions for authorization applies,that condition shall supersede those of subsection(1), above: (A) for sites for which the registration and Plan availability and review provisions of Section 4(e)are completed prior to the authorization periods in subsection(1),above,the commissioner may authorize the activity upon such completion, or BMMCA Rev.8/21/13 DEEP-WPED-GP-015 17 of 45 (B) for sites subject to the conditions of Section 3(b)(2), 3(b)(12)and/or Section 5(a)(2),the activity is authorized on the date of the commissioner's affirmative determination and/or approval,or (C) for sites authorized by any previous version of this general permit and for which no Notice of Termination has been submitted pursuant to the"Termination Requirements" section (Section 6),the activity is authorized effective October 1,2013. Authorization under this general permit shall cease if a re-registration form is not submitted on or before February 1. 2014. (h) Revocation of an Individual Permit If a construction activity is eligible for authorization under this general permit and such activity is presently authorized by an individual permit,the existing individual permit may be revoked by the commissioner upon a written request by the permittee. If the commissioner revokes such individual permit in writing, such revocation shall take effect on the effective date of authorization of such activity under this general permit. (i) Issuance of an Individual Permit If the commissioner issues an individual permit under section 22a-430 of the Connecticut General Statutes, authorizing a construction activity authorized by this general permit,this general permit shall cease to authorize that activity beginning on the date such individual pernut is issued. Section 4. Registration Requirements (a) Who Must File a Registration With the exception noted in the"Small Construction" section(Section 3(d))of this general permit,any person or municipality which initiates,creates, originates or maintains a discharge described in the "Eligible Activities" section(Section 3(a))of this general permit shall file with the commissioner a registration form that meets the requirements of the"Contents of Registration"section(Section 4(c)) of this general permit(or a re-registration form) and the applicable fee within the timeframes and in the amounts specified in Sections 3(c) and 4(c)(1)(A),respectively. Any such person or municipality filing a registration remains responsible for maintaining compliance with this general permit. (b) Scope of Registration Each registration shall be limited to the discharge at or from one site;no registration shall cover discharges at or from more than one site. (c) Contents of Registration (1) Fees (A) Registration Fee A registration, if required, shall not be deemed complete unless the registration fee has been paid in full. (i) Locally Approvable Projects A registration fee of$625.00 shall be submitted to the Department with the registration form. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 18 of 45 (11) Locally Exempt Projects A registration fee shall be submitted with a registration form as follows: (a) For sites with total disturbance of between one(1)and twenty(20)acres,the fee shall be$3,000. (b) For sites with total disturbance equal to or greater than twenty(20)acres and less than fifty(50) acres,the fee shall be$4,000. (c) For sites with total disturbance equal to or greater than fifty(50) acres,the fee shall be$5,000. The fees for municipalities shall be half of those indicated in subsections(a), (b)and (c)above pursuant to section 22a-6(b)of the Connecticut General Statutes. State and Federal agencies shall pay the full fees specified in this subsection. (iii) Re-registration (a) For sites that registered under the previous version of the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities prior to September 1,2012 and for which no Notice of Termination has been submitted pursuant to the"Termination Requirements"section(Section 6), the re-registration fee shall be$625 payable with submission of the re-registration form within one hundred twenty(120)days from the effective date of this general permit. If a Notice of Termination is submitted prior to that time,no registration or fee are required. (b) For sites that registered under the previous version of the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities on or after September 1,2012 and for which no Notice of Termination has been submitted pursuant to the"Termination Requirements" section(Section 6),the re-registration fee is waived. (B) The registration fee shall be paid electronically or by check or money order payable to the Department of Energy&Environmental Protection. (C) The registration fee is non-refundable. (2) Registration Form A registration shall be filed electronically on forms prescribed and provided by the commissioner (available at: www.ct.jzov/deep/stormwater v�p/stormwater)and shall include,but not be limited to,the following: (A) Legal name, address, and telephone number of the registrant. If the registrant is a person(as defined in Section 2 of this permit)transacting business in Connecticut and is registered with the Connecticut Secretary of the State,provide the exact name as registered with the Connecticut Secretary of the State. (B) Legal name, address and telephone number of the owner of the property on which the construction activity will take place. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 19 of 45 (C) Legal name, address and telephone number of the primary contact for departmental correspondence and inquiries,if different from the registrant. (D) Legal name, address and telephone number of the developer of the property on which the construction activity is to take place. (E) Legal name, address and daytime and off-hours telephone numbers of the general contractor(s)or other representative(s),if different from the developer. (F) Legal name, address and telephone number of any consultant(s),engineer(s)or landscape architect(s)retained by the permittee to prepare the registration and Stormwater Pollution Control Plan. (G) Location address or description of the site for which the registration is filed. (H) The estimated duration of the construction activity. (I) Indication of the normal working hours of the site. (J) A brief description of the construction activity,including,but not limited to: (i) Total number of acres to be disturbed,regardless of phasing. (ii) Assurance that construction is in accordance with the Guidelines and local erosion and sediment control ordinances,where applicable. (iii) For sites in the Coastal Boundary, documentation that the DEEP Office of Long Island Sound Programs or local governing authority has issued a coastal site plan approval or a determination that the project is exempt from coastal site plan review(see Appendix D)in accordance with section 22a-92 and 22a-93(15)of the Connecticut General Statutes. (iv) Documentation that the construction activity will not threaten the continued existence of any species listed pursuant to section 26-306 of the Connecticut General Statutes as endangered or threatened and will not result in the destruction or adverse modification of habitat designated as essential to such species (see Appendix A). (v) For sites discharging to certain impaired waters,as specified in Section 3(b)(12), documentation that the construction activity meets the requirements of that section and Section 5(b)(3)for authorization under this general permit. (vi) Assurance that the construction activity is not located within an aquifer protection area (see Appendix C)as mapped under section 22a-354b of the Connecticut General Statutes or, if it is located within an aquifer protection area,that the construction activity will comply with regulations adopted pursuant to section 22a-3541 of the Connecticut General Statutes. (vii) For a proposed locally approvable project,a plan review certification from the appropriate District, qualified soil erosion and sediment control professional, and/or qualified professional engineer in accordance with Section 5(b)(l0)or(11) or a notice from the District that they were unable to complete the Plan review within the time limits specified in the Memorandum of Agreement in Appendix F. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 20 of 45 (K) A brief description of the stormwater discharge, including: (1) The name of the municipal separate storm sewer system or immediate surface water body or wetland to which the stormwater runoff will discharge; (11) Verification of whether or not the site discharges to a tidal wetland(that is not a fresh- tidal wetland)within 500 feet of the discharge point,to a high quality water or to an impaired water with or without a TMDL; (Ili) The name of the watershed or nearest waterbody to which the site discharges. (iv) Location of the stormwater discharge(s)including latitude and longitude. (L) The total effective impervious cover for the site before and after the proposed construction activity. (M) Documentation that the proposed construction activity has been reviewed for consistency with state Historic Preservation statutes,regulations,and policies including identification of any potential impacts on property listed or eligible for listing on the Connecticut Register of Historic Places. A review conducted for an Army Corps of Engineers Section 404 wetland permit would meet this qualification. Refer to Appendix G for guidance on conducting the required review. (N) Registrants for locally approvable projects may, if they choose, attach an electronic copy of their Plan to their registration or provide a web address where their Plan may be downloaded. If an electronic plan is not provided,the registrant is still subject to the requirements for submission of a Plan to the commissioner or a member of the public pursuant to the"Plan Availability" section(Section 4(e)(2)). An electronic Plan shall be in AdobeTM PDF format or similar publicly available format in common use. DO NOT INCLUDE in the Plan any pages or other material that do not pertain to stormwater management or erosion and sedimentation control(such as electrical and lighting plans, boundary or lot surveys,building plans,non-stormwater related detail sheets, etc.). (0) Registrants for all locally exempt projects must submit an electronic copy of their Plan or a web address where the electronic Plan can be downloaded. The electronic Plan shall be in AdobeTM PDF format or similar publicly available format in common use. DO NOT INCLUDE in this Plan any pages or other material that do not pertain to stormwater management or erosion and sedimentation control(such as electrical and lighting plans, boundary or lot surveys,building plans,non-stormwater related detail sheets, etc.). (P) The certification of the registrant and of the individual or individuals responsible for actually preparing the registration, in accordance with Section 3(b)(8). (Q) For all registrations, a design certification must be signed by a professional engineer in accordance with Section 3(b)(9).: (R) For registrations for locally approvable projects a review certification must be signed by either: (1)a District in accordance with Section 3(b)(10), or(ii)a qualified soil erosion and sediment control professional and/or qualified professional engineer in accordance with either Section 3(b)(11). If the registrant is not capable of submitting electronically, a paper form may be submitted in accordance with Section 4(a). BMMCA Rev.8/21/13 DEEP-WPED-GP-015 21 of 45 (3) Re-Registration Form For sites previously registered under any previous version of the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities and for which no Notice of Termination has been submitted pursuant to the"Termination Requirements"section (Section 6), a re-registration shall be filed electronically pursuant to Sections 3(c)(3)and 3(g) on forms prescribed and provided by the commissioner(available at: www.ct. og v/deep/stormwater) and shall include,but not be limited to,the following: (A) Legal name, address, and telephone number of the registrant. If the registrant is a person(as defined in Section 2 of this permit)transacting business in Connecticut and is registered with the Connecticut Secretary of the State,provide the exact name as registered with the Connecticut Secretary of the State. (B) The previously issued permit number(beginning with GSN). (C) Legal name, address and telephone number of the owner of the property on which the construction activity will take place. (D) Legal name, address and telephone number of the primary contact for departmental correspondence and inquiries,if different from the registrant. (E) Legal name, address and telephone number of the developer of the property on which the subject construction activity is to take place. (F) Legal name, address and daytime and off-hours telephone numbers of the general contractor(s)or other representative(s),if different from the developer. (G) Legal name, address and telephone number of any consultant(s)or engineer(s)retained by the permittee to prepare the registration and Stormwater Pollution Control Plan. (H) Location address or description of the site for which the re-registration is filed. (I) Indication of the normal working hours of the site. (J) The estimated duration of the construction activity. (K) The signature of the registrant and of the individual or individuals responsible for actually preparing the re-registration, each of who shall certify in writing as follows: "I hereby certify that I am making this certification in connection with a registration under the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, submitted to the commissioner by [INSERT NAME OF REGISTRANT] for an activity located at [INSERT ADDRESS OF PROJECT OR ACTIVITY] and that all terms and conditions of the general permit are being met for all discharges which have been initiated and such activity is eligible for authorization under such permit. I further certify that all designs and plans for such activity meet the current terms and conditions of the general permit in accordance with Section 5(b)(5)(C) of such general permit and that a system is in place to ensure that all terms and conditions of this general permit will continue to be met for all discharges authorized by this general permit at the site. I certify that the registration filed pursuant to this general permit is on complete and accurate forms as prescribed by the commissioner without alteration of their text. I certify that I have personally examined and am familiar with the information that provides the basis for this certification,including but not limited to all information described in Section BMMCA Rev.8/21/13 DEEP-WPED-GP-015 22 of 45 3(b)(8)(A) of such general permit, and I certify,based on reasonable investigation, including my inquiry of those individuals responsible for obtaining such information,that the information upon which this certification is based is true, accurate and complete to the best of my knowledge and belief. I also understand that knowingly making any false statement made in the submitted information and in this certification may be punishable as a criminal offense,including the possibility of fine and imprisonment,under section 53a-157b of the Connecticut General Statutes and any other applicable law." If the registrant is not capable of submitting electronically, a paper form may be submitted in accordance with Section 4(a). (d) Where to File a Registration A registration(available at: www.ct.gov/deep/stormwater shall be filed electronically with the commissioner in accordance with Section 3(c)(2)or(3). If the registrant does not have the capability to submit electronically, a paper registration may be filed at the following address: CENTRAL PERMIT PROCESSING UNIT DEPARTMENT OF ENERGY&ENVIRONMENTAL PROTECTION 79 ELM STREET HARTFORD, CT 06106-5127 (e) Availability of Registration and Plan By the fifteenth(15`h)day of each month,the commissioner shall post on the DEEP website a list of registrations submitted in the previous month. (1) Registration Availability On or before fifteen(15)days from the date of posting by the commissioner,members of the public may review and comment on a registration. Any electronically available Plans will be posted with the corresponding registration. (2) Plan Availability (A) Electronic Plan Availability For an electronically available Plan,on or before fifteen(15) days from the date of posting by the commissioner,members of the public may review and comment on a registrant's Plan. (B) Non-Electronic Plan Availability For any Plan that is not electronically available,on or before fifteen(15)days from the date of a registration posting by the commissioner,members of the public may submit a written request to the commissioner to obtain a copy of a registrant's Plan. The commissioner shall inform the registrant of the request and the name of the requesting party. If the commissioner does not already have access to a copy of the requested Plan,the registrant shall submit a copy of their Plan to the commissioner within seven(7)days of their receipt of such request. On or before fifteen(15)days from the date the commissioner makes a Plan available to the requesting party,they may submit written comments on the Plan to the commissioner. