February 3, 2012 tirJ�
RECEIVEp
LRC Group FEB Q 0 C
160 West Street, Suite "E"
Cromwell, CT 06416 80UfMWINp M
Attn: John Wagenblatt
Dear Mr. Wagenblatt:
Subject: Colonial Center and Proposed Medical Office
Route 30 (Ellington Road) & Route 194 (Sullivan Avenue)
South Windsor, CT
This is to confirm receipt of a submission made in support of obtaining an encroachment
permit regarding the above-referenced project. Additional data is, however, required in order for
v the petition,application or request to be considered complete. As a result of a preliminary review
of the plans entitled Proposed Medical Office Building, prepared by LRC Group which were last
revised on October 28, 2011 and received by this office on December 7, 2011, the following
comments must be addressed in order for the review to commence:
1. The Sign Legend shown on Sheet SP1 needs to include the Department's Sign Catalog
numbers for signs posted in the State right-of-way in order to ensure proper size and
retro-reflectivity. Signs must also be installed in accordance with the Department's
typical detail sheets for height and breakaway post.
2. The Route 194 site drive channelizing island needs to be constructed 2' back from the
Sullivan Avenue extended gutter line.
3. The work necessary to construct the new Route 194 right turn lane will require exposing
and relocating an existing 2" RMC conduit for traffic signal coordination. The plans
need to address this conduit and how it will be relocated.
4. The Route 194 pavement restoration needs to be shown on the plans. The new right turn
lane will need to be transitioned into the South Windsor Town Hall/Library Drive. The
plans need-to include the-proposed`driveway contours and extent of mill and overlay. It
appears the Town Hall driveway apron will require a complete mill and overlay in order
to provide a smooth transition. As part of the mill and overlay, the existing Route 194
solid white shoulder line will also need to be milled prior to installing the final top course
and new pavement markings. '