Loading...
HomeMy WebLinkAboutApplication Files_85048_pg0242 POST DEVELOPMENT- DP2 2007-058 Jones-Post DP2 Type/1/24-hr 25-year Rainfall=5.50" Prepared by J.R. Russo & Associates Printed 12/2/2010 HydroCAD®8.50 s/n 002386 02007 HydroCAD Software Solutions LLC Page 5 Time span=2.00-20.00 hrs, dt=0.05 hrs, 361 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 20: To DP#2 Runoff Area=12.690 ac 12.37% Impervious Runoff Depth>1.21" Flow Length=1,200' Tc=66.8 min CN=57 Runoff=6.63 cfs 1.274 of Pond DP2: Design Point#2 Inflow=6.63 cfs 1.274 of Primary=6.63 cfs 1.274 of ,a- -