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 23 of 45 ( Additional Information The commissioner may require a permittee to submit additional information that the commissioner reasonably deems necessary to evaluate the consistency of the subject construction activity with the requirements for authorization under this general permit. (g) Additional Notification For discharges authorized by this general permit to a regulated municipal separate storm sewer system, a copy of the registration and all attachments thereto shall also be submitted to the owner and operator of that system. For discharges authorized by this general permit to a DOT separate storm sewer system, a copy of the registration and all attachments thereto shall also be submitted to the DOT upon request. For discharges within a public drinking water supply watershed or aquifer area,a copy of the registration and the Plan described in subsection 5(b)of this general permit shall be submitted to the water company. For discharges to river components and tributaries which have been designated as Wild and Scenic under the Wild and Scenic Rivers Act, a copy of the registration and the Plan described in 5(b)of this general permit shall be submitted to the applicable Wild and Scenic Coordinating Committee. Please refer to Appendix H for additional guidance In addition, a copy of this registration and the Plan shall be available upon request to the local inland wetlands agency established pursuant to section 22a-42 of the Connecticut General Statutes, or its duly authorized agent. (h) Action by Commissioner (1) The commissioner may reject without prejudice a registration if it does not satisfy the requirements of the"Contents of Registration" section(subsection 4(c))of this general permit. Any registration refiled after such a rejection shall be accompanied by the fee specified in the "Fees"subsection(subsection 4(c)(1))of this general permit. (2) The commissioner may disapprove a registration if is inconsistent with the requirements for authorization under the"Requirements for Registration"section(Section 3(b))of this general permit,or for any other reason provided by law. (3) Disapproval of a registration under this subsection shall constitute notice to the registrant that the subject construction activity must be authorized under an individual permit. (4) Rejection or disapproval of a registration shall be in writing. (i) Transition to New General Permit On or after August 1,2013,up until and including August 31, 2013, a person filing a new registration for a site may file such registration: (a)under the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities that expires on September 30,2013; or(b)this general permit. A person filing a new registration for a site shall not register under both the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities that expires on September 30, 2013 and this general permit. After August 31,2013,a person filing a new registration for a site shall only register under this general permit and shall be authorized pursuant to Section 3(g)of this general permit. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 24 of 45 (Note: Any person who,on or after August 1,2013,up until and including August 31,2013,files a new registration for a site under the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities that expires on September 30,2013 shall, after October 1, 2013,re-register such site pursuant to Section 3(c)(3)and Section 4(c)(3)of this general permit.) A person re-registering a site pursuant to Section 3(c)(3) and Section 4(c)(3)of this general permit may submit the required re-registration information anytime on or after August 1,2013. (j) Latest Date to Submit a Registration Under this General Permit No person shall submit a registration under this general permit after June 30,2018. Section 5. Conditions of this General Permit The permittee shall meet all requirements of this general permit at all times. In addition, a permittee shall be responsible for conducting authorized construction activities in accordance with the following conditions: (a) Conditions Applicable to Certain Discharges (1) Structures and Dredging in Coastal and Tidal Areas Any person who or municipality that discharges stormwater into coastal tidal waters for which a permit is required under section 22a-361 of the Connecticut General Statutes(structures and dredging)or section 22a-32 of the Connecticut General Statutes(Tidal Wetlands Act), shall obtain such permit(s)from the commissioner.A tidal wetland permit is required for the placement of any sediment upon a tidal wetland,whether it is deposited directly or indirectly. (2) Discharges to Tidal Wetlands Any site which has a post-construction stormwater discharge to a tidal wetland(that is not a fresh-tidal wetland)where such discharge is within 500 feet of the tidal wetland, shall discharge such stormwater through a system designed to retain and infiltrate the volume of stormwater runoff generated by 1 inch of rainfall on the site. If there are site constraints that would prevent retention of this volume on-site(e.g.,brownfields,capped landfills,bedrock, elevated groundwater, etc.), documentation must be submitted, for the commissioner's review and written approval,which explains the site limitations and offers an alternative retention volume. In such cases,the portion of 1 inch that cannot be retained must be provided with additional stormwater treatment so as to protect water quality. Any such treatment shall be designed,installed and maintained in accordance with the Stormwater Quality Manual. For sites unable to comply with this section,the commissioner, at the commissioner's sole discretion,may require the submission of an individual permit in lieu of authorization under this general permit. (3) Toxicity to Aquatic and Marine Life The discharge shall not cause pollution due to acute or chronic toxicity to aquatic and marine life, impair the biological integrity of aquatic or marine ecosystems, or result in an unacceptable risk to human health. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 25 of 45 (4) Water Quality Standards The stormwater discharge shall not cause or contribute to an exceedance of the applicable Water Quality Standards in the receiving water. (5) High Quality Waters Any new or increased stormwater discharge to high quality waters shall be discharged in accordance with the Connecticut Anti-Degradation Implementation Policy in the Water Quality Standards. (b) Stormwater Pollution Control Plan All registrants shall develop and maintain on-site a Stormwater Pollution Control Plan(Plan)for the construction activity authorized by this general permit. Once the construction activity begins,the permittee shall perform all actions required by such Plan and shall maintain compliance with the Plan thereafter. The Plan shall be designed to minimize(as defined in Section 2): (1)pollution caused by soil erosion and sedimentation during and after construction; and(2)stormwater pollution caused by use of the site after construction is completed. (1) Development and Contents of Plan (A) The Plan shall consist of site plan drawings and a narrative. The Plan shall be prepared in accordance with sound engineering practices,and shall be consistent with the Guidelines and the 2004 Connecticut Stormwater Quality Manual(available at http://www.ct.gov/deep/stormwater). The Plan shall also be consistent with any remedial action plan, closure plan or other plan required by any other DEEP permit. (B) The Plan shall include, at a minimum,the following items: (1) Site Plan Site drawings indicating drainage patterns and approximate slopes anticipated after major grading activities,areas of soil disturbance,the location of major structural and non-structural controls(as specified in subsection 5(b)(2),below),the location of areas where stabilization practices are expected to occur,areas which will be vegetated following construction,monitored outfalls, surface waters,impaired waters(identifying those with and without a TMDL),high quality waters,inland wetlands,tidal wetlands, fresh-tidal wetlands, and locations where stormwater will be discharged to a surface water(both during and post-construction); (11) Site Description (a) A narrative description of the nature of the construction activity; (b) An estimate of the total area of the site and the total area of the site that is expected to be disturbed by construction activities; (c) An estimate of the average runoff coefficient of the site after construction activities are completed; (d) The name of the immediate receiving water(s)and the ultimate receiving water(s) of the discharges authorized by this general permit; and BMMCA Rev.8/21/13 DEEP-WPED-GP-015 26 of 45 (e) Extent of wetland acreage on the site. (III) Construction Sequencing The Plan shall clearly identify the expected sequence of major construction activities on the site and corresponding erosion and sediment controls and shall include an estimated timetable for all construction activities,which shall be revised as necessary to keep the Plan current.Wherever possible,the site shall be phased to avoid the disturbance of over five acres at one time(or a lesser area of disturbance as required in the"Impaired Waters"section(Section 5(b)(3)). The Plan shall clearly show the limits of disturbance for the entire construction activity and for each phase. (iv) Control Measures The Plan shall include a description,in narrative and on the site plan drawings, of appropriate control measures that will be performed at the site to minimize the discharge of pollutants to waters of the state. Control measures shall be implemented in accordance with Section 5(b)(2)below. In addition,the following information shall be provided: (a) Calculations supporting the design of sediment and floatables removal controls pursuant to Section 5(b)(2)(C)(ii)(b). (b) Calculations supporting the design of velocity dissipation controls pursuant to Section 5(b)(2)(C)(ii)(c). (v) Runoff Reduction and Low Impact Development(LID)Information Where runoff reduction practices and/or LID measures are utilized,the following information shall be included in the site plan and narrative: (a) The location of the site's streams, floodplains, all wetlands,riparian buffers, slopes 3:1 and steeper, and vegetation identified for preservation and non- disturbance during construction such as forested areas,hay fields,and old fields; (b) Natural drainage patterns, swales,and other drainage ways,that are not streams, floodplains, or wetland areas; (c) The location of all areas with soils suitable for infiltration' and areas of the site best suited for infiltration for the siting of runoff reduction practices and LID design measures; (d) The location of all areas unsuitable or least suitable for infiltration for the siting of areas of development/building; (e) The location of all post-construction stormwater management measures,runoff reduction practices and LID design measures developed pursuant to subsection 5(b)(2)(C)(1)below; (f) Identification of areas inappropriate for the infiltration of stormwater runoff from land uses with a significant potential for groundwater pollution; 1 Infiltration rates must be measured by a field permeability test. The measured field design infiltration rate is equal to one-half the field-measured infiltration rate. