HomeMy WebLinkAboutApplication Files_85048_pg0371 ** PLAN REVIEW COULD TAKE 30 DAYS FOR APPROVALS **
2) Inspections:
a. Above ceiling
b. Penetrations and separations
c. Sprinkler system
A. Hydraulic calculations and cut sheets
B. Underground flush and hydrostatic test
C. System hydrostatic test
D. Main drain test/inspectors test
E. Outside bell
F. NFPA 13 paperwork
d. Fire Alarm
e. Emergency lighting test
f. Final Inspection
** PLEASE NOTE THE FOLLOWING**
1. Consulting inspection will be welcomed
2. Multiple inspections can be done on the same day
3. Stocking/addition of fixtures to occupancy will only be allowed if the life safety systems are on
line.
Police Services
1. Emergency phone numbers for the duration of the construction must be provided to Police Services on
a company letterhead. If the developer occupies or owns the building after construction emergency
numbers must be provided to Police Services.
2. All buildings located on property that abuts a public highway must be numbered and visible from the
street. All numbering shall comply with Town Ordinance 6-800 through 6-802.
3. Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are
excluded.
4. Erect temporary sign on the site during construction identifying the project.
5. If an alarm is to be installed contact Police Services.
Building Department
1. Plan review with Building Official/Fire Marshal required prior to application for building permit.
Coordinate with Chief Building Official.
Verryy,truly yours,
Michele R. Lipe,AICP
Director of Planning
MRL/llz