September 19, 2013
Karen Isherwood, PE
Isherwood Civil Engineering
58 Ordway Drive
South Windsor, CT 06074
RE: Modification to Appl. #13-23P AMOLIN Pita, 361 Pleasant Valley Road
Dear Ms. Isherwood:
At the September 18, 2013 regular meeting, the Inland Wetlands Agency/Conservation Commission
approved Modification to Existing Permit - Appl.# 13-23W - Amoun Pita & Distribution — 361, Pleasant
Valley Road — Inland Wetland/Conservation Commission application for the construction of a entrance
drive and storage yard for an existing industrial site and associated improvements on property located
southerly of Pleasant Valley Rd-and easterly of Jeffrey Drive, Industrial (1) Zone, with the following
conditions:
1. The final approved copy of the entire set of plans and this letter reproduced thereon must be
submitted to the Planning Department. This must be completed within 65 days of approval prior
to any construction activity on the site. Plans submitted to Planning & Zoning Commission shall
be considered having met this requirement.
2. The application shall indemnify and hold harmless the Town of South Windsor against any
liability, which might result from the proposed operation or use.
3. The permit is valid for five years and shall expire on July 17, 2018. It is the
landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a
renewal request at least 65 days prior to expiration.
4. A bond shall be collected in the amount of $30,000 for establishment of the stormwater system.
A bond shall be collected in the amount of $20,000 to ensure adequate erosion control is
constructed and maintained through the construction process. A bond shall be collected in the
amount of$10,000 to ensure proper establishment of habitat plantings as mitigation.
5. All approvals required must be obtained and submitted prior to any activity on the site.
6. A contact person shall be identified on the plans.
7. All the swales must be stone lined.
8. Habitat plantings and a plant list must be provided and approved by town staff.
9. A maintenance plan for all the water quality structures is to be included, showing access and
stating who is responsible for the maintenance of these basins.
10. An overall approval condition is incorporation of Jeff Doolittle's 7/17113 memo to Jeff Folger,
Senior Environmental Planner, with specific requirements to be put in place as applicable as an
approval condition.
11. Establishment of maintenance procedures to ensure contaminated wastewater and materials
from inside the building is contained and collected, and disposed of offsite.