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 27 of 45 (g) A narrative describing the nature,purpose, implementation and long-term maintenance of the post-construction measures,runoff reduction practices and LID design measures; (h) Calculations, for measures developed pursuant to Section 5(b)(2)(C)(1), illustrating the retention of the water quality volume or half the water quality volume for the site,as applicable, including a discussion of the impact of any runoff reduction and/or LID practices on these calculations. (i) A narrative describing any site constraints that prevent retention of the appropriate volume specified in Section 5(b)(2)(C)(1)including: an explanation of the site limitations; a description of the runoff reduction practices implemented; an explanation of why the amount retained constitutes the maximum extent achievable; an alternative retention volume; and a description of the measures used to provide additional stormwater treatment for sediment, floatables and nutrients above the alternate volume up to the water quality volume. (j) Calculations showing the proposed effective impervious cover for the site and, where necessary or appropriate for measures developed for linear projects pursuant to Section 5(b)(2)(C)(i), each outfall drainage area. (vi) Inspections The Plan shall include a narrative of all inspection personnel conducting the routine inspections,their responsibilities and procedures pursuant to subsection 5(b)(4)(B) below. The Plan shall also include documentation of the qualifications of the inspector(s)and the findings, actions and results of all inspections conducted at the site. (vii) Monitoring The Plan shall provide a narrative of the stormwater monitoring procedures pursuant to Section 5(c). This narrative shall include documentation of the monitoring frequency, personnel conducting monitorimg, identification of monitored outfalls, methodology for monitoring,provisions for monitoring a linear project(if applicable),the site's normal working hours,the method for measuring turbidity and a copy of all monitoring records. (viii) Contractors (a) The Plan shall clearly identify each contractor and subcontractor that will perform construction activities on the site that have the potential to cause pollution of the waters of the State. The Plan shall include a copy of the certification statement in the"Contractor Certification Statement"section,below, signed by each such contractor and subcontractor. (b) Contractor Certification Statement The Plan shall include the following certification signed by each contractor and subcontractor identified in the Plan as described above: "I certify under penalty of the law that I have read and understand the terms and conditions of the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities. I understand that as a contractor or BMMCA Rev.8/21/13 DEEP-WPED-GP-015 28 of 45 subcontractor at the site,I am authorized by this general permit, and must comply with the terms and conditions of this general permit,including,but not limited to, the requirements of the Stormwater Pollution Control Plan prepared for the site." The certification shall include the name and title of the person providing the signature;the name, address and telephone number of the contracting firm;the address(or other identifying description)of the site; and the date the certification is made. (c) Subdivisions Where individual lots in a subdivision or other common plan of development are conveyed or otherwise the responsibility of another person or municipality,those individual lot contractors shall be required to comply with the provisions of this general permit and the Stormwater Pollution Control Plan, and shall sign the certification statement in the"Contractor Certification Statement"section, above, regardless of lot size or disturbed area. In such cases,the permittee shall provide a copy of the Plan to each individual lot contractor,obtain signed certifications from such contractors and retain all signed certifications in the Plan. (ix) Impaired Waters For construction activities that discharge to impaired waters, as specified in"New Discharges to Impaired Waters"(Section 3(b)(12)),the Plan shall include a description of the provisions for controlling the construction and post-construction stormwater discharges to these waters pursuant to subsection 5(b)(3)below. (2) Stormwater Control Measures Control Measures are required Best Management Practices(BMPs)that the permittee must implement to minimize the discharge of pollutants from the permitted activity. The term "minimize"means reduce and/or eliminate to the extent achievable using control measures that are technologically available and economically practicable and achievable in light of best industry practice. Control Measures shall be designed in accordance with the Guidelines,the Stormwater Quality Manual or the DOT Qualified Products List (http://www.ct.gov/dot/lib/dot/documents/dresearch/conndot_gpl.pdf). Use of controls to comply with the"Erosion and Sediment Controls"section(subsection(A)below)of this general permit that are not included in those resources must be approved by the commissioner or the commissioner's designated agent. The narrative and drawings of controls shall address the following minimum components: (A) Erosion and Sediment Controls (i) Soil Stabilization and Protection The Plan shall include a narrative and drawings of interim and permanent soil stabilization practices for managing disturbed areas and soil stockpiles,including a schedule for implementing the practices.The Permittee shall ensure that existing vegetation is preserved to the maximum extent practicable and that disturbed portions of the site are minimized and stabilized. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 29 of 45 Where construction activities have permanently ceased or when final grades are reached in any portion of the site, stabilization and protection practices as specified in Chapter 5 of the Guidelines or as approved by the commissioner or his/her designated agent shall be implemented within seven days. Areas that will remain disturbed but inactive for at least thirty days shall receive temporary seeding or soil protection within seven days in accordance with the Guidelines. Areas that will remain disturbed beyond the seeding season as identified in the Guidelines, shall receive long-term,non-vegetative stabilization and protection sufficient to protect the site through the winter. In all cases, stabilization and protection measures shall be implemented as soon as possible in accordance with the Guidelines or as approved by the commissioner or his/her designated agent. A reverse slope bench is required for any slope steeper than 3:1 (horizontal: vertical) that exceeds 15 feet vertically, except when engineered slope stabilization structures or measures are included or a detailed soil mechanics analysis has been conducted to verify stability. Engineered analyses and measures must be designed by a CT licensed Professional Engineer with experience in geotechnical engineering or soil mechanics. (ii) Structural Measures The Plan shall include a narrative and drawings of structural measures to divert flows away from exposed soils, store flows or otherwise limit runoff and minimize the discharge of pollutants from the site. Unless otherwise specifically approved in writing by the commissioner or his/her designated agent,or if otherwise authorized by another state or federal permit, structural measures shall be installed on upland soils. For points of discharge from disturbed sites with a total contributing drainage area of between two to five acres,a temporary sediment trap must be installed in accordance with the Guidelines. For points of discharge from disturbed sites with a total contributing drainage area greater than five acres, a temporary basin must be designed and installed in accordance with the Guidelines. Such trap(s)or basin(s)must be maintained until final stabilization of the contributing area as defined in"Notice of Termination"(Section 6(a)). The requirement for sediment traps or basins shall not apply to flows from off-site areas and flows from the site that are either undisturbed or have undergone final stabilization where such flows are diverted around the temporary sediment trap or basin. Any exceptions must be approved in writing by the commissioner or his/her designated agent. (iii) Maintenance The Plan shall include a narrative of the procedures to maintain in good and effective operating conditions all erosion and sediment control measures,including vegetation, and all other protective measures identified in the site plan. Maintenance of all erosion and sediment controls shall be performed in accordance with the Guidelines, or more frequently as necessary,to protect the waters of the state from pollution. (B) Dewatering Wastewaters Dewatering wastewaters shall be managed in accordance with the Guidelines. Dewatering wastewaters discharged to surface waters shall be discharged in a manner that minimizes the discoloration of the receiving waters. The Plan shall include a narrative and drawings of the BMMCA Rev.8/21/13 DEEP-WPED-GP-015 30 of 45 operational and structural measures that will be used to ensure that all dewatering wastewaters will not cause scouring or erosion or contain suspended solids in amounts that could reasonably be expected to cause pollution of surface waters of the State. Unless otherwise specifically approved in writing by the commissioner or his/her designated agent, or if otherwise authorized by another state or federal permit, dewatering measures shall be installed on upland soils. No discharge of dewatering wastewater(s) shall contain or cause a visible oil sheen, floating solids, or foaming in the receiving water. (C) Post-Construction Stormwater Management The Plan shall include a narrative and drawings of measures that will be installed during the construction process to minimize the discharge of pollutants in stormwater discharges that will occur after construction operations have been completed. Post-construction stormwater management measures shall be designed and implemented in accordance with the Stormwater Quality Manual,the DOT Qualified Products List or as approved by the commissioner or his/her designated agent in writing. Unless otherwise specifically provided by the commissioner in writing, or authorized by another state or federal permit, structural measures shall be placed on upland soils. The Plan shall include provisions to address the long-term maintenance of any post-construction stormwater management measure installed. (i) Post-Construction Performance Standards The permittee shall utilize runoff reduction practices(as defined in Section 2)to meet runoff volume requirements based on the conditions below. For sites unable to comply with these conditions,the commissioner,at the commissioner's sole discretion,may require the submission of an individual permit in lieu of authorization under this general permit. (a) Redevelopment For sites that are currently developed with an effective impervious cover of forty percent or more and for which the permittee is proposing redevelopment,the permittee shall design the site in such a manner as to retain on-site half the water quality volume(as defined in Section 2)for the site and provide additional stormwater treatment without retention for discharges up to the full water quality volume for sediment,floatables and nutrients to the maximum extent achievable using control measures that are technologically available and economically practicable and achievable in light of best industry practice. In cases where the permittee is not able to retain half the water quality volume,the permittee shall design the redevelopment to retain runoff volume to the maximum extent achievable using control measures that are technologically available and economically practicable and achievable in light of best industry practice. In such cases, additional stormwater treatment up to the full water quality volume is still required. Any such treatment shall be designed, installed and maintained in accordance with the Stormwater Quality Manual. If retention of the half the water quality volume is not achieved,the permittee shall submit a report to the commissioner describing: the measures taken to maximize runoff reduction practices on the site;the reasons why those practices constitute the maximum extent achievable;the alternative retention volume; and a description of the measures used to provide additional stormwater treatment above the alternate volume up to the water quality volume. In the case of linear redevelopment projects(e.g.roadway reconstruction or widening) for the developed portion of nmmcA Rev.8/21/13 DEEP-WPED-GP-015 31 of 45 the right of way: (1)for projects that may be unable to comply with the full retention standard,the alternate retention and treatment provisions may also be applied as specified above,or(2)for projects that will not increase the effective impervious cover within a given watershed,the permittee shall implement the additional stormwater treatment measures referenced above,but will not be required to retain half of the water quality volume. (b) Other Development The following performance standard applies to all sites that are currently undeveloped or are currently developed with less than forty percent effective impervious cover. For these sites,the permittee shall design the site to retain the water quality volume for the site. If there are site constraints that would prevent retention of this volume on-site(e.g.,brownfields, capped landfills,bedrock, elevated groundwater, etc.),documentation must be submitted, for the commissioner's review and written approval,which: explains the site limitations; provides a description of the runoff reduction practices implemented;provides an explanation of why this constitutes the maximum extent achievable; offers an alternative retention volume; and provides a description of the measures used to provide additional stormwater treatment for sediment,floatables and nutrients above the alternate volume up to the water quality volume. Any such treatment shall be designed, installed and maintained in accordance with the Stormwater Quality Manual. In the case of linear projects that do not involve impervious surfaces(e.g. electrical transmission rights-of-way or natural gas pipelines), retention of the water quality volume is not required as long as the post- development runoff characteristics do not differ significantly from pre- development conditions. (ii) Post-Construction Control Measures (a) Runoff Reduction and Low Impact Development("LID")Practices The site design shall incorporate runoff reduction practices, low impact development("LID")practices or other measures to meet the performance standards in subsection(i)above,promote groundwater recharge and minimize post-construction impacts to water quality. Please refer to Appendix B for additional guidance information. (b) Suspended Solids and Floatables Removal The permittee shall install post-construction stormwater management measures designed to minimize the discharge of suspended solids and floatables(e.g. oil and grease, other floatable liquids,floatable solids,trash,etc.) from stormwater.A goal of 80 percent removal of the annual sediment load from the stormwater discharge shall be used in designing and installing stormwater management measures. The Plan shall provide calculations supporting the capability of such measures in achieving this goal and any third-party verification, as applicable, of the sediment removal efficiencies of such measures. This goal is not intended to limit local approval authorities from requiring a higher standard pursuant to local requirements. