Loading...
HomeMy WebLinkAboutApplication Files_85051_pg0114 Proposed Medical Office Building ' p 9 South Windsor, Connecticut Submitted., November 29,2010 Engineering Summary Report Revised January 4,2011 Introduction ' This Engineering Summary Report is prepared to review the site engineering and storm water drainage design of the Proposed Medical Office Building, located at 1559 Sullivan Avenue and ' 29 Community Road, in South Windsor, Connecticut. This Engineering Summary Report is completed in accordance with the Town of South Windsor Regulations. Existing Site Conditions The existing site is presently a 1.6 acre lot located the western side of Sullivan Road. The ' property contains a 1 story wood frame house. The lot currently consists of some patches of woodland and for the most part has well maintained grass cover. The topography slopes down from Sullivan Avenue towards the commercial development located atthe rear of the site. ' The existing site contains 2 separate soil classifications. Scitico, Shaker, and Maybid soils, nearly level, and Urban Land consists of areas consisting mostly of sites for buildings, paved ' roads, and parking lots. These two soil groups cover the site and are considered to be Soil type D. Currently, the surface runoff exits the site at three location r ' s referred to as the Outlet Points. Outlet Point#1 sheet flows from the site along the southern property line. Outlet Point#2 sheet flows to the northwestern property line. Outlet Point #3 is an existing catch basin located in the ' adjoining property. This catch basin collects the runoff that sheet flows from the site along the western property line to the asphalt parking area and through the existing storm drainage system. This outlet point does include the flow from the site to the existing catch basin along the , western property line to Outlet Point#3. Proposed Improvements ' The proposed build out for the project proposes to remove the existing 1 story wood frame house and construct a new building. The building will be a two story Medical Office of t7,039 square feet per floor, as well as associated parking and infrastructure improvements; including utilities, landscaping, site lighting and drainage. ' The project increases .the total hard surface to approximately. 0.82 acres. The -increase in impervious area will cause an increase in the peak rate of runoff leaving the site from Outlet ' Point #2 and #3. Therefore, on-site stormwater detention will be required, including Water Quality (per State of Connecticut Department of Environmental Protection requirements) in the form of the removal of at least 80% of the Total Suspended Solids (TSS). ' Page 2 '