HomeMy WebLinkAboutApplication Files_85048_pg0367 RECEIVED
TOWN OF SOUTH WINDSOR k�, ,,n a-
STAFF SITE CHANGE r'4i 9 { G! u
FOR SITE & SUBDIVISION S0aWINmPLAMiNGDEPT.
Andrew Krar, P.E.
�r1GE ORDER CONTACT PERSON Design Professionals, Inc. Phone No. 860-291-8755
ddress 21 Jeffrey Drive South Windsor,CT 06074
Site Name FedEx Ground P&Z No. 11-05P
Owner SunCap Property Group Phone No. (704)945-8012
Contractor T.B.D.
Signature of Owner Date:
Signature of Design Engr. Date: / �3 �1
CHANGE: (Describe location and nature of change. Include
Four (4) copies of plan/profile of Change. )
Two Changes:
1. Main access road,egress lane,south of security building, radius changed from 50'to 100'.
2. "Deadline" parking spaces north of the phase 2 vehicle maintenance garage..the western curb line moved 22.7'
west.As a result, basin#5 will be filled in and some minor storm drainage features will be modified.Very large
decreases in peak discharges were previously reported for this project, by inspection it should be clear that this
change is minimal in regards to impact to such peak discharges.
Reason for Change: (Why is change required)
Tenant requirements
APPROVALS: (As Required)
Dir. Of Planning Date
Town Engineer_ Date:- 'z s/0r
Dir. of Public Wor Date:
Other: Date:
STAFF COMMENTS: n
aPAa24 n P Q ntid.L,li b� )roil' oy1 2 T 7��(,' -
P i1►�,.,� � �, j�//.��= �^`S�^mac, r�-y,�� /'a-,-�'� .fir,o c � t��- �)n ��,�'-e f
I
I
White - Town Engineer Yellow - Applicant
Pink - Director of Planning