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 32 of 45 (c) Velocity Dissipation Velocity dissipation devices shall be placed at discharge locations and along the length of any outfall channel as necessary to provide a non-erosive velocity flow to the receiving watercourse so that the natural physical and biological characteristics and functions are maintained and protected. (D) Other Controls The following additional controls shall be implemented: (1) Waste Disposal: Best management practices shall be implemented to minimize the discharge of litter,debris,building materials,hardened concrete waste, or similar materials to waters of the State. A narrative of these practices shall be provided in the Plan. (ii) Washout Areas Washout of applicators, containers,vehicles and equipment for concrete,paint and other materials shall be conducted in a designated washout area. There shall be no surface discharge of washout wastewaters from this area. Such washout shall be conducted: (1)outside of any buffers and at least 50 feet from any stream,wetland or other sensitive resource; or(2)in an entirely self-contained washout system. The permittee shall clearly flag off and designate areas to be used for washing and conduct such activities only in these areas. The permittee shall direct all washwater into a container or pit designed such that no overflows can occur during rainfall or after snowmelt. In addition, dumping of liquid wastes in storm sewers is prohibited. The permittee shall remove and dispose of hardened concrete waste consistent with practices developed for the"Waste Disposal"section(subparagraph 5(b)(2)(D)(i), above). At least once per week,the permittee must inspect any containers or pits used for washout to ensure structural integrity, adequate holding capacity, and to check for leaks or overflows. If there are signs of leaks,holes or overflows in the containers or pits that could lead to a discharge,the permittee shall repair them prior to further use. For concrete washout areas,the permittee shall remove hardened concrete waste whenever the hardened concrete has accumulated to a height of/z of the container or pit or as necessary to avoid overflows. A narrative of maintenance procedures and a record of maintenance and inspections shall be included in the Plan. (III) Off-site vehicle tracking of sediments and the generation of dust shall be minimized. Wet dust suppression shall be used, in accordance with section 22a-174-18(b) of the Connecticut General Statutes, for any construction activity that causes airborne particulates. The volume of water sprayed for controlling dust shall be minimized so as to prevent the runoff of water.No discharge of dust control water shall contain or cause a visible oil sheen, floating solids, visible discoloration, or foaming in the receiving stream. (iv) All post-construction stormwater structures shall be cleaned of construction sediment and any remaining silt fence shall be removed upon stabilization of the site. (v) All chemical and petroleum product containers stored on the site(excluding those contained within vehicles and equipment) shall be provided with impermeable containment which will hold at least 110%of the volume of the largest container,or BMMCA Rev.8/21/13 DEEP-WPED-GP-015 33 of 45 10% of the total volume of all containers in the area,whichever is larger,without overflow from the containment area.All chemicals and their containers shall be stored under a roofed area except for those chemicals stored in containers of 100 gallon capacity or more, in which case a roof is not required.Double-walled tanks satisfy this requirement. (3) Additional Control Measures for Impaired Waters For construction activities that discharge directly to impaired waters, as specified in"New Discharges to Impaired Waters"(Section 3(b)(12)),the Plan shall include the following provisions: (A) In lieu of the provisions of"Construction Sequencing"(Section 5(b)(1)(13)(111)),no more than 3 acres may be disturbed at any one time. For those areas for which construction activity will be temporarily suspended for a period of greater than 14 days,temporary stabilization measures shall be implemented within 3 days of such suspension of activity. For all areas,permanent stabilization shall be implemented within 30 days of disturbance;or (B) The Plan shall document that measures are in place to ensure that there will be no discharge to the impaired water from rain events up to a 2-year,24-hour rain event while construction activity is occurring; or (C) For discharges to impaired waters with an established TMDL: (i) the Plan shall document that there is sufficient remaining Waste Load Allocation (WLA)in the TMDL to allow the discharge, and (ii) measures shall be implemented to ensure the WLA will not be exceeded, and (iii) stormwater discharges shall be monitored,if applicable, for any indicator pollutant identified in the TMDL for every rain event that produces a discharge to ensure compliance with the WLA. Such monitoring shall be in addition to the requirements specified in Section 5(c),or (iv) the specific requirements for stormwater discharges specified in the TMDL are met. Construction activities discharging to impaired waters that do not comply with this subsection are not authorized by this general permit. (4) Inspections All construction activities submitting a registration for this general permit shall be inspected initially for Plan implementation and then weekly for routine inspections. (A) Plan Implementation Inspections Within the first 30 days following commencement of the construction activity on the site, the permittee shall contact: (1)the appropriate District;or(2) a qualified soil erosion and sediment control professional or a qualified professional engineer to inspect the site. The site shall be inspected at least once and no more than three times during the first 90 days to confirm compliance with the general permit and proper initial implementation of all controls measures designated in the Plan for the site for the initial phase of construction. For sites not inspected by District personnel,the following conditions shall apply: BMMCA Rev.8/21/13 DEEP-WPED-GP-015 34 of 45 (i) for projects disturbing more than one acre and less than fifteen(15) acres, the inspector shall be someone who: (a) is not an employee, as defined by the Internal Revenue Service in the Internal Revenue Code of 1986,of the registrant, and (b) has no ownership interest of any kind in the project for which the registration is being submitted. (11) for projects disturbing fifteen(15)acres or more,the inspector shall be someone who: (a) is not an employee, as defined by the Internal Revenue Service in the Internal Revenue Code of 1986,of the registrant, and (b) has not engaged in any activities associated with the preparation,planning, designing or engineering of such plan for soil erosion and sediment control or plan for engineered stormwater management systems on behalf of such registrant, and (c) is not under the same employ as any person who engaged in any activities associated with the preparation,planning, designing or engineering of such plans and specifications for soil erosion and sediment control or plans and specifications for engineered stormwater management systems on behalf of such registrant,and (d) has no ownership interest of any kind in the project for which the registration is being submitted. The permittee may use, if they wish,the same person(s)that provided the Plan Review Certification pursuant to Section 5(b)(11). (B) Routine Inspections The permittee shall routinely inspect the site for compliance with the general permit and the Plan for the site until a Notice of Termination has been submitted. Inspection procedures for these routine inspections shall be addressed and implemented in the following manner: (i) The permittee shall maintain a rain gauge on-site to document rainfall amounts. At least once a week and within 24 hours of the end of a storm that generates a discharge, a qualified inspector(provided by the permittee), as defined in the"Definitions" section(Section 2)of this general permit, shall inspect, at a minimum,the following: disturbed areas of the construction activity that have not been finally stabilized; all erosion and sedimentation control measures; all structural control measures; soil stockpile areas; washout areas and locations where vehicles enter or exit the site. These areas shall be inspected for evidence of,or the potential for,pollutants entering the drainage system and impacts to the receiving waters. Locations where vehicles enter or exit the site shall also be inspected for evidence of off-site sediment tracking. For storms that end on a weekend,holiday or other time after which normal working hours will not commence within 24 hours, an inspection is required within 24 hours only for storms that equal or exceed 0.5 inches. For storms of less than 0.5 inches, an inspection shall occur immediately upon the start of the subsequent normal working hours. Where sites have been temporarily or finally stabilized, such inspection shall be conducted at least once every month for three months. (ii) The qualified inspector(s) shall evaluate the effectiveness of erosion and sediment controls, structural controls, stabilization practices, and any other controls implemented BMMCA Rev.8/21/13 DEEP-WPED-GP-015 35 of 45 to prevent pollution and determine if it is necessary to install,maintain, or repair such controls and/or practices to improve the quality of stormwater discharge(s). (iii) A report shall be prepared and retained as part of the Plan. This report shall summarize: the scope of the inspection;name(s)and qualifications of personnel making the inspection;the date(s)of the inspection;weather conditions including precipitation information;major observations relating to erosion and sediment controls and the implementation of the Plan; a description of the stormwater discharge(s)from the site; and any water quality monitoring performed during the inspection. The report shall be signed by the permittee or his/her authorized representative in accordance with the"Certification of Documents" section(subsection 5(i))of this general permit. The report shall include a statement that, in the judgment of the qualified inspector(s) conducting the site inspection,the site is either in compliance or out of compliance with the terms and conditions of the Plan and permit. If the site inspection indicates that the site is out of compliance,the inspection report shall include a summary of the remedial actions required to bring the site back into compliance.Non-engineered corrective actions(as identified in the Guidelines) shall be implemented on site within 24 hours and incorporated into a revised Plan within three(3)calendar days of the date of inspection unless another schedule is specified in the Guidelines. Engineered corrective actions(as identified in the Guidelines) shall be implemented on site within seven(7)days and incorporated into a revised Plan within ten(10)days of the date of inspection,unless another schedule is specified in the Guidelines or is approved by the commissioner. During the period in which any corrective actions are being developed and have not yet been fully implemented,interim measures shall be implemented to minimize the potential for the discharge of pollutants from the site. (iv) Inspectors from the DEEP and the appropriate District may inspect the site for compliance with this general permit at any time construction activities are ongoing and upon completion of construction activities to verify the final stabilization of the site and/or the installation of post-construction stormwater management measures pursuant to Section 6(a). (v) Additional inspections,reports and documentation may also be required to comply with the"Monitoring Requirements"section(Section 5(c)). (5) Keeping Plans Current The Permittee is responsible for keeping their Plan in compliance with this general permit at all times. This may involve any or all of the following: (A) The permittee shall amend the Plan if the actions required by the Plan fail to prevent pollution or fail to otherwise comply with any other provision of this general permit. The Plan shall also be amended whenever there is a change in contractors or subcontractors at the site, or a change in design, construction,operation,or maintenance at the site which has the potential for the discharge of pollutants to the waters of the state and which has not otherwise been addressed in the Plan. (B) The commissioner may notify the permittee at any time that the Plan and/or the site do not meet one or more of the minimum requirements of this general permit. Within 7 days of such notice, or such other time as the commissioner may allow,the permittee shall make the required changes to the Plan and perform all actions required by such revised Plan. Within 15 days of such notice,or such other time as the commissioner may allow,the permittee shall submit to the commissioner a written certification that the requested changes have been BMMCA Rev.8/21/13 DEEP-WPED-GP-015 36 of 45 made and implemented and such other information as the commissioner requires,in accordance with the `Duty to Provide Information"and"Certification of Documents" sections(subsections 5(h)and 5(i))of this general permit. (C) For any stormwater discharges authorized under any previous version of this general permit, the existing Plan shall be updated by February 1,2014, as applicable,in accordance with the "Development and Contents of the Plan"(subsection 5(b)(1)),"Stormwater Control Measures"(subsection 5(b)(2)),"Routine Inspections"(subsection 5(b)(4)(13)),and "Monitoring"(subsection 5(c)) sections of this general permit, except for the post- construction measures in subsection 5(b)(2)(C)(1)(a)&(b)and 5(b)(2)(C)(11)(a). The permittee shall maintain compliance with such Plan thereafter. For previously authorized sites discharging to impaired waters or other sensitive areas,the commissioner may require additional control measures or provide authorization under an individual permit pursuant to Sections 4(h) and 3(i). (6) Failure to Prepare,Maintain or Amend Plan In no event shall failure to complete,maintain or update a Plan, in accordance with the "Development of Contents of the Plan"and"Keeping Plans Current"sections(subsections 5(b)(1)and 5(b)(5))of this general permit,relieve a permittee of responsibility to implement any actions required to protect the waters of the state and to comply with all conditions of the permit. (7) Plan Signature The Plan shall be signed and certified as follows: (A) The Plan shall be signed by the permittee in accordance with the"Certification of Documents" section(subsection 5(i))of this general permit. (B) The Plan shall include certification by all contractors and subcontractors in accordance with the"Contractors" section(subsection 5(b)(1)(B)(viii))of this general permit. (C) The Plan shall include a copy of the certification by a professional engineer or landscape architect made in accordance with Section 3(b)(9)of this general permit. (8) Plan Review Certification For a locally approvable project pursuant to Section 3(c)of this general permit, a copy of the Plan review certification made in accordance with either Section 3(b)(10)or(11) shall be maintained with the Plan. Note that construction activities reviewed and certified pursuant to those sections are still subject to the local erosion and sediment control and stormwater management regulations of the municipality in which the activity is conducted. (9) Plan Submittal The Plan shall be submitted to the commissioner and other certain parties under the following conditions: (A) All Locally Exempt Projects with greater than one acre of soil disturbance shall submit an electronic copy of the Plan and a completed Registration Form to the commissioner. (B) For all other projects,the permittee shall provide a copy of the Plan, and a completed Registration Form for this general permit to the following persons immediately upon request: BMMCA Rev.8/21/13 DEEP-WPED-GP-015 37 of 45 (1) The commissioner at his or her request or at the request of a member of the public during the registration and Plan availability period pursuant to Section 4(e); (ii) The municipal planning commission,zoning commission and/or inland wetlands agency,or its respective enforcement officer or designated agent; (iii) In the case of a stormwater discharge through a municipal separate storm sewer system,the municipal operator of the system; (iv) In the case of a stormwater