HomeMy WebLinkAboutApplication Files_85048_pg0332 The following is a brief summary of points discussed during the meeting:
Erosion and Sedimentation Control
1. All erosion and sedimentation control measures are to be in place prior to earth moving onerations in
each area and maintained/cleaned out during construction. Call Jeffrey Folger, Senior Environmental
Planner for inspection when measures are in place, prior to commencement of site work or if any
problems/concerns arise during construction.
2. All topsoil stockpile areas to be protected(ringed with haybales or equal).
3. During construction a crushed stone tracking pad may need to be installed and maintained to minimize
tracking of dirt/gravel on Kennedy Road and/or Sullivan Avenue. Calcium chloride or water is to be
used for dust control as required.
Public Works
1. McShane Construction will have a full-time superintendant on site and they have not selected a site
construction contractor yet. They will let the Town know who will be doing this work when it's
determined.
2. McShane will have Design Professionals revising the site plans. They will submit a surcharge plan
and revised site plans(grading&utilities)as a change order.
3. Three complete sets of approved/revised plans to be provided to Town prior to start of construction.
They will be stamped by the Planning Department along with plans developer needs. Only approved
plans are to be used on the job site.
4. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major
construction work in West Road with inspections and testing per Developers Checklist for the
following:
a. After site is staked out
b. All drainage work
c. Preparation of subgrade,compaction tests as per specifications
d. Placement of bituminous concrete,two(2)inch layers maximum
S. Certification of gravel used as subbase and processed stone for base will be required from an approved
testing company
6. Certification of all products used -- storm pipe, structures, pavement, oil/grit separator and sewer
grinder pump system shall be presented to the Town Engineer prior to installation.
i
7. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation.