Loading...
HomeMy WebLinkAboutApplication Files_85051_pg0068 Traffic Impact Study Medical Office Building Re used January 21,2011 5. The Applicant will require waivers from the South Windsor Planning&Zoning Commission ' for"corner clearance spacing"and"opposite driveway spacing". ' 6. The proposed development should be interconnected with the adjacent-Colonial Centere to share vehicular and pedestrian access. As the aggregate development will provide more than 200 on-site parking spaces, in accordance with Connecticut General Statute 14-311, the applicant shall apply for and obtain a Major Traffic Generator Certificate from the State Traffic Commission(STC). 7. As Route 194 (Sullivan Avenue) is a State highway, the Applicant shall obtain an Encroachment Permit from the CTDOT District 1, Special Services Section, Permits Office in Rocky Hill, Connecticut. The owner/ contractor shall provide the required performance bonds and liability insti ranc a certificate. ' Thank you for the opportunity to review these issues associated with this development. If you have any questions or concerns,please feel fires to contact me at(203)915-8301. Respectfully Submitted., Robert V.Bahramaitis,P.E. 1 Paae 18 0£18