discharge located within a public drinking water supply watershed or aquifer area,the water company responsible for that water supply. DO NOT SUBMIT any pages or other material that do not pertain to stormwater management or erosion and sedimentation control(such as electrical and lighting plans, boundary or lot surveys,building plans,non-stormwater related detail sheets, etc.). (c) Monitoring Requirements The primary requirements for monitoring turbidity are summarized in the table below: Table 1 Area of Soil Monitoring Monitoring Sample Method Disturbance Required? Frequency Sites which Only IF a Monthly IF a Procedure consistent with 40 disturb 1 acre or Registration is Registration CFR Part 136 more,but less required is required than 5 acres Sites which Yes Monthly Procedure consistent with 40 disturb 5 acres or CFR Part 136 more (1) Turbidity Monitoring Requirements (A) Monitoring Frequency (i) Sampling shall be conducted in accordance with Table 1, above, at least once every month,when there is a discharge of stormwater from the site while construction activity is ongoing,until final stabilization of the drainage area associated with each outfall is achieved. (11) The permittee is only required to take samples during normal working hours as defined in Section 2. The site's normal working hours must be identified in the Plan pursuant to Section 5(b)(1)(B)(vii). If sampling is discontinued due to the end of normal working hours,the permittee shall resume sampling the following morning or the morning of the next working day following a weekend or holiday, as long as the discharge continues. (III) Sampling may be temporarily suspended any time conditions exist that may reasonably pose a threat to the safety of the person taking the sample. Such conditions may include high winds, lightning, impinging wave or tidal activity, intense rainfall or other BMMCA Rev.8/21/13 DEEP-WPED-GP-015 38 of 45 hazardous condition. Once the unsafe condition is no longer present, sampling shall resume. (iv) If there is no stormwater discharge during a month, sampling is not required. (B) Sample Collection (i) All samples shall be collected from discharges resulting from a storm event that occurs at least 24 hours after any previous storm event generating a stormwater discharge. Any sample containing snow or ice melt must be identified on the Stormwater Monitoring Report form. Sampling of snow or ice melt in the absence of a storm event is not a valid sample. (ii) Samples shall be grab samples taken at least three separate times during a storm event and shall be representative of the flow and characteristics of the discharge(s). Samples may be taken manually or by an in-situ turbidity probe or other automatic sampling device equipped to take individual turbidity readings (i.e.not composite). The first sample shall be taken within the first hour of stormwater discharge from the site. In cases where samples are collected manually and the discharge begins outside of normal working hours,the first sample shall be taken at the start of normal working hours. (C) Sampling Locations (i) Sampling is required of all point source discharges of stormwater from disturbed areas except as may be modified for linear projects under subparagraph(ii)below. Where there are two or more discharge points that discharge substantially identical runoff, based on similarities of the exposed soils, slope,and type of stormwater controls used, a sample may be taken from just one of the discharge points. In such case,the permittee shall report that the results also apply to the substantially identical discharge point(s). No more than 5 substantially identical outfalls may be identified for one representative discharge. If such project is planned to continue for more than one year, the permittee shall rotate twice per year the location where samples are taken so that a different discharge point is sampled every six months. The Plan must identify each outfall authorized by this permit and describe the rationale for any substantially identical outfall determinations. (ii) Linear Projects For a linear project, as defined in Section 2,the protocols of subparagraph(i),above, shall apply except that up to 10 substantially identical outfalls may be identified for one representative discharge. (iii) All sampling point(s) shall be identified in the Plan and be clearly marked in the field with a flag, stake, or other visible marker. (D) Sampling and analysis shall be prescribed by 40 CFR Part 136. (E) Turbidity Values The stormwater discharge turbidity value for each sampling point shall be determined by taking the average of the turbidity values of all samples taken at that sampling point during a given storm. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 39 of 45 (2) Stormwater Monitoring Reports (A) Within thirty(30)days following the end of each month,permittees shall enter the stormwater sampling result(s)on the Stormwater Monitoring Report(SMR)form(available at www.ct.gov/deep/storinwater and submit it in accordance with the NetDMR provisions in subsection F,below, or,if the permittee has opted out of NetDMR,to the following address: Bureau of Materials Management and Compliance Assurance Water Permitting and Enforcement Division(Attn: DMR Processing) Connecticut Department of Energy and Environmental Protection 79 Elm Street Hartford,CT 06106-5127 (B) If there was no discharge during any given monitoring period,the permittee shall submit the form as required with the words"no discharge"entered in place of the monitoring results. (C) If the permittee monitors any discharge more frequently than required by this general permit, the results of this monitoring shall be included in additional SMRs for the month in which the samples were collected. (D) If sampling protocols are modified due to the limitations of normal working hours or unsafe conditions in accordance with Section 5(c)(I)(A)(ii)or(iii)above, a description of and reason for the modifications shall be included with the SMR. (E) If the permittee samples a discharge that is representative of two or more substantially identical discharge points,the permittee shall include the names or locations of the other discharge points. (F) NetDMR Reporting Requirements (1) Prior to one-hundred and eighty (180) days after the issuance of this permit, the Permittee may either submit monitoring data and other reports to the Department in hard copy form or electronically using NetDMR, a web-based tool that allows Permittees to electronically submit stormwater monitoring reports through a secure internet connection. Unless otherwise approved in writing by the commissioner, no later than one-hundred and eighty (180) days after the issuance of this permit the Permittee shall begin reporting electronically using NetDMR. Specific requirements regarding subscription to NetDMR and submittal of data and reports in hard copy form and for submittal using NetDMR are described below: (a) Submittal of NetDMR Subscriber Agreement On or before fifteen (15) days after the issuance of this permit, the Permittee and/or the person authorized to sign the Permittee's discharge monitoring reports ("Signatory Authority") as described in RCSA Section 22a-430-3(b)(2) shall contact the Department at deep.netdmr&ct.gov and initiate the NetDMR subscription process for electronic submission of Stormwater Monitoring Report information. Information on NetDMR is available on the Department's website at www.ct. og v/deep/netdmr. On or before ninety (90) days after issuance of this permit the Permittee shall submit a signed and notarized copy of the Connecticut DEEP NetDMR Subscriber Agreement to the Department. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 40 of 45 (b) Submittal of Reports Using NetDMR Unless otherwise approved by the commissioner, on or before one-hundred and eighty (180) days after issuance of this permit, the Permittee and/or the Signatory Authority shall electronically submit SMRs required under this permit to the Department using NetDNM in satisfaction of the SMR submission requirements of Sections 5(c)(2)(A)of this permit. SMRs shall be submitted electronically to the Department no later than the 30th day of the month following the completed reporting period. Any additional monitoring conducted in accordance with 40 CFR 136 shall be submitted to the Department as an electronic attachment to the SMR in NetDMR. Once a Permittee begins submitting reports using NetDMR, it will no longer be required to submit hard copies of SMRs to the Department. NetDMR is accessed from: h!Ltp://www.epa.gov/netdmr. (c) Submittal of NetDMR Opt-Out Requests If the Permittee is able to demonstrate a reasonable basis, such as technical or administrative infeasibility, that precludes the use of NetDMR for electronically submitting SMRs, the commissioner may approve the submission of SMRs in hard copy form("opt-out request"). Opt-out requests must be submitted in writing to the Department for written approval on or before fifteen (15) days prior to the date a Permittee would be required under this permit to begin filing SMRs using NetDMR. This demonstration shall be valid for twelve (12)months from the date of the Department's approval and shall thereupon expire. At such time, SMRs shall be submitted electronically to the Department using NetDMR unless the Permittee submits a renewed opt-out request and such request is approved by the Department. All opt-out requests and requests for the NetDMR subscriber form should be sent to the following address or by email at deep.netdmr@ct.gov: Attn: NetDMR Coordinator Connecticut Department of Energy and Environmental Protection 79 Elm Street Hartford, CT 06106-5127 (d) Reporting and Record Keeping Requirements (1) For a period of at least five years from the date that construction is complete,the permittee shall retain copies of the Plan and all reports required by this general permit, and records of all data used to complete the registration for this general permit,unless the commissioner specifies another time period in writing. Inspection records must be retained as part of the Plan for a period of five(5)years after the date of inspection. (2) The permittee shall retain an updated copy of the Plan required by this general permit at the construction site from the date construction is initiated at the site until the date construction at the site is completed. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 41 of 45 (e) Regulations of Connecticut State Agencies Incorporated into this General Permit The permittee shall comply with sections 22a-430-3 and 22a-430-4 of the Regulations of Connecticut State Agencies which are hereby incorporated into this general permit,as if fully set forth herein. (� Reliance on Registration In evaluating the registrant's registration,the commissioner has relied on information provided by the registrant. If such information proves to be false or incomplete, any authorization reliant on such information may be suspended or revoked in accordance with law, and the commissioner may take any other legal action provided by law. (g) Duty to Correct and Report Violations Upon learning of a violation of a condition of this general permit,unless otherwise specified in this general permit, a permittee shall immediately take all reasonable action to determine the cause of such violation, correct and mitigate the results of such violation,prevent further such violation,and report in writing such violation and such corrective action to the commissioner within five(5)days of the permittee's learning of such violation. Such information shall be filed in accordance with the "Certification of Documents"section(Section 5(i))of this general permit. (h) Duty to Provide Information If the commissioner requests any information pertinent to the construction activity or to compliance with this general permit or with the permittee's authorization under this general permit,the permittee shall provide such information within fifteen(15) days of such request or other time period as may be specified in writing by the commissioner. Such information shall be filed in accordance with the "Certification of Documents"section(Section 5(i))of this general permit. (i) Certification of Documents Unless otherwise specified in this general permit, any document,including but not limited to any notice,information or report,which is submitted to the commissioner under this general permit shall be signed by the permittee,or a duly authorized representative of the permittee,and by the individual or individuals responsible for actually preparing such document, each of whom shall certify in writing as follows: "I have personally examined and am familiar with the information submitted in this document and all attachments thereto, and I certify that,based on reasonable investigation,including my inquiry of those individuals responsible for obtaining the information,the submitted information is true, accurate and complete to the best of my knowledge and belief. I understand that a false statement made in this document or its attachments may be punishable as a criminal offense,in accordance with section 22a-6 of the Connecticut General Statutes,pursuant to section 53a-157b of the Connecticut General Statutes, and in accordance with any other applicable statute." 0) Date of Filing For purposes of this general permit,the date of filing with the commissioner of any document is the date such document is received by the commissioner. The word"day" as used in this general permit means the calendar day; if any date specified in the general permit falls on a Saturday, Sunday, or legal holiday, such deadline shall be the next business day thereafter. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 42 of 45 (k) False Statements Any false statement in any information submitted pursuant to this general permit may be punishable as a criminal offense,in accordance with section 22a-6 of the Connecticut General Statutes,pursuant to section 53a-157b of the Connecticut General Statutes. (l) Correction of Inaccuracies Within fifteen(15)days after the date a permittee becomes aware of a change in any information in any material submitted pursuant to this general permit, or becomes aware that any such information is inaccurate or misleading or that any relevant information has been omitted, such permittee shall correct the inaccurate or misleading information or supply the omitted information in writing to the commissioner. Such information shall be filed in accordance with the certification requirements prescribed in Section 5(i)of this general permit. (m) Transfer of Authorization Any authorization issued by the commissioner under this general permit is transferable only in accordance with the provisions of section 22a-6o of the General Statutes. Any person or municipality proposing to transfer any such authorization shall submit a license transfer form to the commissioner. The transferee is not authorized to conduct any activities under this general permit until the transfer is approved by the commissioner(typically 30 days). The transferee may adopt by reference the Plan developed by the transferor. The transferee shall amend the Plan as required by the"Keeping Plans Current" Section 5(b)(5)of this general permit). (n) Reopener At such time as the USEPA may institute a new rule for post-construction stormwater management or modify the requirements for their National Pollutant Discharge Elimination System(NPDES) General Permit for Discharges from Construction Activities(CGP)to institute a numeric Effluent Limitation Guideline(ELG)for turbidity in stormwater discharges from construction activities,the commissioner may reopen this general permit pursuant to the Section 40 Part 122.62(a) of the Code of Federal Regulations for implementation of these elements. (o) Other Applicable Law Nothing in this general permit shall relieve the permittee of the obligation to comply with any other applicable federal, state and local law, including but not limited to the obligation to obtain any other authorizations required by such law. (p) Other Rights This general permit is subject to and does not derogate any present or future rights or powers of the State of Connecticut and conveys no rights in real or personal property nor any exclusive privileges, and is subject to all public and private rights and to any federal, state, and local laws pertinent to the property or construction activity affected by such general permit. In conducting any construction activity authorized hereunder,the permittee may not cause pollution,impairment, or destruction of the air,water, or other natural resources of this state. The issuance of this general permit shall not create any presumption that this general permit should or will be renewed. