Loading...
HomeMy WebLinkAboutApplication Files_85048_pg0368 SOVIN af4 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 OR•co TELEPHONE(860) 644-2511 February 3, 2015 Donald Stevens Orlando Annulli& Sons, Inc. P.O. Box 610 Manchester, CT 06045-0610 Dear Mr. Stevens: Re: Preconstruction Meeting for Appl. 11-05P,FedEx Phase 2 IN ATTENDANCE Name Company E-MAIL Phone number Michele R. Lipe SW Planning michele.lipe@southwindsor.org 644-2511 x252 Jeffrey Doolittle SW Engineering jeffrey.doolittle@southwindsor.org 644-2511 x245 Bernie Drabek SW Engineering bemard.drabek@southwindsor.org 644-2511 x241 Walter Summers SW Fire Marshal walter.summers@southwindsor.org 644-2511 x217 Michael Rose SW Building michael.rose@southwindsor.ora 644-2511 x233 Glenn Buonanducci SW Police Dept. lenn.buonanducci@southwindsor.or 860-644-2551 Don Stevens Orlando Annulli& don@annulli.com 860-644-2427 Sons, Inc. Darren Wilcox Wilcox Excavating wilcoxsitework@gmail.com 860-742-3095 Construction Company, Inc. Brad Downey Orlando Annulli & brad@annulli.com 860-644-2427 Sons, Inc. The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth erosion and sedimentation control measures are to be in place prior to earth movie operations in each area and maintained/cleaned out area and maintained/cleaned out duringconstruction. Call Jeffrey Folger, Senior Environmental Planner for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction at 860-644-2511 Ext. 229. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). 3. During construction a crushed stone tracking pad may need to be installed and maintained to minimize tracking of dirt/gravel on to Kennedy Road. Calcium chloride or water is to be used for dust control as required.