HomeMy WebLinkAboutApplication Files_85051_pg0068 Traffic Impact Study
Medical Office Building
Re used January 21,2011
5. The Applicant will require waivers from the South Windsor Planning&Zoning Commission
' for"corner clearance spacing"and"opposite driveway spacing".
' 6. The proposed development should be interconnected with the adjacent-Colonial Centere to
share vehicular and pedestrian access. As the aggregate development will provide more than
200 on-site parking spaces, in accordance with Connecticut General Statute 14-311, the
applicant shall apply for and obtain a Major Traffic Generator Certificate from the State
Traffic Commission(STC).
7. As Route 194 (Sullivan Avenue) is a State highway, the Applicant shall obtain an
Encroachment Permit from the CTDOT District 1, Special Services Section, Permits Office
in Rocky Hill, Connecticut. The owner/ contractor shall provide the required performance
bonds and liability insti ranc a certificate.
' Thank you for the opportunity to review these issues associated with this development. If you
have any questions or concerns,please feel fires to contact me at(203)915-8301.
Respectfully Submitted.,
Robert V.Bahramaitis,P.E.
1
Paae 18 0£18