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 43 of 45 Section 6. Termination Requirements (a) Notice of Termination At the completion of a construction project registered pursuant to the"Registration Requirements" section(Section 4)of this general permit,a Notice of Termination must be filed with the commissioner. A project shall be considered complete after all post-construction measures are installed,cleaned and functioning and the site has been stabilized for at least three months following the cessation of construction activities. A site is considered stabilized when there is no active erosion or sedimentation present and no disturbed areas remain exposed for all phases. (1) Post-Construction Inspection For locally approvable projects,once all post-construction stormwater measures have been installed in accordance with the Post-Construction Stormwater Management section(subsection 5(b)(2)(C))and cleaned of any construction sediment or debris,the registrant shall contact the appropriate Conservation District or a qualified soil erosion and sediment control professional and/or a qualified professional engineer, as appropriate,who will inspect the site to confirm compliance with these post-construction stormwater measures. This person(s) shall not be an employee,as defined by the Internal Revenue Service in the Internal Revenue Code of 1986, of the permittee and shall have no ownership interest of any kind in the project for which the site's registration was submitted. (2) Final Stabilization Inspection For all projects, once the site has been stabilized for at least three months,the registrant shall have the site inspected by a qualified inspector to confirm final stabilization. The registrant shall indicate compliance with this requirement on the Notice of Termination form. (b) Termination Form A termination notice shall be filed on forms prescribed and provided by the commissioner and shall include the following: (1) The permit number as provided to the permittee on the permit certificate. (2) The name of the registrant as reported on the general permit registration form(DEEP-PED-REG- 015). (3) The address of the completed construction site. (4) The dates when: (A) All storm drainage structures were cleaned of construction debris pursuant to the"Other Controls" section(subsection 5(b)(2)(D))of this general permit; and (B) The post-construction inspection was conducted pursuant to subsection 6(a)(1), above; and (C) The date of completion of construction; and (D) The date of the final stabilization inspection pursuant to subsection 6(a)(2), above. (5) A description of the post-construction activities at the site. BMMCA Rev.8/21/13 DEEP-WPED-GP-015 44 of 45 (6) Signatures of: (A) The permittee; and (B) The person certifying the post-construction inspection pursuant to subsection 6(a)(1), above. (c) Wlzere to File a Termination Form A termination form shall be filed with the commissioner at the following address: CENTRAL PERMITS PROCESSING UNIT BUREAU OF MATERIALS MANAGEMENT&COMPLIANCE ASSURANCE DEPARTMENT OF ENERGY&ENVIRONMENTAL PROTECTION 79 ELM STREET HARTFORD, CT 06106-5127 Section 7. Commissioner's Powers (a) Abatement of Violations The commissioner may take any action provided by law to abate a violation of this general permit, including but not limited to penalties of up to $25,000 per violation per day under Chapter 446k of the Connecticut General Statutes, for such violation. The commissioner may,by summary proceedings or otherwise and for any reason provided by law, including violation of this general permit,revolve a permittee's authorization hereunder in accordance with sections 22a-3a-2 through 22a-3a-6, inclusive, of the Regulations of Connecticut State Agencies.Nothing herein shall be construed to affect any remedy available to the commissioner by law. (b) General Permit Revocation,Suspension, or Modification The commissioner may, for any reason provided by law,by summary proceedings or otherwise, revoke or suspend this general permit or modify to establish any appropriate conditions, schedules of compliance, or other provisions which may be necessary to protect human health or the enviromnent. (c) Filing of an Individual Permit Application If the commissioner notifies a permittee in writing that such permittee must obtain an individual permit if he wishes to continue lawfully conducting the construction activity,the permittee shall file an application for an individual permit within thirty(30)days of receiving the commissioner's notice. While such application is pending before the commissioner,the permittee shall continue to comply with the terms and conditions of this general permit.Nothing herein shall affect the commissioner's power to revoke a permittee's authorization under this general permit at any time. Issued: August 21, 2013 Daniel C.Esty - 8�- Commissioner BMMCA Rev.8/21/13 DEEP-WPED-GP-015 45 of 45 STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut APPENDIX C Drainage Report -27- Drainage & Water Quality Design West River Farms 69 Lot Single Family Residential Open Space Subidivision (PRD) Scantic Road, East Windsor, CT July 27, 2015 NARRATIVE: West River Farms, LLC proposes to construct a 69-Lot residential open space subdivision on a 4 1± acre parcel of land which is bisected by the East Windsor/South Windsor town line. The parcel contains approximately 24 acres in East Windsor with access to Scantic Road in East Windsor, Connecticut. The rear of the parcel contains approximately 17 acres in South Windsor bounded to the east by the Scantic River. All 69 of the building lots are located in East Windsor, while all of the South Windsor portion and part of the East Windsor property will be deeded as open space to the DEEP,the respective towns or an approved land trust. The southwest corner of the parcel includes a private roadway known as Schanck Road which serves the abutters southwest of the subject parcel. The proposed development in East Windsor consists of approximately 3,800 feet of new public roadways to be maintained by the Town of East Windsor. The project includes a stormwater collection system for the new roadways and a portion of Scantic Road and Schanck Road. The applicant proposes to construct a wet pond within the open space property in South Windsor. The proposed storm drainage system will be piped to a new wet pond within the open space parcel in South Windsor for stormwater treatment prior to discharge to the Scantic River. An easement in favor of the Town of East Windsor will be provided over Schanck Road to the wet pond for rights to discharge and maintenance of the stormwater system. Drainage System Sizing The proposed storm drainage system was sized for a 10-year storm event. Contributing watershed areas (A)to each catch basin were delineated as shown on the attached Drainage Area Map. Peak flow rates were computed using the Rational Method: Q=A x C x i Runoff Coefficients (C)were taken from Table 6-3 of the CT DOT Drainage Manual(DOT), see attached. The Hartford County Soil Survey identifies the on-site soils as mostly Windsor -1- loamy fine sand and Penwood loamy sand which are classified as type A soils. According to Table 6-3, C values for these soils range from .04 to .18 depending on slope of the topography. We conservatively assumed a constant C of 0.15 for all pervious areas and 0.9 for impervious areas. Rainfall intensity(i) for the 10-year storm event was taken from the DOT Table B-2.1 assuming a duration equal to the Time of Concentration(Tc). The Tc represents the time it takes for runoff to travel from the most remote point in the watershed to the discharge point. The Tc for each subcatchment was determined using methodology recommended by the DOT. Flow paths for the largest subcatchments are also shown on the Drainage Area Map. The TR- 55 method of combining sheet, shallow concentrated, and open channel flow times was considered for determining specific Tc, but the results were highly dependent on the assumed length of sheet flow. This methodology was developed based on research of large drainage areas of 200 acres or more. For small watersheds such as this one, sheet flow areas that comprise more than 80% of Tc may not actually contribute to the subcatchment's peak flow rate. Rather than attempt to exclude the sheet flow areas from the watershed, we conservatively assume minimum Tc for each subcatchment. CT DOT Drainage Manual recommends a minimum Tc of 5 minutes for paved areas and 10 minutes for grassed areas. Travel Time (Tt)between structures was estimated using Manning's Formula assuming pipes flowing full or half full. This is also conservative as the velocities during the Tc development would not yet reach their peak rates. Dividing the length of flow by the velocity produced the Tt. The subcatchment Tc was compared to the upstream combination of Tc +Tt. The larger of the two values was used to computed the design Tc continuing downstream. A summary of this analysis is showing on the attached Pipe Sizing Chart. The results demonstrate that each pipe in the proposed network has a full flow capacity in excess of the 10-year design storm. Gutter Flow Anal Each drainage inlet grate was sized in accordance with Table 11-2 of the DOT Drainage Manual for Local Roads with< 3,000 ADT except that a 10-year design storm was used for non-sag conditions rather than a 5-year storm. Table 11-2 permits an allowable design spread of no more than 1/2 lane width(6.5' assuming no shoulder and up to 8' assuming a 10' lane with 3' shoulder) for non-sag conditions. For sag conditions, Table 11-2 permits a maximum spread of"all except one lane width" (combined left and right spread no more than 13 feet assuming no shoulder and up to 16' assuming a 10' lane with 3' shoulder). To achieve these requirements, some drainage structures were changed to double grates. -2- Using Manning's Formula, the actual gutter flow width(T) can be computed given a known flow rate(Qlo), roughness coefficient(n=0.013 for smooth texture asphalt pavement), longitudinal slope(S) and cross slope (SX 3.125%). The following formula was taken from the DOT Drainage Manual Figure 11-1.1, solving for T: T= [Q x n/(0.56 x SX1.67 X SO.5)(1/2.67) The flow rate (Q)to each grate inlet is a combination of the overland flow within the structure's watershed, and the bypass flow from the upstream structures. The overland flow is determined by Rational Method(A x C x i). A rainfall intensity(i) of 4.8 in/hr was used for watersheds with significant pervious areas, while watersheds of mostly impervious area (>50%)used an intensity of 6.0 in/hr. Once a structure in the chain was identified at the lower intensity, all subsequent downstream structures were also computed by the lower intensity. This methodology is conservative because it neglects travel time along the gutter(since the bypass flow represents only a portion of the total flow to the inlet). Bypass gutter flow is proportional to the cross sectional flow area beyond the grate width(W). The attached Gutter Flow Analysis Chart computes the flow(Q) and width(T) for each structure and demonstrates that the maximum spread requirements are met. CB#4 & CB#5 were excluded because their contributing watershed was assumed to be insignificant. CB#23- 25 were also excluded because they are in existing Scantic Road which has no curbing. Any gutter flow relief(such as when winter snow banks create a berm condition)will be an improvement over existing conditions. For structures in sag condition, equation 11.7 from the DOT Drainage Manual, was used to compute the gutter spread(T) during weir flow conditions (<0.4 ft depth), by dividing the depth(d)by the cross slope (SX): T= [QC"/(CP)]2/3/SX where: Q= flow rate into grate opening(cfs) P =perimeter of grate excluding bar widths and the side against the curb, 5.02 ft. for single grates and 7.33 for double grates C =weir coefficient, 3.0 CFs = factor of safety for clogging, 1.0 with curb inlet SX=cross slope (ft/ft) This analysis required selection of Type II double grate structures at CB#22, 21, 11, 2 and 1. Due to the extent of bypass to CB#2,upstream structures CB#6 & CB#8 were converted to Type I double grates. This reduced the spread at CB#2 to 6.7 feet. Combining this with the spread at CB#1 of 6.3 feet, a full lane width of(26—6.7—6.3) 13 feet is maintained. -3- -4- Wet Pond Sizing The stormwater basin is designed as an in-line wet pond to provide water quality treatment for the project before discharging to a new riprap scour hole along the edge of the Scantic River. The wet pond was designed in accordance with the 2004 Connecticut Stormwater Quality Manual. The required water quality volume (WQV) is computed by the following formula: WQV = (1")(R)(A)/12 where: WQV = water quality volume(ac-ft) R = volumetric runoff coefficient(0.05+0.009(I)) I = percent impervious cover(%) A = watershed area(acres) The drainage area of the wet pond is 28.3 acres with 7.77 acres of impervious surface or 27.5%. However, two portions of this watershed first drain to infiltration areas: 1. Infiltration Basin on Lot 1 This infiltration area has a static storage capacity(excluding infiltration rate) of 4,056 c.f. (see attached HydroCAD table for Pond 1P). With a contributing watershed of 4.9 acres and 12.2% impervious,the WQV for this subwatershed is: WQV=(l)(0.05+0.009(12.2))(4.9)/l2 x 43,560 sf/ac=2,842 c.f. 2. Infiltration areas along north side of Schanck Road This infiltration area has a static storage capacity of 2,704 c.f. (see attached HydroCAD table for Pond 2P). With a contributing watershed of 4.0 acres and 14.1% impervious, the WQV for this subwatershed is: WQV (1)(0.05+0.009(14.1))(4.0)/12 x 43,560 sf/ac=2,569 c.f. Both infiltration areas provide treatment volume greater than the WQV for their respective watersheds, and therefore these watersheds can be excluded from the wet pond sizing. Subtracting these areas produces a net watershed of 19.4 acres with 33.9% impervious coverage. Therefore,the required WQV for the wet pond is: WQV = (1)(0.05+0.009(33.9))(19.4)/12 x 43,560 sf/ac=25,007 c.f. -5- The Wet Pond capacity(Including Forebay) is: Elev. Area(sf) Inc. Vol. (cf) Total Vol. (d) 26.5 2,416 0 0 (bottom) 28 4,855 5,348 5,348 29.5 7,630 9,286 14,634 29.5 10,585 0 14,634 30 11,691 5,567 20,200 30.5 12,729 6,103 26,303 (permanent pool volume) The pond forebay is sized to contain 10% of the WQV plus sediment storage. The annual sediment load was computed multiplying the total area of disturbance within the basin watershed (18.7 acres)times the sediment load rate for construction sites (1 ton/ac/yr): Sed. = 18.7 ac. x 1.0 ton/ac./yr. x 2000 lb/ton/ 85 lb/cf=440 cf/yr The Forebay capacity is: Elev. Area(sfl Inc. Vol. (cf) Total Vol. (co 26.5 861 0 0 (bottom) 28 1,785 1,943 1,943 29.5 2,877 3,464 5,407 (forebay volume) The forebay therefore has the following sediment capacity: 5,407 c.f. —(25,007 c.