Loading...
HomeMy WebLinkAboutApplication Files_85051_pg0029 11. All free standing signs and/or building signs require the issuance of a sign permit before they are erected. 12. If a State Traffic Commission certificate is required, no building permits will be issued until the certificate has been issued(per CGS §14-311). 13. Engineering comments dated 2/8/11 must be addressed to the satisfaction of the town engineer. 14. A landscape architect must seal the landscape plan(as required in the buffer regulation). 15. A Land surveyor must seal the A-2 Boundary Survey as well as the site plan as new property boundaries are being established. 16. Additional landscaping is required along the parking area between the retaining wall and property line in accordance with Table 6.4.6.A. 17. Landscaping and/or screening is required around the proposed transformer. 18. All access and parking lot improvements on the property at 1720-1740 Ellington Road must be completed prior to the issuance of the certificate of occupancy. 19. The Town's Parks and Grounds Division will review the final changes to the town hall property. At that time,the trees to be removed will be assessed and a landscape plan must be submitted for approval. The removal of the trees on the town property is subject to the Tree removal procedure as laid out in the statutes. 20. The right hand turn lane into town hall drive must be modified in accordance with the recommendation of Jim Bubaris, Traffic Engineer, and dated 2/8/11. 21. In accordance with Section 5.4.1 a waiver has been granted to sub section B.7 Access spacing and subsection C.1 Corner clearances and is subject to the following: • An easement allowing cross access to and from the adjacent property to the west known as Colonial Cornere development must be filed, and • An easement allowing cross access to and from the adjacent property on Sullivan Avenue must be shown granting irrevocable permission to enter upon and perform all activities needed to construct the driveway, on both properties on which the driveway will be constructed. At such time as a site plan is approved for the property to the immediate north, an interconnection shall be constructed in the area shown on the subject site plan OR as agreed by the two property owners and further approved by the Planning and Zoning Commission. Failure to construct the site interconnection shall be construed as a zoning violation and shall be pursued via the remedies available to the Town of zoning violations. In accordance with the provisions of Section 5.5.4E, the applicant shall record on the land records an agreement that remaining access rights along Sullivan Ave will be dedicated to the Town and that the temporary curb cut will be closed after the joint-use driveway is constructed. 22. Any reference to a loading dock in the notes should be eliminated. 23. A snow shelf should be provided along the northern side of the access drive.