£ x 10%) =2,906 c.f/440 c.£/yr= 6.6 years Groundwater Recharge The Web Soil survey identifies the on-site soils within the subdivision as predominately Windsor sands with a Hydraulic Soil Group designation of A. These soils are ideal for groundwater recharge. The eastern portion of the site contains wetland soils which are not suitable for infiltration. The Hydraulic Soil Group Approach described in the 2004 DEP Stormwater Quality Manual, the Groundwater Recharge Volume (GRV) for these soils is determined by the following formula: GRV=(D)(A)(I)/12 Where, GRV= Groundwater Recharge Volume (cubic feet) D=Depth of runoff to be recharged(0.4 inches for A soils per Manual Table 7-4) A=Watershed area(square feet) I=Impervious coverage (ft/ft) -6- For the purposes of this analysis, we only considered the impervious area associated with roofs,not driveway and roadways which are not ideal for infiltration due to potential contamination and sediment clogging. Assuming an average roof area of 2,000 s.f.,the GRV per lot would be: GRV=(0.4 in.)(2,000 s.f.)(1 ft/ft)/12 =67 c.f./lot If all roof areas were infiltrated, this would require a GRV of 67 x 69 =4,623 c.f. Phase 1 and a portion of phase 3 will provide groundwater recharge by maintaining low points from lot runoff to collect and infiltrate runoff before it overflows to the infiltration system. This includes lots 1-17 and 56-69. As previously noted, the infiltration area on Lot 1 has a static storage capacity of 4,056 c.f. The infiltration area along Schanck Road has a 2,704 c.f. capacity. Both of these areas exceed the GRV for their respective roof areas. The other 38 lots do not have low points to drain to and therefore subsurface roof infiltration is proposed. Lots 39-49 are not suitable for roof infiltration due to down gradient cut slopes, limited flat areas, and the likelihood of siltier soils with lower permeability rates near the existing wetlands. The two infiltration areas in Phase 1 provide extra recharge volume by infiltrating lawn runoff as well as the roof runoff. This meets the Manual's intent to "recharge volumes to the maximum extent practicable." The remaining 27 lots in phase 2-4 will include subsurface roof infiltration as soils permit. Two StormTech SC-740 chambers will provided a total static storage volume of 45.9 c.f./unit x 2 units= 91.8 c.f. This exceeds the average GRV per lot of 67 c.f. When considering the additional storage of the voids in the surrounding soil and the permeability rate of these A soils, the actual recharge volume from these units is much greater. Permeability testing of the onsite soils during lot development may support a reduction in number or size of recharge chambers required. Note: We did not deduct these roof areas from the above WQV calculations for the Wet Pond since they may not provide full treatment of the 1"WQV storm event. Outlet Protection Outlet velocities to the forebay will be minimized by use of a drop manhole structure. Intermediate riprap is proposed to armor the slope from the outlet to the bottom of the forebay. -7- The discharge point for the wet pond will be armored with a preformed scour hole designed in accordance with the CT DOT Drainage Manual. A scour hole size of 15'xI8'x1.5' was selected from Table 8-8.1 for a 36"pipe. Riprap was sized for a 10-year storm event assuming a conservative tailwater depth of 0.5'. Since the scour hole is in a floodplain, the actual tailwater depth will likely be greater. The results of the riprap sizing are as follows: Q10 = 33.3 cfs Sp=Rp=3' d50 =(0.0125Rp2/TW)(Q10/Rp2.5 1.33 _(0.0125(3)2/0.5)(33.3/(3)2.?)1.33 = 0.62' < 0.67 (int. riprap) Conclusion Due to the proximity of the project to the Scantic River, detention of stormwater is not advisable. Detaining runoff would delay the peak discharge to coincide with peaks from upstream flows,potentially resulting in impacts downstream. Infiltration of roof and lawn runoff will be utilized where soil and topographic conditions permit to encourage recharge and mitigate increases in runoff volume. The proposed wet pond will provide stormwater quality treatment of the WQV and thus is expected to remove at least 80% of total suspended solids (TSS). The proposed outlet is sized to prevent erosion and scour in accordance with the CT DOT Drainage Manual. The proposed drainage system is designed in accordance will accepted engineer practices and in our opinion will not adversely impact downstream properties. -8- GUTTER FLOW ANALYSIS West River Farms Subdivision (PRD) Cross Sectional Bypass Area AC Total Rainfall Flow Rate Long- Roughness Flow Area Sag Grate (BA)= Bypass AC AC to Inlet (ACT)= Intensity (Qio)= itudinal Cross Slope Coefficient Gutter Flow (FA)= Grate Width Perimeter (T-W)Z (BAC)_ Structure (ACI) ACI+BAC (i) ACT x i Slope(S) (SX) (n) Width(T) (T2 x SX)/2 (W) (P) x S,/2 ACT x BA/FA CB16 0.141 0.141 6.0 0.8 5.00% 3.13% 0.013 3.5 0.194 1.35 0.073 0.053 CB8 0.194 0.247 4.8 1.2 3.80% 3.13% 0.013 4.2 0.277 2.71 0.035 0.031 CB6 0.238 0.269 4.8 1.3 1.53% 3.13% 0.013 5.2 0.415 2.71 0.093 0.061 CB3 0.086 0.086 6.0 0.5 1.00% 3.13% 0.013 4.0 0.244 1.35 0.106 0.037 CB2 0.348 0.446 4.8 2.1 3.13% 6.7 7.33 CB9 0.183 0.183 6.0 1.1 3.80% 3.13% 0.013 4.1 0.261 1.35 0.117 0.082 CB7 0.168 0.250 4.8 1.2 3.80% 3.13% 0.013 4.2 0.279 1.35 0.129 0.115 CB1 0.294 0.409 4.8 2.0 3.13% 6.3 7.33 CB19 0.124 0.124 6.0 0.7 3.13% 4.3 5.02 CB18 0.191 0.191 6.0 1.1 3.13% 5.7 5.02 CB22 0.316 0.316 4.8 1.5 3.13% 5.3 7.33 CB21 0.368 0.368 4.8 1.8 3.13% 5.9 7.33 CB32 0.096 0.096 4.8 0.5 2.92% 3.13% 0.013 3.1 0.150 1.35 0.048 0.030 CB31 0.251 0.281 4.8 1.4 5.95% 3.13% 0.013 4.1 0.258 1.35 0.114 0.125 CB29 0.297 0.422 4.8 2.0 5.95% 3.13% 0.013 4.7 0.349 1.35 0.178 0.215 CB27 0.263 0.478 4.8 2.3 2.41% 3.13% 0.013 5.9 0.538 1.35 0.318 0.283 CB30 0.033 0.033 6.0 0.2 2.41% 3.13% 0.013 2.3 0.086 1.35 0.015 0.006 CB28 0.090 0.096 6.0 0.6 2.41% 3.13% 0.013 3.5 0.191 1.35 0.072 0.036 CB26 0.064 0.100 6.0 0.6 2.41% 3.13% 0.013 3.5 0.197 1.35 0.076 0.038 CB20 0.061 0.061 6.0 0.4 3.68% 3.13% 0.013 2.7 0.116 1.35 0.029 0.015 CB17 0.063 0.078 6.0 0.5 6.68% 3.13% 0.013 2.7 0.112 1.35 0.027 0.019 CB15 0.182 0.201 4.8 1.0 5.00% 3.13% 0.013 3.7 0.214 1.35 0.086 0.081 CB14 0.027 0.108 4.8 0.5 2.80% 3.13% 0.013 3.3 0.166 1.35 0.057 0.037 CB13 0.170 0.207 4.8 1.0 3.80% 3.13% 0.013 3.9 0.242 1.35 0.104 0.089 CB12 0.167 0.256 6.0 1.5 3.80% 3.13% 0.013 4.6 0.336 1.35 0.168 0.128 CB10 0.086 0.214 4.8 1.0 2.70% 3.13% 0.013 4.3 0.282 1.35 0.131 0.099 CB11 0.354 0.542 4.8 2.6 3.80% 6.3 7.33 11-17-14 STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut APPENDIX D Inspection Log Sheets -28- Stormwater Construction Site Inspection Report General Information Project Name West River Farms Subdivision NPDES Tracking No. Location 329-341 Scantic Road Date of Inspection Start/End Time Inspector's Name(s) Inspector's Title(s) Inspector's Contact Information Inspector's Qualifications Describe present phase of construction Type of Inspection: ❑ Regular ❑Pre-storm event ❑ During storm event ❑Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes ❑No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): Weather at time of this inspection? ❑ Clear ❑Cloudy ❑ Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: Have any discharges occurred since the last inspection? ❑Yes ❑No If yes,describe: Are there any discharges at the time of inspection? ❑Yes ❑No If yes,describe: Site-specific BMPs 1 Number the structural and non-structural BMPs identified in your SWPCP on your site plan and list them below(add as many BMPs as necessary). Carry a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required BMPs at your site. 1 Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Action Log. BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 1 Perimeter Silt Fence ❑Yes ❑No ❑Yes ❑No 2 Construction Exit Pad ❑Yes ❑No ❑Yes ❑No 3 Soil Stockpiles ❑Yes ❑No ❑Yes ❑No 4 Diversion SwalesBerms ❑Yes ❑No ❑Yes ❑No 5 Inlet Protection ❑Yes ❑No ❑Yes ❑No 6 Stormwater Basin#1 ❑Yes ❑No ❑Yes ❑No 7 Outfall#1 ❑Yes ❑No ❑Yes ❑No 8 9 10 11 Inspection Report 1 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 12 Overall Site Issues Below are some general site issues that should be assessed during inspections. Customize this list as neededfor conditions at your site. BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and ❑Yes ❑No ❑Yes ❑No disturbed areas not actively being worked properly stabilized? 2 Are natural resource ❑Yes ❑No ❑Yes ❑No areas(e.g.,streams, wetlands,mature trees, etc.)protected with barriers or similar BMPs? 3 Are perimeter controls ❑Yes ❑No ❑Yes ❑No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are receiving waters ❑Yes ❑No ❑Yes ❑No free of any sediment deposits? 5 Is the construction exit ❑Yes ❑No ❑Yes ❑No preventing sediment from being tracked into the street? 6 Is trash/litter from work ❑Yes ❑No ❑Yes ❑No areas collected and placed in covered dumpsters? 7 Are materials that are ❑Yes ❑No ❑Yes ❑No potential stormwater contaminants stored inside or under cover? 8 Are non-stormwater ❑Yes ❑No ❑Yes ❑No discharges(e.g.,wash water,dewatering) properly controlled? 9 (Other) ❑Yes ❑No ❑Yes ❑No 10 (Other) ❑Yes ❑No ❑Yes ❑No Inspection Report 2 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? Non-Compliance Describe any incidents of non-compliance not described above: Describe any interim measures recommended and/or implemented to address non-compliance issues until such time as a permanent corrective action can be designed and implemented: Certification I have personally examined and am familiar with the information submitted in this document and all attachments thereto, and I certify that, based on reasonable investigation, including my inquiry of those individuals responsible for obtaining the information, the submitted information is true, accurate and complete to the best of my knowledge and belief. I understand that a false statement made in this document or its attachments may be punishable as a criminal offense, in accordance with section 22a-6 of the Connecticut General Statutes, pursuant to section 53a- 157b of the Connecticut General Statutes, and in accordance with any other applicable statute. Print name and title: Signature: Date: Inspection Report 3 STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut APPENDIX E Stormwater Monitoring Report (SMR) Form -29- Connecticut Department of Energy & Environmental Protection Bureau of Materials Management & Compliance Assurance Water Permitting & Enforcement Division General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, issued 8/21/13, effective 10/1/13 Stormwater Monitoring Report SITE INFORMATION Permittee: Mailing Address: Business Phone: ext.: Fax: Contact Person: Title: Site Name: Site Address: Receiving Water(name, basin): Stormwater Permit No. GSN SAMPLING INFORMATION (Submit a separate form for each outfall) Outfall Designation: Date/Time Collected: Outfall Location(s)(lat/Ion or map link): Person Collecting Sample: Storm Magnitude(inches): Storm Duration (hours): Size of Disturbed Area at any time: MONITORING RESULTS Sample# Parameter Method Results(units) Laboratory (if applicable) 1 Turbidity 2 Turbidity 3 Turbidity 4 Turbidity (provide an attachment if more than 4 samples were taken for this outfall) Avg = STATEMENT OF ACKNOWLEDGMENT I certify that the data reported on this document were prepared under my direction or supervision in accordance with the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities. The information submitted is,to the best of my knowledge and belief,true, accurate and complete. Authorized Official: Signature: Date: Please send completed form to: DEPARTMENT OF ENERGY&ENVIRONMENTAL PROTECTION BUREAU OF MATERIALS MANAGEMENT AND COMPLIANCE ASSURANCE 79 ELM STREET HARTFORD,CT 06106-5127 ATTN: NEAL WILLIAMS DEEP-WPED-SMR-015 1 of 1 Rev.9/3/13 STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut APPENDIX F Contractor Certification Statement -30- Stormwater Pollution Control Plan West River Farms — 69 Lot PRD Sudivision Scantic Road, East Windsor, CT Contractor Certification Each contractor and subcontractor working on this project must sign the following certification CERTIFICATION "I certify under penalty of the law that I have read and understand the terms and conditions of the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities. I understand that as a contractor or subcontractor at this site, I am authorized by this general permit, and must comply with the terms and conditions of this permit, including but not limited to the requirements of the Stormwater Pollution Control Plan prepared for this site." Contracting Firm Printed Name and Title of Person Signing Certification Street Signature City, State, Zip Location of Work Area Telephone Date Contracting Firm Printed Name and Title of Person Signing Certification Street Signature City, State, Zip Location of Work Area Telephone Date Contracting Firm Printed Name and Title of Person Signing Certification Street Signature City, State, Zip Location of Work Area Telephone Date STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut APPENDIX G Natural Diversity Database Correspondence -3 l- onnecticut Department of L �,IERGY & ENVIRONMENTAL Bureau of Natural Resources ROTECTION Wildlife Division Natural History Survey—Natural Diversity Data Base JIM September 24, 2015 Ms. Dana Steele J.R. Russo &Associates, LLC 1 Shoham Road East Windsor, CT 06088 Regarding: West River Farms, 329-341 Scantic Road, East Windsor—new residential construction -Natural Diversity Data Base 201505084 REVISED Dear Ms. Steele: In response to your request for another Natural Diversity Data Base (NDDB) Review of State-listed Endangered, Threatened, and Special Concern Species for West River Farms in East Windsor, I have revised the recommendations for the protection of bats based on recent guidance received for the United States Fish and Wildlife Service (USFWS). Our records for this site indicate the following extant populations of species on or within the vicinity of the site: Northern Long-eared Bat(Myotis septentrionalis) Status: Federally Threatened and State Endangered Species Little brown bat(Myotis lucifugus) Status: State Endangered Species Several bat species such as Northern long-eared bats and little brown bats have been affected by white-nose syndrome (WNS)which has killed thousands of bats in Connecticut and throughout New England. The U.S. Fish and Wildlife Service (USFWS)has determined that just the Northern long-eared bat population has declined by 90 percent in New England since the appearance of WNS. The Department of Energy and Environmental Protection(DEEP) has been actively involved with investigating the impact of WNS since 2007. DEEP, other state wildlife agencies in the Northeast, the USFWS, and many other academic and conservation partners are working in concert to find solutions and stop this unparalleled mortality. Recommendations: Tree cutting should be conducted in the winter when the bats are not in the area, specifically work should not be conducted after April 15th through September 30th. Long-term impacts can be minimized by retaining large diameter coniferous and deciduous trees whenever possible. If these bats are found,please report the information to the Wildlife Division. The Natural Diversity Data Base includes all information regarding critical biological resources available to us at the time of the request. This information is a compilation of data 79 Elm Street,Hartford,CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer collected over the years by the Department of Energy and Environmental Protection's Natural History Survey and cooperating units of DEEP,private conservation groups and the scientific community. This information is not necessarily the result of comprehensive or site-specific field investigations. Consultations with the Data Base should not be substituted for on-site surveys required for environmental assessments. Current research projects and new contributors continue to identify additional populations of species and locations of habitats of concern, as well as, enhance existing data. Such new information is incorporated into the Data Base as it becomes available. If the project is not implemented within 12 months, then another Natural Diversity Data Base review should be requested for up-to-date information. Please be advised a more detailed review may be conducted as part of any subsequent environmental permit applications submitted to the Department of Energy and Environmental Protection for the proposed site. Should state involvement occur in some other manner, specific restrictions or conditions relating to the species discussed above may apply. Thank you for consulting the Natural Diversity Data Base. If you have further questions, I can be reached by email at Elaine.hinschnct.gov. Sincerely, /s/ Elaine Hinsch Program Specialist II Wildlife Division STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut APPENDIX H Subdivision Construction Plan Set (Sheets 1-25) -32- STORMWATER POLLUTION CONTROL PLAN West River Farms — 69-Lot Planned Residential Development Subdivision Scantic Road, East Windsor, Connecticut APPENDIX I Notice of Termination Form -33- _d 1, General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities Notice of Termination Form Please complete and submit this form in accordance with the general permit(DEP-PED-GP-015) in order to ensure the proper handling of your termination. Print or type unless otherwise noted. Note: Ensure that for commercial and industrial facilities, registrations under the General Permit for the Discharge of Storm water Associated with Industrial Activity(DEP-PED-GP-014)or the General Permit for the Discharge of Stormwater from Commercial Activities(DEP-PED-GP-004) have been filed where applicable. For questions about the applicability of these general permits, please call the Department at 860-424-3018. Part I: Registrant Information 1. Permit number: GSN 2. Fill in the name of the registrant(s)as indicated on the registration certificate: Registrant: West River Farms, LLC 3. Site Address: 329-341 Scantic Road City/Town: East Windsor State: CT Zip Code: 06088 4. Date all storm drainage structures were cleaned of construction sediment: Date of Completion of Construction: Date of Last Inspection (must be at least three months after final stabilization pursuant to Section 6(b)(6)(D) of the general permit): 5. Check the post-construction activities at the site (check all that apply): ❑ Industrial ❑ Residential ❑ Commercial ❑ Capped Landfill ❑ Other(describe): Part II: Certification "I have personally examined and am familiar with the information submitted in this document and all attachments thereto, and I certify that, based on reasonable investigation, including my inquiry of those individuals responsible for obtaining the information, the submitted information is true, accurate and complete to the best of my knowledge and belief. I understand that a false statement made in this document or its attachments may be punishable as a criminal offense, in accordance with Section 22a-6 of the Connecticut General Statutes, pursuant to Section 53a-157b of the Connecticut General Statutes, and in accordance with any other applicable statute." Signature of Permittee Date Name of Permittee (print or type) Title (if applicable) Note: Please submit this Notice of Termination Form to: STORMWATER PERMIT COORDINATOR BUREAU OF WATER MANAGEMENT DEPARTMENT OF ENVIRONMENTAL PROTECTION 79 ELM STREET HARTFORD, CT 06106-5127 Bureau of Water Management DEP-PED-NOT-015 1 of 1 Rev.04/08/04 O%qN Sfco Zi q _ �.: 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 r�OSOR-CO TELEPHONE (860) 644-2511 June 2, 2016 Jeffrey Respler West River Farms, LLC c/o Jay Ussery J. R. Russo &Associates, LLC 1 Shoham Road East Windsor, CT 06088 Dear Mr. Respler: Re: Preconstruction Meeting for Appl. 15-11P, West River Farms, LLC IN ATTENDANCE Name Company E-MAIL Phone number Michele R. Lipe SW Planning michele.li e southwindsor.or 644-2511 x252 Jeffrey Doolittle SW Engineering 'effre .doolittle southwindsor.or 644-2511 x245 Christopher Duchesne SW Police Dept. christo her.duchesne southwindsor.or 860-648-6273 Jay Ussery J.R. Russo &Assoc. 'usser na'rrusso.com 860-623-0569 Brian DiMartino, Sr. B. DiMartino & 860-635-2241 Sons Brian DiMartino, Jr. B. DiMartino & bdimar@bcglobal.net 860-759-2066 Sons Jeff Respler West River Farms, plmbgsol cr aol.com 646-321-9290 LLC The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Senior Environmental Planner for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction at 860-644-2511 Ext. 229. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). 3. During construction a crushed stone tracking pad may need to be installed and maintained to minimize tracking of dirt/gravel on to Scantic Road. Calcium chloride or water is to be used for dust control as required. 4. Install and stabilize the detention basin and swale on site first. Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major construction work in (Road Name) with inspections and testing per Developers Checklist for the following: a. After site is staked out b. All drainage work and the installation of stormwater detention basin 3. Certification of gravel used as subbase and processed stone for base will be required from an approved testing company 4. Certification of all products used -- storm pipe and structures shall be presented to the Town Engineer prior to installation. 5. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 6. An as built plan will be required for the improvements to [Road]. A separate as built plan will be required. 7. All pipe and structures to be backfilled with free draining material compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 8. Any problems and/or questions regarding construction of this project will be directed to Brian DeMartino in the field at cell phone 860-301-9270. 9. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 10. Job meetings will be held as needed, and can be called by the developer or Town. 11. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 12. Normal hours of operation 7:00 a.m. —5:00 p.m.,no work on Sunday. 13. DOT permit needed for all work within state road. Copy must be given to the Engineering Department. 14. Inspection of gravel access road is required Planning Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Department. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. 2. All bonds required; mylar to go on file prior to issuance of building permit. Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 through 6-802. 3. Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are excluded. 4. Erect temporary sign on the site during construction identifying the project. 5. If an alarm is to be installed contact Police Services. Very truly ours, Michele R. Lipe,AICP Director of Planning MRL/llz cc: Jeffrey Doolittle, Town Engineer Bernie Drabek,Engineering Inspector Michael Gantick, Public Works Christopher Dougan, Chief Building Official Fred Shaw, Superintendent of Pollution Control Walter Summers, Fire Marshal Utilities PRECONSTRUCTION MEETING SIGN-IN SHEET PLEASE Print Clearly !0!,!1c Cc G��i�.J �'SDI ( 1J9ScC. iili�lf v4ri�� ril�, W� �'� 20 1 r�i 049 pweHc;,4u 'v`�6''° J G. 60AI e6Y 3 ) � � 1 v .,.OWN Sf4 co F Tim 07 � C.1 U 9 • �� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 soa•co� TELEPHONE (860) 644-2511 May 4, 2017 West River Farms, LLC/Jeffrey Respler C/o J.R. Russo &Associates, LLC/Dana Steele 1 Shoham Road East Windsor, CT 06088 Dear Mr. Respler: Re: Expiring Letters of Credit for Appl. 15-11P, West River Farms, LLC The Planning and Zoning Commission is holding the following Letters of Credit: PROJECT BANK AMOUNT EXPIRATION West River Farms United $ 20,000 Invasive Plant Removal 7/5/17 West River Farms United $ 25,000 Erosion& Sediment 7/5/17 West River Farms United $ 50,000 Stormwater 7/5/17 In accordance with our policy for accepting Letters of Credit in lieu of surety bonds, we must have an amendment to each expiring Letter of Credit well in advance, extending the term for a one-year period from the expiration date. Will you please forward us the amendment promptly? Very truly your Michele R. Lipe Director of Planning MRL/llz t�WN Sfq Oy F / 0� V/ slou V&U&olt C D 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 SOR-CO TELEPHONE (860) 644-2511 June 5, 2017 West River Farms, LLC/Jeffrey Respler C/o J.R. Russo &Associates, LLC/Dana Steele 1 Shoham Road East Windsor, CT 06088 Dear Mr. Respler: Re: Expiring-Letters of Credit for Appl. 15-I 1 P, West River Farms, LLC The Planning and Zoning Commission is holding the following Letters of Credit: PROJECT BANK AMOUNT EXPIRATION West River Farms United $ 20,000 Invasive Plant Removal 7/5/17 West River Farms United $ 25,000 Erosion& Sediment 7/5/17 West River Farms United $ 50,000 Stormwater 7/5/17 We have not as yet received renewals of the Letters of Credit, which expire on July 5, 2017 as noted in our previous renewal request dated May 4, 2017. Please be advised that discussion of this matter will be placed on the June 27, 2017 agenda of the Planning & Zoning Commission. Calling of the letters of credit will be initiated at that time if we have not received a renewal. If you have any questions,please contact the Planning Department at 860-644-2511, ext. 253. Thank you. Very truly yours, I Michele R. Lipe Director of Planning MRL/llz - --- Town O-P Sot,,A U m 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 f�OSOR-co TELEPHONE (860) 644-2511 June 4, 2018 West River Farms, LLC/Jeffrey Respler C/o J.R. Russo &Associates, LLC/Dana Steele 1 Shoham Road East Windsor, CT 06088 Dear Mr. Respler: Re: Expiring Letters of Credit for Appl. 15-11P, West River Farms, LLC The Planning and Zoning Commission is holding the following Letters of Credit: PROJECT BANK AMOUNT EXPIRATION West River Farms United $ 20,000 Invasive Plant Removal 7/5/18 West River Farms United $ 25,000 Erosion& Sediment 7/5/18 West River Farms United $ 50,000 Stormwater 7/5/18 In accordance with our policy for accepting Letters of Credit in lieu of surety bonds, we must have an amendment to each expiring Letter of Credit well in advance, extending the term for a one-year period from the expiration date. Will you please forward us the amendment promptly? If you have any questions,please contact the Planning Department at 860-644-2511, ext. 253. Thank you. Very truly YoUrS. Michele R.Lipe Director of Planning MRL/llz 'OWN Sf4 70� 07e w� 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 SOR-Co�e� TELEPHONE(860)644-2511 June 15, 2018 West River Farms, LLC/Jeffrey Respler C/o J.R. Russo &Associates, LLC/Dana Steele 1 Shoham Road East Windsor, CT 06088 Dear Mr. Respler: Re: Expiring Letters of Credit for Appl. 15-11P, West River Farris, LLC The Planning and Zoning Commission is holding the following Letters of Credit: PROJECT BANK AMOUNT EXPIRATION West River Farms United $ 20,000 Invasive Plant Removal 7/5/18 West River Farms United $25,000 Erosion& Sediment 7/5/18 West River Farms United $ 50,000 Stormwater 7/5/18 We have not as yet received renewals of the Letters of Credit, which expire on July 5, 2018 as noted in our previous renewal request dated June 4, 2018. Please be advised that discussion of this matter will be placed on the June 26, 2018 agenda of the Planning & Zoning Commission. Calling of the letters of credit will be initiated at that time if we have not received a renewal. If you have any questions, please contact the Planning Department at 860-644-2511, ext. 253. Thank you. Very truly yours, Michele R.Lipe Director of Planning MRL/llz SOW N- S fqt a 0-p 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 �J��soe•co`'� TELEPHONE (860) 644-2511 July 13,2018 West River Farms, LLC/Jeffrey Respler C/o J.R. Russo &Associates,LLC/Dana Steele 1 Shoham Road East Windsor, CT 06088 Dear Mr. Respler: RE: Appl. 15-11P, West River Farms, LLC Bond Releases This is to advise you that the Planning and Zoning Commission voted on July 10, 2018 to reduce the following bonds as follows: Appl. 15-11P, West River Farms $50,000 Stormwater Bond reduced by$50,000 to leave a balance of-0-. Appl. 15-11 P, West River-Farms $25 000 E&S Bond reduced by$12,500 to leave a balance of$12,500. Please forward amendments to the Letter of Credit we are currently holding at your earliest convenience. If you have any further questions contact the Planning Department at 860-644-2511, Ext. 329. Thank you. Sincerely, Bart Pacekonis,Chairman PLANNING&ZONING COMMISSION BP/llz cc: Town Engineer Environmental Planner PLANNING DEPARTMENT June 29.2026 West River Farms,LLC /Jeffrey Respler c/o J.R.Russo &Associates,LLC /Dana Steele 1 Shoham Road East Windsor,CT 06088 To Whom It May Concern: Re:Appl.#15-1 1P,West River Farms This is to advise you that the Planning and Zoning Commission voted on June 23‘2026 to release the $5,000 erosion and sedimentation control bond and the $15.000 wetlands bond for the above referenced application. Advanced arrangements should be made to pick up the letters of credit from the Planning Department. If you have any further questions,please contact the Planning Department at 860-644— 251 l.ext.2253i Thank vou. Sincerely. Paul Bemstein.Chairman Planning &Zoning Commission PBgs cc:Town Engineer ChiefBuilding Official 154D Sullivan Avenue,South Windsnr,CT 08074 i Tel (HEB)Ell—2511 Ext 2329 l Planning@SuuthWindsur-Bl.gnv